You are on page 1of 2

LIST OF TESTING CONCRETE COMPRESSIVE STRENGTH

Project: QUANG TRACH I THERMAL POWER PLANT PROJECT


EPC CONTRACTOR: CONSTRUCTION CORPORATION NO.1 - JSC
SUPPLIER: MEKONG BATCHING PLANT Date casting of R7: 25/Feb/2024 Date casting of R28: 4/Feb/2024
DATE TESTING: 03/03/2024 Quantity sample 1 1

Average
Date of Concrete Quantity of Age of
No. Item Description Sub-con Loading 1 Loading 2 Loading 3 compressive Remark
Casting Class (Mpa) samples Samples
strength
CW Rising pipe support
1 25-Feb-2024 C30 Type II (12+/-2) 1,0 Pile head treatment - CW Rising pipe support foundation (3 & 4) Tri Nhan R7
foundation
Electrical Duct Bank & Concrete work for Electrical Duct Bank & Manhole:
2 4-Feb-2024 C21 Type II (12+/-2) 1,0 Khang Duc R28
Manhole - Ductbank 003Q from Manhole R0-MH002 to Manhole R0-MH003 EL:+4.3m

Supplier Laboratory staff EPC Contractor Consultant


LIST OF TESTING CONCRETE COMPRESSIVE STRENGTH

Project: QUANG TRACH I THERMAL POWER PLANT PROJECT


EPC CONTRACTOR: CONSTRUCTION CORPORATION NO.1 - JSC
SUPPLIER MEKONG BATCHING PLANT Date casting of R3: 29/Feb/2024
DATE TESTING: 3/Mar/2024 Date casting of R7: 25/Feb/2024 Date casting of R28: 4/Feb/2024

Average
Date of Concrete Quantity of Age of
No. Item Description Sub-con Loading 1 Loading 2 Loading 3 compressive Remark
Casting Class (Mpa) samples Samples
strength

1 29-Feb-2024 C40 Type II (16±2) 1.0 Trestle Pier PSC Beam 02 (No.41) Phu Xuan R3

2 25-Feb-2024 C35 Type II (18±2) 1.0 Trestle Pier Bored pile no: P14, P15 Phu Xuan R7

Supplier Laboratory staff EPC Contractor Consultant