CABLE TRAY-LADDER- Powder Coating finish shall be used for all cable
5 MS DCRJ-RIY3-MAT-EL-044 00 ELEC EGEC C
TRUNKING-BASKET TRAY management system.
All bends, tees, cross units and angles shall be of the same
CABLE TRAY-LADDER- specification as that of the cable tray finish and shall be
8 MS DCRJ-RIY3-MAT-EL-044 00 ELEC EGEC B
TRUNKING-BASKET TRAY standard products from the same manufacturer as the
cable tray. Site fabrication shall not be permitted.
CABLE TRAY-LADDER- Highlight the proposed Cable tray & accessories catalogue
9 MS DCRJ-RIY3-MAT-EL-044 00 ELEC EGEC B
TRUNKING-BASKET TRAY number.
CABLE TRAY-LADDER- All products shall be heavy duty & hot dip galvanized after
14 MS DCRJ-RIY3-MAT-EL-044 00 ELEC EGEC C
TRUNKING-BASKET TRAY fabrication.
CABLE TRAY-LADDER- Threaded rod shall be suitable with load, the minimum
17 MS DCRJ-RIY3-MAT-EL-044 00 ELEC EGEC B
TRUNKING-BASKET TRAY acceptable diameter is 10 mm and above.
CABLE TRAY-LADDER-
27 MS DCRJ-RIY3-MAT-EL-044 00 Material list shall be provided for the project. ELEC EGEC C
TRUNKING-BASKET TRAY
CABLE TRAY-LADDER-
31 MS DCRJ-RIY3-MAT-EL-044 00 All provided cable tray to be outside flange type. ELEC EGEC B
TRUNKING-BASKET TRAY
A Approved
B Approved with comments
C Resubmit as Noted
D Rejected
E
Over All Code
Work May Proceed
Incorporate Comments - Proceed
Revise & Resubmit – Do not Proceed
Rejected
Review not Required - Proceed
Doc. Revision
A
E
F
G
H
01
02
03
04
05
06
07
08