DOCUMENT NUMBER, REV & TITLE: 4154-25-61-03-005, REV. 5, PROJECT FIRE & SAFETY PHILOSOPHY LAST REVISION STATUS: 2
5. Section 5, add VdS, HAZID, MIC ERCC, HSSD, GWP. LEL, LPG, LPCB,
ODP, P&ID, PFD, ppm, PSR, SIL, TLV, STEL, TEL, TWA,UEL, UPS, ANSI, Incorporated, descriptions have been provided
BIS, API, CIA, OSHA, EI, ATEX, ISO, IEC, SHELL DEPs, SCBA
DOCUMENT NUMBER, REV & TITLE: 4154-25-61-03-005, REV. 5, PROJECT FIRE & SAFETY PHILOSOPHY LAST REVISION STATUS: 2
7. Section 6.3.1, update the building spaces section 6.3.1 for the main spaces "high hazard spaces" in the building only
8. Section 6.3.3, guard house missing Incorporated, description for guard house has been added
please refer to section 6.4.32 HAZARDOUS AREA CLASSIFICATION SCHEDULE for
9. Section 6.3.4 revisit this section, what does it mean by hazardous
more clarification & refer to report submitted for QP with reference no. 4154-
area, is this according to NFPA
25-61-03-007
11. Section 6.4.2, all life safety design parameter shall be consistent
confirmed as per the approved life safety floor plans
with FLS plans/ FLS report, please verify and confirm
12. Section 6.3.6.4, not clear, as complying QP requirement is this as a general statement that the contractor has to obtain any approval will
perquisite for the construction phase be required by QP during the construction phase
13. section 6.3.4, please check and confirm if egress capacity
Confirmed that all egress capacity calculated for the FLS plans based on NFPA
calculations are in line with FLS plans.
14. section 6.4.4, Is this FLS plan or architectural plan? All
architectural drawing shall be consistent with FLS plans, please Confirmed
confirm
Section 6.4.11, Indicate that all safety showers and eye wash
Incorporated, note has been added
complying to ANSI/ ANSI/ISEA Z358.1
15. Section 6.4.26, Contractor shall conduct HAZID study and provide hazid study has been conducted please refer to document no. 4154-25-61-03-
action items required to be implemented during construction phase. 010
17. Section 6.4.32, update based on the meeting held on 31/08/2021 Confirmed
DOCUMENT NUMBER, REV & TITLE: 4154-25-61-03-005, REV. 5, PROJECT FIRE & SAFETY PHILOSOPHY LAST REVISION STATUS: 2
Noted and incorporated, kindly refer to the updated document (clause No.
19. Add NFPA-72
8.2.6.e & 8.2.7.f).