COMMENTS RESOLUTION SHEET (CRS)

CONTRACT NUMBER LC19103100

CONTRACT TITLE: ECS FOR NEW LABORATORY BUILDING AT QP REFINERY, MESAIEED

QP EXTERNAL TRANSMITTAL REFERENCE, DATED: PID/LC19103100/EXT/TN/0057, 02-04-2020

DOCUMENT NUMBER, REV & TITLE: 4154-0-TQ-0004, REV. 1, TECHNICAL QUERY #4 - GENERATOR LOAD LAST REVISION STATUS: 0

PREVIOUS ISSUED DRAWING NUMBER MADE VOID (IF ANY) N/A


SR. QP COMMENTS CONTRACTOR'S RESPONSE REMARKS
NO
QP Engineer Section Comments
Ref id.

1- EGEC will prepare load list specifying the categories of loads as


Noted and Considered. Please check the updated Electrical Utility Data Rev-01
1 vital, essential and non-essential as per Shell DEP 33.64.10.10, Clause
doc. no. 4154-25-16-30-111 for details.
3.2. Load list shall be prepared in order to evaluate the way forward.

1- Noted and Considered. Coordination has taken place between EGEC team
and found that the future expansion load estimate to be 400kW, kindly refer to
2- The electrical design in this project shall include the future
Key single line diagram drawing. no. 4154-25-16-32-001.
expansion loads. EGEC electrical engineer will coordinate with other
2- The future extension loads will not be
disciplines in EGEC project team (architecture engineer, Civil
considered on the sizing of the generator, as the estimated loads for the future
engineer, HVAC engineer ...etc) to estimate the future expansion
expansion shall be 400 kW, and if we consider those loads on the generator
load and submit for QP review.
sizing, it will cause us to increase the generator rating, generator room size, and
bulk tank size.

3- Spare capacity is based on Shell DEP requirements, spare capacity Noted and to be consisdered as per Electrical Engineering Design Shell DEP no.
will be calculated after getting an idea of the future expansion loads. 33.64.10.10.

The consultant should refer to the specifications / standards for


2 response to such queries; as most of them are specification Noted and Considered.
related.The same should then be incorporated in the design basis.

Well noted. Please check Attachment 1 for Laboratory Specialist's


Contractor shall ensure to include Lab specialist input /
recommendation. He requested to include all Laboratory equipment and HVAC
recommendations is attached along with such technical queries.
loads to the Generator

Doc. No.: 4154-0-TQ-0004 Page 1 of 1