DOCUMENT NUMBER, REV & TITLE: 4154-0-TQ-0004, REV. 1, TECHNICAL QUERY #4 - GENERATOR LOAD LAST REVISION STATUS: 0
1- Noted and Considered. Coordination has taken place between EGEC team
and found that the future expansion load estimate to be 400kW, kindly refer to
2- The electrical design in this project shall include the future
Key single line diagram drawing. no. 4154-25-16-32-001.
expansion loads. EGEC electrical engineer will coordinate with other
2- The future extension loads will not be
disciplines in EGEC project team (architecture engineer, Civil
considered on the sizing of the generator, as the estimated loads for the future
engineer, HVAC engineer ...etc) to estimate the future expansion
expansion shall be 400 kW, and if we consider those loads on the generator
load and submit for QP review.
sizing, it will cause us to increase the generator rating, generator room size, and
bulk tank size.
3- Spare capacity is based on Shell DEP requirements, spare capacity Noted and to be consisdered as per Electrical Engineering Design Shell DEP no.
will be calculated after getting an idea of the future expansion loads. 33.64.10.10.