You are on page 1of 1

COMMENTS RESOLUTION SHEET (CRS)

CONTRACT NUMBER LC19103100

CONTRACT TITLE: ECS FOR NEW LABORATORY BUILDING AT QP REFINERY, MESAIEED

QP EXTERNAL TRANSMITTAL REFERENCE, DATED: PID/LC19103100/EXT/TN/

DOCUMENT NUMBER, REV & TITLE: 4154-25-61-03-0005, REV. 2, PROJECT FIRE & SAFETY PHILOSOPHY LAST REVISION STATUS:

PREVIOUS ISSUED DRAWING NUMBER MADE VOID (IF ANY) N/A


SR. QP COMMENTS CONTRACTOR'S RESPONSE REMARKS
NO
QP Engineer Section Comments
Ref id.
1.0 Some previous review comments are outstanding; Following key
1 items shall be discussed in Project philosophy
document; HSE Plan, HSE risk register.
2.0 Section 6.4.25 Update to state that -HAZID study shall comply
with QP-GDL-S-040”.

3.0 Safety design review : Response is not acceptable. Safety design


review session shall be conducted during detailed design stage as
required by Appendix A Sow. Include the requirement for Safety
review in Philosophy
document.

4.0 No response from Contractor for Hazardous area classification


comment; The lab location is unclassified.
However, Specific to the project there are classified zones, eg battery
room , HC storage etc. Note: Requirement fro HAC shall be discussed
in philosophy document.
This item was explained during the meeting with contractor and
sample HAC schedule and lay out were provided.
Comply EI 15 for guidance.

5.0 Refer to 6.4.6, separate safety sign lay out and spec documents
shall be developed.

6.0 Refer to 6.4.9, revise to state that - Passive Fire protection


requirement shall be subject to FERA study results”.

7.0 6.4.11, identify locations for safety showers


8.0 6.4.11, identify locations for Eyes wash
9.0 6.4.13 Specify Type and size of Extinguishers required.
10.0 Refer to 7.4, HVAC air intake shall have Toxic, Flammable,
Benzene and Chlorine gas detectors. Confirmed detection shall close Noted and incorporated, kindly refer to the updated document (section No. 7.4).
HVAC gas damper and shoudwon HVAC.

11.0 Road ways and width shall comply with Section 6.8.27 of
Corporate Fire and safety philosophy QP-PHLS-
001 R3

12.0 Refer to 12.2 Zone classification. More clarity required. Please


describe zoen requirement applicable to project scope. Liquid
hydrocarbon storage also envisaged.
13.0 Refer to 13.0, please discuss how and where laboratory
drainage collected removed for further treatment.
14.0 Refer to 7.1 F&G system shall interfaced with QPR and Noted and incorporated, kindly refer to the updated document (clause No.
Mesaieed Fire stations and MIC ERCC. 7.1.a).
15.0 Refer to 7.1, & 7.2.7, laboratory guard house shall be provided Noted and incorporated, kindly refer to the updated document (clause No.
with Fire and Toxic visual and audible alarm 7.2.7.e).
16.0 Refer to 7.1 , instruments intended to operate during an
Noted and incorporated, kindly refer to the updated document (clause No.
emergency shall be Zone 1 certified as required by QPPHL-
7.1.z).
S-001 r3.

17.0 Refer to 7.2.2, Heat detector shall also be required in battery Noted and incorporated, kindly refer to the updated document (clause No.
room 7.2.2.e).

18.0 Refer to 6.6 & 6.7 the information provided shall be part of Fire
water system selection report. Delete from here. Discuss FW system
philospphy adopted here and make a reference to -Fire water system
selection report”.

19.0 Water mist, sprinkler and NOVEc system description, graphics ,


function details etc shall be part of -Fire water system selection
report”. Delete from this document.

Section 6.4.28:
2 Please add MME Permit application
Report on Waste (During Demolition, Construction and Operation)

Kindly see our comments on the -4154-25-61-03-005_Rev.1 (Project


3 IHF/3M Fire alarm portion has been updated
Fire & Safety Philosophy)” as attached.