You are on page 1of 1

S. M.

NIRMAN
Infrastructure & Development Pvt. Ltd.
CIN: 045400WB2008PTC131098
PURCHASE ORDER
P.O. No. -SMNIDPLUPOI23-24/USSHARIAB/O008
3rd April, 2024

To,
AMBAY BOARDS
"Vivek Vihar" 493/CIA, G.T Road(S)
Howrah- 711102, West Bengal
Kind Attn. : Mr. Nitin Agarwal (9830163407) &Mr. Anup Didwania (9674740270)

Dear Sir,
Please provide the LVL Door Frames for "USSHAR" project at Batanagar, Maheshtala, Kolkata
against following details below, on or before 13th Apr, 2024
Rate (Rs.) Amount
SL Description of
Size
Section Rebit size Rate per Qty.(in including
No. materials (mm) (mm) CFT(Rs.)| Pcs) loading & (Rs.)
freight
1 LVL Door Frames 0.740 X2.140 101.6 X 63.5 32 X 12 2000.00 102 2287.00 233274.00
2 LVL Door Frames 0.905 X 2.140 101.6 X 63.5 32 X 12 2000.00 85 2363.00 200855.00
3 LVL Door Frames 1.040 X 2.140 101.6 X 63.5 35 X 12 2000.00 35 2424.00 84840.00
TOTAL 222 518969.00

Terms & Conditions :

1. Billing Address:- S.M. Nirman Infrastructure &Development Pvt. Ltd.


20/3, S.N. Roy Road, Kolkata-700 038.
GST No.: 19AAMCS5931 M1ZM
2. Delivery Address :'USSHAR' at Batanagar, Maheshtala, Kolkata.
3.Contact Person: Mr. Asit Mukherjee (700356841 8) &Mr. Prasenjit Mondal (9073684618)
4. Loading &Transportation are in your scope up toour site.
5. GST will pay extra as applicable.
6. Payment Terms: After 15 (Fifteen) Days of materials deliver at site.
7.Delivery Schedule: The total Wooden Dor Frames should be deliver within 10th of February, 24.
Thanking You,

Regards,
Ostructure &Development Pvt Ltd.
For, S.M.Aman
KOLKATM

(Authorized signatory.)

20/3.S. N. Roy Road, Kolkata 700 038 - (033) 2488 - 3042/3043- smnirmnan®gmail.com

You might also like