Pre-Installation Work for Equipment

Item Unit
Description Unit QTY Total Price
No Price
1.0 Architectural

Supply and installation of structural support below the equipment. Include


1.1 L.S 1.0 0
Engineering, Structural Design and Consultation for MRI and PET CT if required

1.5 Perform radiation leakage test from authorized third party for PET CT area L.S 1.0 0

Perform radiation leakage test from authorized third party for other medical
1.6 L.S 1.0 0
equimpment rooms

2.0 Electrical

Supply & install of panel boards 3 PH, 5 W, 400 V, 60 Hz.,wall mounted fully
wired. the panels should contain of main breaker, branch circuit breakers of
required rating including distribution bars, internal wires installation,
distribution boxes, earth terminal and measuring devices of the current and
voltage as per existing on the site

Distribution Panel Board, 100A Main CB For XRAY as per SIEMENS specifications
2.1 The panel will include a separate breaker located next to it for maintenance L.S 1 0
control ncluding all necessary accessories to finish the work for all equipment

Distribution Panel Board, 160A Main CB For PET CT as per SIEMENS


specifications The panel will include a separate breaker located next to it for
2.2 maintenance controlncluding all necessary accessories to finish the work for all L.S 1 0
equipment

Distribution Panel Board, 40A Main CB For Mamo as per SIEMENS specifications
2.3 The panel will include a separate breaker located next to it for maintenance L.S 1 0
controlncluding all necessary accessories to finish the work for all equipment

Distribution Panel Board, 160A Main CB For CT as per SIEMENS specifications


2.4 The panel will include a separate breaker located next to it for maintenance L.S 1 0
control ncluding all necessary accessories to finish the work for all equipment

Install of panel boards 3 PH, 5 W, 400 V, 60 Hz.,wall mounted fully wired. the
panels should contain of main breaker, branch circuit breakers of required
rating including distribution bars, internal wires installation, distribution boxes,
earth terminal and measuring devices of the current and voltage as per existing
on the site

Distribution Panel Board, 250A Main CB For MRI as per SIEMENS


specifications.The panel will include a separate breaker located next to it for
2.4 maintenance control ncluding all necessary accessories to finish the work for all No. 1 0
equipment

Supplying, Installing, connecting and testing of the sub-feeders copper cables


multicore XLPE/PVC insulated including terminations, cable ladder, cable trays,
all necessary accessories and ancillary works and materials required for
complete installation as specified and as indicated on the drawings for the
following sizes:

Supply & install of flexible power cable (5x35mm2) from main distribution board
2.5 to equipment UPS for MRI Scan Room Lm 20 0

Rev. 0 MAR. 2020 Page 1 of 2 Bill of Quantities


Pre-Installation Work for Equipment
Item Unit
Description Unit QTY Total Price
No Price
1.0 Architectural

Supply and installation of structural support below the equipment. Include


1.1 L.S 1.0 0
Engineering, Structural Design and Consultation for MRI and PET CT if required

Supply & install of flexible power cable (5x50mm2) from main distribution board
2.6 Lm 10 0
to equipment generator for MRI Room

Supply and Installation of (emergency ON/OFF) with remote switch in the


2.7 control and exam room including wiring cable, pull box, EMT Conduit, and all No. 9 0
necessary item to complete the work

Supply and install hot dip galvanized steel cable tray for MRI room including
2.8 fittings, elbows, connectors, C-channel and all necessary accessories to finish Lm 7 0
the work

Supply and install hot dip galvanized steel cable Ladder for MRI equibment room
2.9 including fittings, elbows, connectors, C-channel and all necessary accessories Lm 10 0
to finish the work

Supply and installation transformar 4kva bender IPP including all necessary
2.1 L.S 1.0 0
accessories to finish the work for all equipment

3.0 Mechanical

Supply and installation of the non-magnetic quench pipe from the magnet room
to the outside of the building inclining fittings & end-terminals using
3.1 LM 15.0 0
recommended dimensions provided in calculation charts. including all necessary
accessories to finish the work for all equipment and final cover.
Supply and installation of chilled water line (supply and return copper pipes with
3.2 Lm 38.0 0
complete fittings and insulation as required).

Supply and installation of chilled water line 12L (supply and return copper pipes
3.3 with complete fittings and insulation as required) including all necessary Lm 15.0 0
accessories to finish the work for all equipment

Total Price Pre-Installation Work 0