2E-3401 2P-3403A/B 2E-3404
WDU FEED/EFFLUENT WATER DISTILLER WATER DISTILLER
EXCHANGER BOTTOM PUMP BOTTOMS COOLER 1. FOR GENERAL NOTES AND SYMBOLS SEE DWG NOS T-13.370.001,
CAPACITY : 166.2 dm^3/s T-13.370.002 AND T-13.370.003.
SHELL DP : 50.0 barg / -1.0 barg DP : 27.0 barg / 80-2S340913-11261-H1
DHP : 365 kW DT : 150 C / 4 C 2. FOR DEWAXING 2E-3401 TUBESIDE AND SHELLSIDE BY USING LP STEAM.
SHELL DT : 160 C / 4 C
TRIM: 2P340950-33012-N TRIM: 2P340956-33012-N
TUBE DP : 34.0 barg / -1.0 barg 2
TUBE DT : 160 C / 4 C NOTE 21 3. 2E-3404 CONSISTS OF 4 BAYS WITH 3 FANS/BAY DETAILS OF
TO BAY D
TRIM: SHELL 2P340959-63012-H2 AIR COOLER HEADER ARRANGEMENT,
REFER TO PEFS T-4.002.618.
2
80-2S340912-11261-H1 4. DELETED.
D
234 5. DELETED.
2
TI-10
E TO BAY C 6. LINE TO BE DESIGNED FOR TWO PHASE FLOW. E
001
2 7. DELETED.
80-2S340911-11261-H1
D 8. DELETED.
2
9. FOR EACH INDIVIDUAL FAN MOTOR RUNNING, STOP, START ETC
TO BAY B INDICATORS, REFER TO DETAILS ON PEFS T-4.002.550.
300-2P340006-33012-G
NOTE 17
2 10. FOR EACH INDIVIDUAL PUMP MOTOR RUNNING, START, STOP ETC
H INDICATORS, REFER TO DETAILS ON PEFS T-4.002.550.
D
11. DELETED.
2 2 80-2S340011-11261-H1
LPS 12. STEAM COIL FOR DEWAXING.
2E-3404 2 T-4.002.810 13. DELETED
NOTE 3
D 14. DELETED.
13012QV
A
NOTE 16 234-SP-061-STP
33012
R NOTE 12 80-2S340012-11011QV-G 15. DELETED.
234 STA NCC
TG-10 NOTE 25 NOTE 6 16. FOR EACH INDIVIDUAL TEMPERATURE INDICATORS,
VENDORPIPING T-4.002.854 REFER TO DETAIL ON PEFS T-4.002.618.
2 2
17. MANUALLY CONTROLLED LOUVRES TO BE PROVIDED
11011QV-G
NOTE 9
LNL 11261-H1
150x100 234FCA- 150x100 FOR DEWAXING OPERATION.
10008 2 M 80-2S340013-11261-H1
18. DELETED.
PUMP MINIMUM FLOW
D
D D
80-2S340905-11261-H1
19. PUMP AUTO START ON/OFF HS.
FROM BAY B
20. DELETED
300-2P340007-
80-2S340906-11261-H1
33012-N
FROM BAY C 21. PUMP CASING DRAIN VALVE SUPPLIED BY PUMP VENDOR.
80-2S340907-11261-H1 FOR CONTINUATION 22. DELETED.
13012QV
FROM BAY D
234-SC-1001 SEE DWG T-4.002.
63012
300-2P340801- HS-10 26. FOR DETAILS OF SAMPLING RETURN LINE, REFER TO T-4.002.567.
150-2P340063-33012-H2
NORMAL
NOTE 23
NOTE 24
2 50 003 27. FLOW ESTIMATOR IS AVAILABLE FOR BAD SLAVE BYPASS.
2 D 004
MIN FROM 234LCSA-10002
D 546
LNL13012QV 40x25 2 28. INTERLOCK SIGNAL.
D NOTE 2 D
2 63012 LO 300x150 NNF 29. P-3403 STANDBY AUTO-START IS BASED ON UN-COMMANDED STOP
E2
150-2P340008-33012-N
H2
63012-H2 UC
SIGNAL OF RUNNING PUMP AND HIGH LEVEL IN C-3401.
LNL
13012-S2 40x25
40-2P340013- 50 2 MIN LNL 0-100% Y
FREE DRAIN
40-100% ONCE-THROUGH 30. PERMANENT SPADE INSTALLED AS PER e-MOC 120018. SPADE REMOVAL,
ST
0-40%
NOTE 2 63012-E2 NOTE 23 AND LINING UP OF COLD HPS-WATER TO 2T-1201 REQUIRES EVV TO BE
UC 234 NOTE 19 234 300x200 LINED-UP ON 2T-1201.
C 50 2 50 TI-10 234 FC-10 EM
C
234 2 D Y
2 HS-10 001 D
PG-10 015
300-2P340005-
H2
G
050
0-100%
001 D NOTE 27 200x150
33012-H2
RSP 2 PV
50-2P340963-
350x200 350x300
13012-S2
2
2
25-2P340966-33012-N
V 33012-H2 2
200-2P340010-33012-G
80 234 234
13012-S2 2 EM
FREE DRAIN
234FC-10001
SW
ST
COC
234 150 2
2 FROM
T-4.002.551 DP FCA-10
2 SW D 234LCSA-10002
VIA 2T-3401 546
80 COC 008
234FC-
AUTO START/STOP
10002
D 350x200 350x300 2 NC L
LNL
T-4.002.551 2
13012QV VIA 2T-3401 MIN V
2 2
NC 63012 50 300-2P340802- 234-SP-001-BST
NOTE 26 20 250x150
2 33012-G
2 50 LNL
300x150
D
MIN
LNL 20 H2 13012QV-N
200-2P340009-63012-H2 2 2 COLD HPS WATER
63012-H2 13012-S2
D 2 33012-G 13012QV D
N FROM TRAIN 2 ONLY
13012-S2 2 400-2P340004- 2C-3401
13012-S2 2 33012 D 2 546
20-2P340925- 13012QV-H2
B B
D D D 2 2E-3401
2 13012QV-N V 2
D 2 13012QV 2E-3404
50-2P340909- 2 33012 20 2 2P-3403A /B
FREE DRAIN
FREE DRAIN
2 234-SP-002-BST
200-2P300090-63012-H2
50
LNL H2
50-2P340911- 13012-S2
N
UC 50 UC D NC
234 234 2 B
N LNL N LNL
LNLH2
13012-S2
N
25 PP-10 25 PP-10 NC
ST
ST
H2 H2 2
234 V 053 V 054
234 D 20 H2 LNL
2 2 20-2P340926-
PG-10 300x250 PG-10 300x250 N D INSLRW QRSKU4 INPPAP
27JUL23 AS BUILT e-MOC 120018
SW SW 005 13012QV-N D
400x250 006 400x250 06MAY20 QRSPID
2 C QRABE0 RUDPR4 AS BUILT MOC-PC-GTL-P-3400-2067
FREE DRAIN
COC COC
ST
M M
234 234 2 234 B 29MAR20 QRSPI9 QRABE0 RUDPR4 AS BUILT eMoc-68066
T-4.002.551 T-4.002.551 13012QV-N
GSA-10 GSA-10 PP-10
VIA 2T-3401 VIA 2T-3401 234 13012-S2 A 28FEB11 TK TK JS AS-BUILT
FREE DRAIN
031 NOTE 10 032 NOTE 10 008
PP-10 O 15DEC08 TK TK TA RELEASED FOR CONSTRUCTION
50-2P300009-
2P-3403A 20
2P-3403B D 2 007 2
63012-N 2 2 ISSUE DATE MADE CHECK'D APPR'D DESCRIPTION
D 20 UC
UC
ST
50
2
LNL H2
50
Pearl GTL Project - Qatar
N
2 2
2 NOTE 30 D
D SW SW JGC Middle East FZE - Kellogg Brown & Root International Inc.
D D 2 COC COC D D This document is confidential. Neither the whole nor any part of this document may be used,
MIN
A
2 2 D reproduced, copied, stored in any retrieval system or transmitted in any form or by any means
NNF
MIN
50 without the prior written consent of Qatar Shell GTL Ltd. All rights reserved.
2 33012-N LNL VIA 2T-3401 V1A 2T-3401
2 50 33012-N LNL 2 2
13012-S2 PROCESS ENGINEERING FLOW SCHEME
13012-S2 UC UC
A 50
50 WATER DISTILLATION UNIT (WDU) A
PUMP STOP NOTE 28
WDU FEED AND PRODUCT SECTION
FREE DRAIN
FREE DRAIN
ST