Status of Structures - Section 1

Development of road from Bannerghatta on SH-87 to Beshtamanahalli on SH-35 (Including Anekal Bypass,Grade Separator across Chandrapura road and ROB across Railway line) via Jigani,Haragadde and Indalwadi (Km 0+000
to Km 22+980) in Bengaluru-Package-3B
Page No. 74
Status of Structures

SI. CA Location Proposed Proposal As Per Contract Agreement Contractor submission PMC Observations
No. (Km) (Km)
Type Span Proposal Type Span Proposal Type Span Ccomments

1 02+040 Box/Slab Culvert 1 X 6.0 X 2.5 m Widening


2 03+140 Box/Slab Culvert 1 X 1.2 X 1.1 m Widening
3 03+160 Box Culvert 1 X 1.2 X 1.1 New Construction Box Culvert 1 X 1.2 X 1.1 New Construction
4 05+020 Box Culvert 1 X 6.0 X 2.8 Widening Box Culvert 1 X 6.0 X 2.8 Widening
5 05+934 Box Culvert 1 X 1.5 X 1.5 New Construction Box Culvert 1 X 1.5 X 1.5 New Construction
6 09+340 Box Culvert 1 X 2 X 1.1 Reconstruction Box Culvert 1 X 2 X 1.1 Reconstruction
7 10+634 Box Culvert 1 X 2.5 X 1.5 Reconstruction Box Culvert 1 X 2.5 X 1.5 Reconstruction
8 10+884 10+865 Box Culvert 1 X 1.5 X 1.5 m New Construction Box Culvert 1 X 1.5 X 1.5 Reconstruction Box Culvert 1 X 1.5 X 1.5 Reconstruction
9 11+020 11+200 Box Culvert 1 X 1.5 X 1.5 m Reconstruction Box Culvert 2 X 2.5 X 1.15 Reconstruction Box Culvert 2 X 2.5 X 1.15 Reconstruction
10 11+340 11+582 Box Culvert 1 X 1.5 X 1.5 m Reconstruction Pipe Culvert 1 X 1.20 Reconstruction Pipe Culvert 1 X 1.20 Reconstruction
11 11+883 Box Culvert 1 X 2 X 1.5 m Reconstruction Box Culvert 1 X 2 X 1.7 Reconstruction Box Culvert 1 X 2 X 1.7 Reconstruction
12 12+773 12+706 Box Culvert 1 X 1.5 X 1.5 m Reconstruction Box Culvert 1 X 1.5 X 1.5 Reconstruction Box Culvert 1 X 1.5 X 1.5 Reconstruction
13 12+883 12+865 Box Culvert 1 X 1.5 X 1.5 m Reconstruction Box Culvert 1 X 1.5 X 1.5 Reconstruction Box Culvert 1 X 1.5 X 1.5 Reconstruction
14 13+634 Box Culvert 1 X 1.5 X 1.5 m Reconstruction Box Culvert 1 X 1.5 X 1.5 Reconstruction Box Culvert 1 X 1.5 X 1.5 Reconstruction
15 19+280 Pipe Culvert 1 X 1.20 m New Construction
16 20+660 Grade Seperator 2 X 25 X 5.5 New Construction
17 21+220 Box Culvert 1 X 1.5 X 1.5 m New Construction
Road Over Bridge 1 X 25.2 X+1 X 37.2 +
18 21+360 New Construction
(ROB) 1 X 25.2 m

19 21+690 Pipe Culvert 1 X 1.20 m New Construction

20 21+790 Minor Bridge 2X6m New Construction

21