Activity No. 1
Activity No. 1
Name: Rasonabe, Mary Ann Toni N. Date Submitted: October 19, 2023
Year and Section: BSCE – 4B CE 13
Activity No. 1:
1. Estimate the number of trips for each zone-to-zone using the gravity model and then present the
Singly Constrained and Doubly Constrained.
2. Continue the sample problem from Growth Factor model by estimating the trips between zones in 2 nd
Iteration using the newly acquired values.
Estimated
Zone A B C D Actual Trip Growth
Zone Total Trip
Generation Factor
A 0 428 141 124 Generated
B 428 0 372 0 A 693 720 1.04
C 141 372 0 430 B 800 770 0.96
D 124 0 430 0 C 943 980 1.04
Total 693 800 943 554 D 554 520 0.94
Hint: Growth factor must be equal to 1 and Estimated Total Trip Generation must be equal to the
Actual Trip Generation
Solution:
1. Step 1: Calculate the initial values of trip distribution of each zones using the formula.
T ij =P i
( A j Fij K ij
Σ A j F ij K ij )
From Zone 1
T 1−1 =400
[ 300∗1∗1
( 300∗1∗1 ) + ( 300∗0.5∗1 )+ ( 300∗2∗1 )
=114
]
T 1−2=400
[ 300∗0.5∗1
( 300∗1∗1 ) + ( 300∗0.5∗1 )+ ( 300∗2∗1 )
=57
]
T 1−3 =400
[ 300∗2∗1
( 300∗1∗1 ) + ( 300∗0.5∗1 ) + ( 300∗2∗1 )
=229
]
From Zone 2
T 2−1=400
[ 300∗1∗1
( 300∗1∗1 ) + ( 300∗0.5∗1 )+ ( 300∗2∗1 )
=114
]
T 2−2=400
[ 300∗0.5∗1
( 300∗1∗1 ) + ( 300∗0.5∗1 )+ ( 300∗2∗1 )
=57
]
T 2−3=400
[ 300∗2∗1
( 300∗1∗1 ) + ( 300∗0.5∗1 ) + ( 300∗2∗1 )
=229
]
From Zone 3
T 3−1=100
[ 300∗1∗1
(300∗1∗1 )+ ( 300∗0.5∗1 ) + ( 300∗2∗1 )
=29
]
T 3−2=100
[ 300∗0.5∗1
(300∗1∗1 )+ ( 300∗0.5∗1 ) + ( 300∗2∗1 )
=14
]
T 3−3=100
[ 300∗2∗1
( 300∗1∗1 ) + ( 300∗0.5∗1 ) + ( 300∗2∗1 )
=57
]
Step 2: Tabulate the zone-to-zone trips
Since computed P is equal only to the given P, then the iteration is Singly Constrained.
Step 3: Determine the multiplier (M) to correct/ adjust the Computed A in each zone to make it
equal to Given A.
T ij =(t i Gi )
( t ij Gi
Σ x t ix Gix )
From Zone A
T AA=0
T AB=693∗1.04
[ 428∗0.96
( 428∗0.96 )+ (141∗1.04 )+(124∗0.94 )
=439
]
T AC =693∗1.04
[ 141∗1.04
( 428∗0.96 ) + ( 141∗1.04 ) +(124∗0.94)
=157
]
T AD=693∗1.04
[ 124∗0.94
( 428∗0.96 )+ ( 141∗1.04 )+(124∗0.94 )
=125
]
From Zone B
T BA =800∗0.96
[ 428∗1.04
( 428∗1.04 ) + ( 372∗1.04 )
=411
]
T BB=0
T BC =800∗0.96
[ 372∗1.04
( 428∗1.04 ) + ( 372∗1.04 )
=357
]
T BD=0
From Zone C
T CA =943∗1.04
[ 141∗1.04
( 141∗1.04 ) + ( 372∗0.96 ) +(430∗0.94)
=158
]
T CB=943∗1.04
[ 372∗0.96
(141∗1.04 )+ ( 372∗0.96 )+(430∗0.94 )
=386
]
T CC=0
T CD =943∗1.04
[ 430∗0.94
( 141∗1.04 )+ ( 372∗0.96 )+(430∗0.94)
=437
]
From Zone D
T DA =554∗0.94
[ 124∗1.04
( 124∗1.04 ) + ( 430∗1.04 )
=117
]
T DB =0
T DC =554∗0.94
[ 430∗1.04
]
( 124∗1.04 ) + ( 430∗1.04 )
=404
T DD =0
Step 2: Calculate the average values of trip distribution of each pair zones such as T AB and TBA.
From pairs AB
T AB +T BA 439+ 411
T AB= = =425
2 2
From pairs AC
T AC +T CA 157+158
T AC = = =158
2 2
From pairs AD
T AD +T DA 125+ 117
T AD= = =121
2 2
From pairs BC
T BC + T CB 357+ 386
T BC = = =372
2 2
From pairs CD
T CD +T DC 437+404
T CD = = =421
2 2
Estimated
Actual Trip
Zone A B C D Total Trip
Generation
Generated
A 0 425 158 121 704 720
B 425 0 372 0 797 770
C 158 372 0 421 951 980
D 121 0 421 0 542 520
Total 704 797 951 542
720
GA= =1.02
704
770
GB = =0.97
797
980
GC= =1.03
951
520
G D= =0.96
542
SECOND ESTIMATE:
Step 1: Calculate the initial values of trips of each zones using the formula.
T ij =(t i Gi )
( t ij Gi
Σ x t ix Gix )
From Zone A
T AA=0
T AB=704∗1.02
[ 425∗0.97
( 425∗0.97 ) + ( 158∗1.03 ) +(121∗0.96)
=428
]
T AC =704∗1.02
[ 158∗1.03
( 425∗0.97 ) + ( 158∗1.03 ) +(121∗0.96)
=169
]
T AD=704∗1.02
[ 121∗0.96
( 425∗0.97 )+ ( 158∗1.03 ) +(121∗0.96)
=121
]
From Zone B
T BA =797∗0.97
[ 425∗1.02
( 425∗1.02 )+ ( 372∗1.03 )
=410
]
T BB=0
T BC =797∗0.97
[ 372∗1.03
( 425∗1.02 ) + ( 372∗1.03 )
=363
]
T BD=0
From Zone C
T CA =951∗1.03
[ 158∗1.02
( 158∗1.02 ) + ( 372∗0.97 ) +(421∗0.96)
=170
]
T CB=951∗1.03
[ 372∗0.97
( 158∗1.02 )+ ( 372∗0.97 )+(421∗0.96)
=382
]
T CC=0
T CD =951∗1.03
[ 421∗0.96
( 158∗1.02 ) + ( 372∗0.97 ) +(421∗0.96)
=427
]
From Zone D
T DA =542∗0.96
[ 121∗1.02
]
( 121∗1.02 ) + ( 421∗1.03 )
=115
T DB =0
T DC =542∗0.96
[ 421∗1.03
]
( 121∗1.02 ) + ( 421∗1.03 )
=405
T DD =0
Step 2: Calculate the average values of trip distribution of each pair zones such as T AB and TBA.
From pairs AB
T AB +T BA 428+ 410
T AB= = =419
2 2
From pairs AC
T AC +T CA 169+170
T AC = = =170
2 2
From pairs AD
T AD +T DA 121+115
T AD= = =118
2 2
From pairs BC
T BC + T CB 363+ 382
T BC = = =373
2 2
From pairs CD
T CD +T DC 427+405
T CD = = =416
2 2
Estimated
Actual Trip
Zone A B C D Total Trip
Generation
Generated
A 0 419 170 118 707 720
B 419 0 373 0 792 770
C 170 373 0 416 959 980
D 118 0 416 0 534 520
Total 707 792 959 534
THIRD ESTIMATE:
Step 1: Calculate the initial values of trips of each zones using the formula.
T ij =(t i Gi )
( t ij Gi
Σ x t ix Gix )
From Zone A
T AA=0
T AB=707∗1.02
[ 419∗0.97
( 419∗0.97 ) + ( 170∗1.02 )+(118∗0.97)
=422
]
T AC =707∗1.02
[ 170∗1.02
( 419∗0.97 ) + ( 170∗1.02 )+(118∗0.97)
=180
]
T AD=707∗1.02
[ 118∗0.97
( 419∗0.97 ) + ( 170∗1.02 ) +(118∗0.97)
=119
]
From Zone B
T BA =792∗0.97
[ 419∗1.02
( 419∗1.02 ) + ( 373∗1.02 )
=406
]
T BB=0
T BC =792∗0.97
[ 37 3∗1.02
( 419∗1.02 ) + ( 373∗1.02 )
=36 2
]
T BD=0
From Zone C
T CA =959∗1.02
[ 170∗1.02
( 170∗1.02 ) + ( 373∗0.97 ) +(416∗0.97)
=181
]
T CB=959∗1.02
[ 373∗0.97
( 170∗1.02 )+ ( 373∗0.97 ) +(416∗0.97)
=377
]
T CC=0
T CD =959∗1.02
[ 416∗0.97
( 170∗1.02 ) + ( 373∗0.97 ) +(416∗0.97)
=420
]
From Zone D
T DA =534∗0.97
[ 118∗1.02
]
( 118∗1.02 ) + ( 416∗1.02 )
=114
T DB =0
T DC =534∗0.97
[ 416∗1.02
]
( 118∗1.02 )+ ( 416∗1.02 )
=404
T DD =0
Step 2: Calculate the average values of trip distribution of each pair zones such as T AB and TBA.
From pairs AB
T AB +T BA 422+ 406
T AB= = =414
2 2
From pairs AC
T AC +T CA 180+181
T AC = = =181
2 2
From pairs AD
T AD +T DA 119 +114
T AD= = =117
2 2
From pairs BC
T BC + T CB 36 2+377
T BC = = =37 0
2 2
From pairs CD
T CD +T DC 420+404
T CD = = =412
2 2
Estimated
Actual Trip
Zone A B C D Total Trip
Generation
Generated
A 0 414 181 117 712 720
B 414 0 370 0 784 770
C 181 370 0 412 963 980
D 117 0 412 0 529 520
Total 712 784 963 529
720
GA= =1.01
712
770
GB = =0.98
785
980
GC= =1.02
96 3
520
G D= =0.98
5 29
FOURTH ESTIMATE:
Step 1: Calculate the initial values of trips of each zones using the formula.
T ij =(t i Gi )
( t ij Gi
Σ x t ix Gix )
From Zone A
T AA=0
T AB=712∗1.01
[ 414∗0.98
( 414∗0.98 ) + ( 181∗1.02 ) +(117∗0.98)
=414
]
T AC =712∗1.01
[ 181∗1.02
( 414∗0.98 )+ ( 181∗1.02 ) +(117∗0.98)
=188
]
T AD=712∗1.01
[ 117∗0.98
( 414∗0.98 ) + ( 181∗1.02 )+(117∗0.98)
=117
]
From Zone B
T BA =78 4∗0.98
[ 414∗1.01
( 414∗1.01 ) + ( 371∗1.02 )
=404
]
T BB=0
T BC =78 4∗0.98
[ 37 0∗1.02
( 414∗1.01 ) + ( 371∗1.02 )
=36 4
]
T BD=0
From Zone C
T CA =96 3∗1.02
[ 181∗1.01
( 181∗1.01 )+ ( 37 0∗0.98 ) +(412∗0.98)
=189
]
T CB=96 3∗1.02
[ 37 0∗0.98
( 181∗1.01 ) + ( 37 0∗0.98 )+(412∗0.98)
=37 5
]
T CC=0
T CD =96 3∗1.02
[ 412∗0.98
( 181∗1.01 )+ (37 0∗0.98 ) +(412∗0.98)
=418
]
From Zone D
T DA =5 29∗0.98
[ 117∗1.01
]
( 117∗1.01 )+ ( 412∗1.02 )
=114
T DB =0
T DC =529∗0.98
[ 412∗1.02
]
( 117∗1.01 ) + ( 412∗1.02 )
=405
T DD =0
Step 2: Calculate the average values of trip distribution of each pair zones such as T AB and TBA.
From pairs AB
T AB +T BA 414 +404
T AB= = =409
2 2
From pairs AC
T AC +T CA 188+189
T AC = = =189
2 2
From pairs AD
T AD +T DA 117 +114
T AD= = =116
2 2
From pairs BC
T BC + T CB 36 4+37 5
T BC = = =37 0
2 2
From pairs CD
T CD +T DC 418+405
T CD = = =412
2 2
Estimated
Actual Trip
Zone A B C D Total Trip
Generation
Generated
A 0 409 189 116 714 720
B 409 0 370 0 779 770
C 189 370 0 412 971 980
D 116 0 412 0 528 520
Total 714 779 971 528
Step 4: Determine the growth factor for the fifth estimate.
720
GA= =1.01
714
770
GB = =0.99
7 79
980
GC= =1.01
97 1
520
G D= =0.98
528
FIFTH ESTIMATE:
Step 1: Calculate the initial values of trips of each zones using the formula.
T ij =(t i Gi )
( t ij Gi
Σ x t ix Gix )
From Zone A
T AA=0
T AB=714∗1.01
[ 409∗0.99
( 409∗0.99 ) + ( 189∗1.01 )+(116∗0.98)
=412
]
T AC =714∗1.01
[ 189∗1.01
( 409∗0.99 ) + ( 189∗1.01 )+(116∗0.98)
=194
]
T AD=714∗1.01
[ 116∗0.98
( 409∗0.99 ) + ( 189∗1.01 ) +(116∗0.98)
=116
]
From Zone B
T BA =7 79∗0.99
[ 409∗1.01
( 409∗1.01 ) + ( 37 0∗1.01 )
=405
]
T BB=0
T BC =7 79∗0.99
[ 37 0∗1.01
( 409∗1.01 ) + ( 371∗1.01 )
=36 6
]
T BD=0
From Zone C
T CA =97 1∗1.01
[ 189∗1.01
( 189∗1.01 )+ ( 37 0∗0.99 ) +(412∗0.98)
=195
]
T CB=97 1∗1.01
[ 371∗0.99
( 189∗1.01 ) + ( 37 0∗0.99 )+(412∗0.98)
=375
]
T CC=0
T CD =97 1∗1.01
[ 412∗0.98
( 189∗1.01 )+ (37 0∗0.99 )+(412∗0.98)
=412
]
From Zone D
T DA =528∗0.98
[ 116∗1.01
(116∗1.01 )+ ( 412∗1.01 )]=114
T DB =0
T DC =528∗0.98
[ 412∗1.01
]
( 116∗1.01 ) + ( 412∗1.01 )
=404
T DD =0
Step 2: Calculate the average values of trip distribution of each pair zones such as T AB and TBA.
From pairs AB
T AB +T BA 412+ 405
T AB= = =409
2 2
From pairs AC
T AC +T CA 194+195
T AC = = =195
2 2
From pairs AD
T AD +T DA 116 +114
T AD= = =115
2 2
From pairs BC
T BC + T CB 36 6 +375
T BC = = =371
2 2
From pairs CD
T CD +T DC 412+ 404
T CD = = =408
2 2
Estimated
Actual Trip
Zone A B C D Total Trip
Generation
Generated
A 0 409 195 115 719 720
B 409 0 371 0 780 770
C 195 371 0 408 974 980
D 115 0 408 0 523 520
Total 719 780 974 523
720
GA= =1.00
719
770
GB = =0.99
780
980
GC= =1.01
974
520
G D= =0.99
523
SIXTH ESTIMATE:
Step 1: Calculate the initial values of trips of each zones using the formula.
T ij =(t i Gi )
( t ij Gi
Σ x t ix Gix )
From Zone A
T AA=0
T AB=719∗1.00
[ 409∗0.99
( 409∗0.99 ) + ( 195∗1.01 )+(115∗0.99)
=407
]
T AC =719∗1.00
[ 195∗1.01
( 409∗0.99 )+ ( 195∗1.01 ) +(115∗0.99)
=198
]
T AD=719∗1.00
[ 115∗0.99
( 409∗0.99 ) + ( 195∗1.01 )+(115∗0.99)
=114
]
From Zone B
T BA =780∗0.99
[ 409∗1.00
( 409∗1.00 )+ (371∗1.01 )
=403
]
T BB=0
T BC =780∗0.99
[ 371∗1.01
]
( 409∗1.00 ) + ( 371∗1.01 )
=369
T BD=0
From Zone C
T CA =974∗1.01
[ 195∗1.00
( 195∗1.00 )+ (371∗0.99 ) +(408∗0.99)
=199
]
T CB=974∗1.01
[ 371∗0.99
( 195∗1.00 ) + ( 371∗0.99 ) +(408∗0.99)
=374
]
T CC=0
T CD =974∗1.01
[ 408∗0.99
(195∗1.00 ) + ( 371∗0.99 ) +(408∗0.99)
=411
]
From Zone D
T DA =523∗0.99
[ 115∗1.00
]
( 115∗1.00 )+ ( 408∗1.01 )
=113
T DB =0
T DC =523∗0.99
[ 408∗1.01
]
( 115∗1.00 ) + ( 408∗1.01 )
=405
T DD =0
Step 2: Calculate the average values of trip distribution of each pair zones such as T AB and TBA.
From pairs AB
T AB +T BA 407 +403
T AB= = =405
2 2
From pairs AC
T AC +T CA 198+199
T AC = = =199
2 2
From pairs AD
T AD +T DA 114 +113
T AD= = =114
2 2
From pairs BC
T BC + T CB 369+374
T BC = = =372
2 2
From pairs CD
T CD +T DC 411+405
T CD = = =408
2 2
720
GA= =1.00
718
770
GB = =0.99
777
980
GC= =1.00
979
520
G D= =1.00
522
SEVENTH ESTIMATE:
Step 1: Calculate the initial values of trips of each zones using the formula.
T ij =(t i Gi )
( t ij Gi
Σ x t ix Gix )
From Zone A
T AA=0
T AB=718∗1.00
[ 405∗0.99
( 405∗0.99 ) + ( 199∗1.00 ) +(114∗1.00)
=403
]
T AC =718∗1.00
[ 199∗1.00
( 405∗0.99 )+ ( 199∗1.00 )+(114∗1.00)
=200
]
T AD=718∗1.00
[ 114∗1.00
( 405∗0.99 ) + ( 199∗1.00 ) +(114∗1.00)
=115
]
From Zone B
T BA =777∗0.99
[ 405∗1.00
]
( 405∗1.00 )+ ( 372∗1.00 )
=401
T BB=0
T BC =777∗0.99
[ 372∗1.00
]
( 405∗1.00 ) + ( 372∗1.00 )
=368
T BD=0
From Zone C
T CA =979∗1.00
[ 199∗1.00
( 199∗1.00 ) + ( 372∗0.99 ) +(408∗1.00)
=200
]
T CB=979∗1.00
[ 372∗0.99
( 199∗1.00 ) + ( 372∗0.99 ) +(408∗1.00)
=370
]
T CC=0
T CD =979∗1.00
[ 408∗1.00
( 199∗1.00 ) + ( 372∗0.99 ) +(408∗1.00)
=410
]
From Zone D
T DA =522∗1.00
[ 114∗1.00
]
( 114∗1.00 )+ ( 408∗1.00 )
=114
T DB =0
T DC =522∗1.00
[ 408∗1.00
]
( 114∗1.00 ) + ( 408∗1.00 )
=408
T DD =0
Step 2: Calculate the average values of trip distribution of each pair zones such as T AB and TBA.
From pairs AB
T AB +T BA 403+ 401
T AB= = =402
2 2
From pairs AC
T AC +T CA 200+200
T AC = = =200
2 2
From pairs AD
T AD +T DA 115 +114
T AD= = =115
2 2
From pairs BC
T BC + T CB 368+ 370
T BC = = =369
2 2
From pairs CD
T CD +T DC 410+408
T CD = = =409
2 2
Estimated
Actual Trip
Zone A B C D Total Trip
Generation
Generated
A 0 402 200 115 717 720
B 402 0 369 0 771 770
C 200 369 0 409 978 980
D 115 0 409 0 524 520
Total 717 771 978 524
720
GA= =1.00
717
770
GB = =1.00
771
980
GC= =1.00
978
520
G D= =0.99
524
EIGHTH ESTIMATE:
Step 1: Calculate the initial values of trips of each zones using the formula.
T ij =(t i Gi )
( t ij Gi
Σ x t ix Gix )
From Zone A
T AA=0
T AB=717∗1.00
[ 402∗1.00
( 402∗1.00 )+ ( 200∗1.00 )+(115∗0.99)
=403
]
T AC =717∗1.00
[ 200∗1.00
( 402∗1.00 )+ ( 200∗1.00 )+(115∗0.99)
=200
]
T AD=717∗1.00
[ 115∗0.99
( 402∗1.00 ) + ( 200∗1.00 ) +(115∗0.99)
=114
]
From Zone B
T BA =771∗1.00
[ 402∗1.00
]
( 402∗1.00 ) + ( 369∗1.00 )
=402
T BB=0
T BC =771∗1.00
[ 369∗1.00
]
( 402∗1.00 )+ ( 369∗1.00 )
=369
T BD=0
From Zone C
T CA =978∗1.00
[ 200∗1.00
(200∗1.00 )+ ( 369∗1.00 ) +(409∗0.99)
=201
]
T CB=978∗1.00
[ 369∗1.00
( 200∗1.00 ) + ( 369∗1.00 ) +(409∗0.99)
=371
]
T CC=0
T CD =978∗1.00
[ 409∗0.99
( 200∗1.00 ) + ( 369∗1.00 ) +(409∗0.99)
=407
]
From Zone D
T DA =524∗0.99
[ 115∗1.00
]
( 115∗1.00 ) + ( 409∗1.00 )
=114
T DB =0
T DC =524∗0.99
[ 409∗1.00
]
( 115∗1.00 )+ ( 409∗1.00 )
=405
T DD =0
Step 2: Calculate the average values of trip distribution of each pair zones such as T AB and TBA.
From pairs AB
T AB +T BA 403+ 402
T AB= = =403
2 2
From pairs AC
T AC +T CA 200+201
T AC = = =201
2 2
From pairs AD
T AD +T DA 114 +114
T AD= = =114
2 2
From pairs BC
T BC + T CB 369+371
T BC = = =370
2 2
From pairs CD
T CD +T DC 407+405
T CD = = =406
2 2
Estimated
Actual Trip
Zone A B C D Total Trip
Generation
Generated
A 0 403 201 114 718 720
B 403 0 370 0 773 770
C 201 370 0 406 977 980
D 114 0 406 0 520 520
Total 718 773 977 520
720
GA= =1.00
718
770
GB = =1.00
773
980
GC= =1.00
977
520
G D= =1.00
520
NINTH ESTIMATE:
Step 1: Calculate the initial values of trips of each zones using the formula.
T ij =(t i Gi )
( t ij Gi
Σ x t ix Gix )
From Zone A
T AA=0
T AB=718∗1.00
[ 403∗1.00
( 403∗1.00 ) + ( 201∗1.00 )+(114∗1.00)
=403
]
T AC =718∗1.00
[ 201∗1.00
( 403∗1.00 )+ ( 201∗1.00 ) +(114∗1.00)
=201
]
T AD=718∗1.00
[ 114∗1.00
( 403∗1.00 ) + ( 201∗1.00 )+(114∗1.00)
=114
]
From Zone B
T BA =773∗1.00
[ 403∗1.00
]
( 403∗1.00 )+ ( 370∗1.00 )
=403
T BB=0
T BC =773∗1.00
[ 370∗1.00
]
( 403∗1.00 ) + ( 370∗1.00 )
=370
T BD=0
From Zone C
T CA =977∗1.00
[ 201∗1.00
( 201∗1.00 ) + ( 370∗1.00 ) +(406∗1.00)
=201
]
T CB=977∗1.00
[ 370∗1.00
( 201∗1.00 ) + ( 370∗1.00 ) +(406∗1.00)
=370
]
T CC=0
T CD =977∗1.00
[ 406∗1.00
(201∗1.00 ) + ( 370∗1.00 ) +(406∗1.00)
=406
]
From Zone D
T DA =520∗1.00
[ 114∗1.00
]
( 114∗1.00 ) + ( 406∗1.00 )
=114
T DB =0
T DC =520∗1.00
[ 406∗1.00
]
( 114∗1.00 )+ ( 406∗1.00 )
=40 6
T DD =0
Step 2: Calculate the average values of trip distribution of each pair zones such as T AB and TBA.
From pairs AB
T AB +T BA 403+ 403
T AB= = =403
2 2
From pairs AC
T AC +T CA 201+201
T AC = = =201
2 2
From pairs AD
T AD +T DA 114 +114
T AD= = =114
2 2
From pairs BC
T BC + T CB 370+ 370
T BC = = =370
2 2
From pairs CD
T CD +T DC 406+406
T CD = = =406
2 2
Estimated
Actual Trip
Zone A B C D Total trip
Generation
Generated
A 0 403 201 114 718 720
B 403 0 370 0 773 770
C 201 370 0 406 977 980
D 114 0 406 0 520 520
Total 718 773 977 520
720
GA= =1.00
718
770
GB = =1.00
773
980
GC= =1.00
977
520
G D= =1.00
520
Step 5: The estimated total trip generated and actual trip generation are almost the same as the
given values and growth factor in each zone is equal to 1. Therefore, try to adjust manually.
Estimated
Actual Trip
Zone A B C D Total Trip
Generation
Generated
A 0 400 205 115 720 720
B 400 0 370 0 770 770
C 205 370 0 405 980 980
D 115 0 405 0 520 520
Total 720 770 980 520
720
GA= =1.00
720
770
GB = =1.00
720
980
GC= =1.00
980
520
G D= =1.00
520