You are on page 1of 13

MG Contractors Pvt. Ltd.

Construction of Important Bridge No.211 Span 7x76.2m Open Web Girder on Kuno River Between Sabalgarh - Sheopurkalan Section in connection with Gwalior - Sheopurkalan(GC)

Bar Bending Schedule RCC Retaining Wall Section 1


Drawing Adopted RICPL/NCR/ISC/RCC-R_W/01 Sheet 1 of 4 Wall Height Above Raft 2490 to 3000 mm
COVER 50 mm Bottom Width 3500 mm
Wall Bottom Width 500 mm Thickness of Raft 500 mm
Wall Top Width 400 mm Length of Wall 11500 mm

Sr. No. Bar Mark Location of Bar Shape of Bar Dia of Bar Spacing Nos. Total Length Cutting Length Unit Weight Total Weight Remarks
(mm) (KG)

Bottom Main Bar


1 5a/10 Raft 300 300 12 150 77 304.304 3.952 0.888 270.22
3400

3400

2 6/9a Top Main Bar Raft 300 300 16 150 77 303.072 3.936 1.580 478.85

Raft Binder Top &


3 7/11 Bottom 11400 10 200 34 387.600 11.400 0.617 239.15

100 Along Wall Along Wall 200


390 200 mm & mm & Across
4 8/12 C Shaped Raft Link 10
Across Wall 570 336.300 0.590 0.617 207.50
300 mm Wall 300 mm
100

300

Vertical Earth 2868 to 3378


5 1b Face
16 150 77 281.743 3.659 1.580 445.15

300

300

Vertical Front
6 2b Face
12 150 77 282.975 3.675 0.888 251.28
2868 to 3378
300

7 3 Wall Binder 11400 10 200 28 319.200 11.400 0.617 196.95

Along Wall 300


100 100 mm & And
8 4C Wall Links 10 200 532 287.280 0.540 0.617 177.25 vertically Wall
390 to 290 200 mm

1000
9 Chair Chair 16 - 20 43.920 2.196 1.580 69.39
362 362

300 300

Total In Kgs. 2335.75

Contractor's Representative Railway's Representative


MG Contractors Pvt. Ltd.
Construction of Important Bridge No.211 Span 7x76.2m Open Web Girder on Kuno River Between Sabalgarh - Sheopurkalan Section in connection with Gwalior - Sheopurkalan(GC)

Bar Bending Schedule RCC Retaining Wall Section 2


Drawing Adopted RICPL/NCR/ISC/RCC-R_W/01 Sheet 1 of 4 Wall Height Above Raft 2470 to 3000 mm
COVER 50 mm Bottom Width 3500 mm
Wall Bottom Width 500 mm Thickness of Raft 500 mm
Wall Top Width 400 mm Length of Wall 12000 mm

Sr. No. Bar Mark Location of Bar Shape of Bar Dia of Bar Spacing Nos. Total Length Cutting Length Unit Weight Total Weight Remarks
(mm) (KG)

Bottom Main Bar


1 5a/10 Raft 300 300 12 150 80 316.160 3.952 0.888 280.75
3400

3400

2 6/9a Top Main Bar Raft 300 300 16 150 80 314.880 3.936 1.580 497.51

Raft Binder Top &


3 7/11 Bottom 11900 10 200 34 404.600 11.900 0.617 249.64

100 Along Wall Along Wall 200


390 200 mm & mm & Across
4 8/12 C Shaped Raft Link 10
Across Wall 600 354.000 0.590 0.617 218.42
300 mm Wall 300 mm
100

300

Vertical Earth 2848 to 3378


5 1b Face
16 150 80 291.920 3.649 1.580 461.23

300

300

Vertical Front
6 2b Face
12 150 80 293.200 3.665 0.888 260.36
2848 to 3378
300

7 3 Wall Binder 11900 10 200 28 333.200 11.900 0.617 205.58

Along Wall 300


100 100 mm & And
8 4C Wall Links 10 200 560 302.400 0.540 0.617 186.58 vertically Wall
390 to 290 200 mm

1000
9 Chair Chair 16 - 20 43.920 2.196 1.580 69.39
362 362

300 300

Total In Kgs. 2429.47

Contractor's Representative Railway's Representative


MG Contractors Pvt. Ltd.
Construction of Important Bridge No.211 Span 7x76.2m Open Web Girder on Kuno River Between Sabalgarh - Sheopurkalan Section in connection with Gwalior - Sheopurkalan(GC)

Bar Bending Schedule RCC Retaining Wall Section 3


Drawing Adopted RICPL/NCR/ISC/RCC-R_W/01 Sheet 1 of 4 Wall Height Above Raft 2470 to 3000 mm
COVER 50 mm Bottom Width 3500 mm
Wall Bottom Width 500 mm Thickness of Raft 500 mm
Wall Top Width 400 mm Length of Wall 12000 mm

Sr. No. Bar Mark Location of Bar Shape of Bar Dia of Bar Spacing Nos. Total Length Cutting Length Unit Weight Total Weight Remarks
(mm) (KG)

Bottom Main Bar


1 5a/10 Raft 300 300 12 150 80 316.160 3.952 0.888 280.75
3400

3400

2 6/9a Top Main Bar Raft 300 300 16 150 80 314.880 3.936 1.580 497.51

Raft Binder Top &


3 7/11 Bottom 11900 10 200 34 404.600 11.900 0.617 249.64

100 Along Wall Along Wall 200


390 200 mm & mm & Across
4 8/12 C Shaped Raft Link 10
Across Wall 600 354.000 0.590 0.617 218.42
300 mm Wall 300 mm
100

300

Vertical Earth 2848 to 3378


5 1b Face
16 150 80 291.920 3.649 1.580 461.23

300

300

Vertical Front
6 2b Face
12 150 80 293.200 3.665 0.888 260.36
2848 to 3378
300

7 3 Wall Binder 11900 10 200 28 333.200 11.900 0.617 205.58

Along Wall Along Wall 300


100 100 300 mm & mm & And
8 4C Wall Links 10 And 560 302.400 0.540 0.617 186.58 vertically Wall
390 290
vertically 200 mm
to
Wall 200 mm

1000
9 Chair Chair 16 - 20 43.920 2.196 1.580 69.39
362 362

300 300

Total In Kgs. 2429.47

Contractor's Representative Railway's Representative


MG Contractors Pvt. Ltd.
Construction of Important Bridge No.211 Span 7x76.2m Open Web Girder on Kuno River Between Sabalgarh - Sheopurkalan Section in connection with Gwalior - Sheopurkalan(GC)

Bar Bending Schedule RCC Retaining Wall Section 4


Drawing Adopted RICPL/NCR/ISC/RCC-R_W/01 Sheet 2 of 4 Wall Height Above Raft 3920 to 4450 mm
COVER 50 mm Bottom Width 4000 mm
Wall Bottom Width 550 mm Thickness of Raft 550 mm
Wall Top Width 400 mm Length of Wall 12000 mm

Sr. No. Bar Mark Location of Bar Shape of Bar Dia of Bar Spacing Nos. Total Length Cutting Length Unit Weight Total Weight Remarks
(mm) (KG)

Bottom Main Bar


1 5a/10 Raft 400 400 12 100 120 558.240 4.652 0.888 495.72
3900

3900

2 6/9a Top Main Bar Raft 400 16 100 120 556.320 4.636 1.580 878.99
400

Raft Binder Top &


3 7/11 Bottom 11900 10 200 40 476.000 11.900 0.617 293.69

100 Along Wall Along Wall 200


440 200 mm & mm & Across
4 8/12 C Shaped Raft Link 10
Across Wall 1080 691.200 0.640 0.617 426.47
200 mm Wall 300 mm
100

300

Vertical Earth 4348 to 4878


5 1b Face
16 100 120 617.880 5.149 1.580 976.25

300

300

Vertical Front
6 2b Face
12 100 120 619.800 5.165 0.888 550.38
4348 to 4878
300

7 3 Wall Binder 11900 10 200 42 499.800 11.900 0.617 308.38

Along Wall Along Wall 200


100 100 200 mm & mm & And
8 4C Wall Links 10 And 1260 711.900 0.565 0.617 439.24 vertically Wall
440 290
vertically 200 mm
to
Wall 200 mm

1000
9 Chair Chair 16 - 20 45.920 2.296 1.580 72.55
412 412

300 300

Total In Kgs. 4441.67

Contractor's Representative Railway's Representative


MG Contractors Pvt. Ltd.
Construction of Important Bridge No.211 Span 7x76.2m Open Web Girder on Kuno River Between Sabalgarh - Sheopurkalan Section in connection with Gwalior - Sheopurkalan(GC)

Bar Bending Schedule RCC Retaining Wall Section 5


Drawing Adopted RICPL/NCR/ISC/RCC-R_W/01 Sheet 2 of 4 Wall Height Above Raft 3920 to 4450 mm
COVER 50 mm Bottom Width 4000 mm
Wall Bottom Width 550 mm Thickness of Raft 550 mm
Wall Top Width 400 mm Length of Wall 12000 mm

Sr. No. Bar Mark Location of Bar Shape of Bar Dia of Bar Spacing Nos. Total Length Cutting Length Unit Weight Total Weight Remarks
(mm) (KG)

Bottom Main Bar


1 5a/10 Raft 400 400 12 100 120 558.240 4.652 0.888 495.72
3900

3900

2 6/9a Top Main Bar Raft 400 16 100 120 556.320 4.636 1.580 878.99
400

Raft Binder Top &


3 7/11 Bottom 11900 10 200 40 476.000 11.900 0.617 293.69

100 Along Wall Along Wall 200


440 200 mm & mm & Across
4 8/12 C Shaped Raft Link 10
Across Wall 1080 691.200 0.640 0.617 426.47
200 mm Wall 300 mm
100

300

Vertical Earth 4348 to 4878


5 1b Face
16 100 120 617.880 5.149 1.580 976.25

300

300

Vertical Front
6 2b Face
12 100 120 619.800 5.165 0.888 550.38
4348 to 4878
300

7 3 Wall Binder 11900 10 200 42 499.800 11.900 0.617 308.38

Along Wall Along Wall 200


100 100 200 mm & mm & And
8 4C Wall Links 10 And 1260 711.900 0.565 0.617 439.24 vertically Wall
440 290
vertically 200 mm
to
Wall 200 mm

1000
9 Chair Chair 16 - 20 45.920 2.296 1.580 72.55
412 412

300 300

Total In Kgs. 4441.67

Contractor's Representative Railway's Representative


MG Contractors Pvt. Ltd.
Construction of Important Bridge No.211 Span 7x76.2m Open Web Girder on Kuno River Between Sabalgarh - Sheopurkalan Section in connection with Gwalior - Sheopurkalan(GC)

Bar Bending Schedule RCC Retaining Wall Section 6


Drawing Adopted RICPL/NCR/ISC/RCC-R_W/01 Sheet 2 of 4 Wall Height Above Raft 3920 to 4450 mm
COVER 50 mm Bottom Width 4000 mm
Wall Bottom Width 550 mm Thickness of Raft 550 mm
Wall Top Width 400 mm Length of Wall 12000 mm

Sr. No. Bar Mark Location of Bar Shape of Bar Dia of Bar Spacing Nos. Total Length Cutting Length Unit Weight Total Weight Remarks
(mm) (KG)

Bottom Main Bar


1 5a/10 Raft 400 400 12 100 120 558.240 4.652 0.888 495.72
3900

3900

2 6/9a Top Main Bar Raft 400 16 100 120 556.320 4.636 1.580 878.99
400

Raft Binder Top &


3 7/11 Bottom 11900 10 200 40 476.000 11.900 0.617 293.69

100 Along Wall Along Wall 200


440 200 mm & mm & Across
4 8/12 C Shaped Raft Link 10
Across Wall 1080 691.200 0.640 0.617 426.47
200 mm Wall 300 mm
100

300

Vertical Earth 4348 to 4878


5 1b Face
16 100 120 617.880 5.149 1.580 976.25

300

300

Vertical Front
6 2b Face
12 100 120 619.800 5.165 0.888 550.38
4348 to 4878
300

7 3 Wall Binder 11900 10 200 42 499.800 11.900 0.617 308.38

Along Wall Along Wall 200


100 100 200 mm & mm & And
8 4C Wall Links 10 And 1260 711.900 0.565 0.617 439.24 vertically Wall
440 290
vertically 200 mm
to
Wall 200 mm

1000
9 Chair Chair 16 - 20 45.920 2.296 1.580 72.55
412 412

300 300

Total In Kgs. 4441.67

Contractor's Representative Railway's Representative


MG Contractors Pvt. Ltd.
Construction of Important Bridge No.211 Span 7x76.2m Open Web Girder on Kuno River Between Sabalgarh - Sheopurkalan Section in connection with Gwalior - Sheopurkalan(GC)

Bar Bending Schedule RCC Retaining Wall Section 7


Drawing Adopted RICPL/NCR/ISC/RCC-R_W/01 Sheet 2 of 4 Wall Height Above Raft 3920 to 4450 mm
COVER 50 mm Bottom Width 4000 mm
Wall Bottom Width 550 mm Thickness of Raft 550 mm
Wall Top Width 400 mm Length of Wall 12000 mm

Sr. No. Bar Mark Location of Bar Shape of Bar Dia of Bar Spacing Nos. Total Length Cutting Length Unit Weight Total Weight Remarks
(mm) (KG)

Bottom Main Bar


1 5a/10 Raft 400 400 12 100 120 558.240 4.652 0.888 495.72
3900

3900

2 6/9a Top Main Bar Raft 400 16 100 120 556.320 4.636 1.580 878.99
400

Raft Binder Top &


3 7/11 Bottom 11900 10 200 40 476.000 11.900 0.617 293.69

100 Along Wall Along Wall 200


440 200 mm & mm & Across
4 8/12 C Shaped Raft Link 10
Across Wall 1080 691.200 0.640 0.617 426.47
200 mm Wall 300 mm
100

300

Vertical Earth 4348 to 4878


5 1b Face
16 100 120 617.880 5.149 1.580 976.25

300

300

Vertical Front
6 2b Face
12 100 120 619.800 5.165 0.888 550.38
4348 to 4878
300

7 3 Wall Binder 11900 10 200 42 499.800 11.900 0.617 308.38

Along Wall Along Wall 200


100 100 200 mm & mm & And
8 4C Wall Links 10 And 1260 711.900 0.565 0.617 439.24 vertically Wall
440 290
vertically 200 mm
to
Wall 200 mm

1000
9 Chair Chair 16 - 20 45.920 2.296 1.580 72.55
412 412

300 300

Total In Kgs. 4441.67

Contractor's Representative Railway's Representative


MG Contractors Pvt. Ltd.
Construction of Important Bridge No.211 Span 7x76.2m Open Web Girder on Kuno River Between Sabalgarh - Sheopurkalan Section in connection with Gwalior - Sheopurkalan(GC)

Bar Bending Schedule RCC Retaining Wall Section 8


Drawing Adopted RICPL/NCR/ISC/RCC-R_W/01 Sheet 2 of 4 Wall Height Above Raft 3920 to 4450 mm
COVER 50 mm Bottom Width 4000 mm
Wall Bottom Width 550 mm Thickness of Raft 550 mm
Wall Top Width 400 mm Length of Wall 12000 mm

Sr. No. Bar Mark Location of Bar Shape of Bar Dia of Bar Spacing Nos. Total Length Cutting Length Unit Weight Total Weight Remarks
(mm) (KG)

Bottom Main Bar


1 5a/10 Raft 400 400 12 100 120 558.240 4.652 0.888 495.72
3900

3900

2 6/9a Top Main Bar Raft 400 16 100 120 556.320 4.636 1.580 878.99
400

Raft Binder Top &


3 7/11 Bottom 11900 10 200 40 476.000 11.900 0.617 293.69

100 Along Wall Along Wall 200


440 200 mm & mm & Across
4 8/12 C Shaped Raft Link 10
Across Wall 1080 691.200 0.640 0.617 426.47
200 mm Wall 300 mm
100

300

Vertical Earth 4348 to 4878


5 1b Face
16 100 120 617.880 5.149 1.580 976.25

300

300

Vertical Front
6 2b Face
12 100 120 619.800 5.165 0.888 550.38
4348 to 4878
300

7 3 Wall Binder 11900 10 200 42 499.800 11.900 0.617 308.38

Along Wall Along Wall 200


100 100 200 mm & mm & And
8 4C Wall Links 10 And 1260 711.900 0.565 0.617 439.24 vertically Wall
440 290
vertically 200 mm
to
Wall 200 mm

1000
9 Chair Chair 16 - 20 45.920 2.296 1.580 72.55
412 412

300 300

Total In Kgs. 4441.67

Contractor's Representative Railway's Representative


MG Contractors Pvt. Ltd.
Construction of Important Bridge No.211 Span 7x76.2m Open Web Girder on Kuno River Between Sabalgarh - Sheopurkalan Section in connection with Gwalior - Sheopurkalan(GC)

Bar Bending Schedule RCC Retaining Wall Section 9


Drawing Adopted RICPL/NCR/ISC/RCC-R_W/01 Sheet 1 of 4 Wall Height Above Raft 2470 to 3000 mm
COVER 50 mm Bottom Width 3500 mm
Wall Bottom Width 500 mm Thickness of Raft 500 mm
Wall Top Width 400 mm Length of Wall 12000 mm

Sr. No. Bar Mark Location of Bar Shape of Bar Dia of Bar Spacing Nos. Total Length Cutting Length Unit Weight Total Weight Remarks
(mm) (KG)

Bottom Main Bar


1 5a/10 Raft 300 300 12 150 80 316.160 3.952 0.888 280.75
3400

3400

2 6/9a Top Main Bar Raft 300 300 16 150 80 314.880 3.936 1.580 497.51

Raft Binder Top &


3 7/11 Bottom 11900 10 200 34 404.600 11.900 0.617 249.64

100 Along Wall Along Wall 200


390 200 mm & mm & Across
4 8/12 C Shaped Raft Link 10
Across Wall 600 354.000 0.590 0.617 218.42
300 mm Wall 300 mm
100

300

Vertical Earth 2848 to 3378


5 1b Face
16 150 80 291.920 3.649 1.580 461.23

300

300

Vertical Front
6 2b Face
12 150 80 293.200 3.665 0.888 260.36
2848 to 3378
300

7 3 Wall Binder 11900 10 200 28 333.200 11.900 0.617 205.58

Along Wall 300


100 100 mm & And
8 4C Wall Links 10 200 560 302.400 0.540 0.617 186.58 vertically Wall
390 to 290 200 mm

1000
9 Chair Chair 16 - 20 43.920 2.196 1.580 69.39
362 362

300 300

Total In Kgs. 2429.47

Contractor's Representative Railway's Representative


MG Contractors Pvt. Ltd.
Construction of Important Bridge No.211 Span 7x76.2m Open Web Girder on Kuno River Between Sabalgarh - Sheopurkalan Section in connection with Gwalior - Sheopurkalan(GC)

Bar Bending Schedule RCC Retaining Wall Section 10


Drawing Adopted RICPL/NCR/ISC/RCC-R_W/01 Sheet 1 of 4 Wall Height Above Raft 2470 to 3000 mm
COVER 50 mm Bottom Width 3500 mm
Wall Bottom Width 500 mm Thickness of Raft 500 mm
Wall Top Width 400 mm Length of Wall 12000 mm

Sr. No. Bar Mark Location of Bar Shape of Bar Dia of Bar Spacing Nos. Total Length Cutting Length Unit Weight Total Weight Remarks
(mm) (KG)

Bottom Main Bar


1 5a/10 Raft 300 300 12 150 80 316.160 3.952 0.888 280.75
3400

3400

2 6/9a Top Main Bar Raft 300 300 16 150 80 314.880 3.936 1.580 497.51

Raft Binder Top &


3 7/11 Bottom 11900 10 200 34 404.600 11.900 0.617 249.64

100 Along Wall Along Wall 200


390 200 mm & mm & Across
4 8/12 C Shaped Raft Link 10
Across Wall 600 354.000 0.590 0.617 218.42
300 mm Wall 300 mm
100

300

Vertical Earth 2848 to 3378


5 1b Face
16 150 80 291.920 3.649 1.580 461.23

300

300

Vertical Front
6 2b Face
12 150 80 293.200 3.665 0.888 260.36
2848 to 3378
300

7 3 Wall Binder 11900 10 200 28 333.200 11.900 0.617 205.58

Along Wall 300


100 100 mm & And
8 4C Wall Links 10 200 560 302.400 0.540 0.617 186.58 vertically Wall
390 to 290 200 mm

1000
9 Chair Chair 16 - 20 43.920 2.196 1.580 69.39
362 362

300 300

Total In Kgs. 2429.47

Contractor's Representative Railway's Representative


MG Contractors Pvt. Ltd.
Construction of Important Bridge No.211 Span 7x76.2m Open Web Girder on Kuno River Between Sabalgarh - Sheopurkalan Section in connection with Gwalior - Sheopurkalan(GC)

Bar Bending Schedule RCC Retaining Wall Section 11


Drawing Adopted RICPL/NCR/ISC/RCC-R_W/01 Sheet 1 of 4 Wall Height Above Raft 2470 to 3000 mm
COVER 50 mm Bottom Width 3500 mm
Wall Bottom Width 500 mm Thickness of Raft 500 mm
Wall Top Width 400 mm Length of Wall 12000 mm

Sr. No. Bar Mark Location of Bar Shape of Bar Dia of Bar Spacing Nos. Total Length Cutting Length Unit Weight Total Weight Remarks
(mm) (KG)

Bottom Main Bar


1 5a/10 Raft 300 300 12 150 80 316.160 3.952 0.888 280.75
3400

3400

2 6/9a Top Main Bar Raft 300 300 16 150 80 314.880 3.936 1.580 497.51

Raft Binder Top &


3 7/11 Bottom 11900 10 200 34 404.600 11.900 0.617 249.64

100 Along Wall Along Wall 200


390 200 mm & mm & Across
4 8/12 C Shaped Raft Link 10
Across Wall 600 354.000 0.590 0.617 218.42
300 mm Wall 300 mm
100

300

Vertical Earth 2848 to 3378


5 1b Face
16 150 80 291.920 3.649 1.580 461.23

300

300

Vertical Front
6 2b Face
12 150 80 293.200 3.665 0.888 260.36
2848 to 3378
300

7 3 Wall Binder 11900 10 200 28 333.200 11.900 0.617 205.58

Along Wall 300


100 100 mm & And
8 4C Wall Links 10 200 560 302.400 0.540 0.617 186.58 vertically Wall
390 to 290 200 mm

1000
9 Chair Chair 16 - 20 43.920 2.196 1.580 69.39
362 362

300 300

Total In Kgs. 2429.47

Contractor's Representative Railway's Representative


MG Contractors Pvt. Ltd.
Construction of Important Bridge No.211 Span 7x76.2m Open Web Girder on Kuno River Between Sabalgarh - Sheopurkalan Section in connection with Gwalior - Sheopurkalan(GC)

Bar Bending Schedule RCC Retaining Wall Section 12


Drawing Adopted RICPL/NCR/ISC/RCC-R_W/01 Sheet 2 of 4 Wall Height Above Raft 3920 to 4450 mm
COVER 50 mm Bottom Width 4000 mm
Wall Bottom Width 550 mm Thickness of Raft 550 mm
Wall Top Width 400 mm Length of Wall 12000 mm

Sr. No. Bar Mark Location of Bar Shape of Bar Dia of Bar Spacing Nos. Total Length Cutting Length Unit Weight Total Weight Remarks
(mm) (KG)

Bottom Main Bar


1 5a/10 Raft 400 400 12 100 120 558.240 4.652 0.888 495.72
3900

3900

2 6/9a Top Main Bar Raft 400 16 100 120 556.320 4.636 1.580 878.99
400

Raft Binder Top &


3 7/11 Bottom 11900 10 200 40 476.000 11.900 0.617 293.69

100 Along Wall Along Wall 200


440 200 mm & mm & Across
4 8/12 C Shaped Raft Link 10
Across Wall 1080 691.200 0.640 0.617 426.47
200 mm Wall 300 mm
100

300

Vertical Earth 4348 to 4878


5 1b Face
16 100 120 617.880 5.149 1.580 976.25

300

300

Vertical Front
6 2b Face
12 100 120 619.800 5.165 0.888 550.38
4348 to 4878
300

7 3 Wall Binder 11900 10 200 42 499.800 11.900 0.617 308.38

Along Wall Along Wall 200


100 100 200 mm & mm & And
8 4C Wall Links 10 And 1260 711.900 0.565 0.617 439.24 vertically Wall
440 290
vertically 200 mm
to
Wall 200 mm

1000
9 Chair Chair 16 - 20 45.920 2.296 1.580 72.55
412 412

300 300

Total In Kgs. 4441.67

Contractor's Representative Railway's Representative


MG Contractors Pvt. Ltd.
Construction of Important Bridge No.211 Span 7x76.2m Open Web Girder on Kuno River Between Sabalgarh - Sheopurkalan Section in connection with Gwalior - Sheopurkalan(GC)

Bar Bending Schedule RCC Retaining Wall Section 13


Drawing Adopted RICPL/NCR/ISC/RCC-R_W/01 Sheet 2 of 4 Wall Height Above Raft 3720 to 4450 mm
COVER 50 mm Bottom Width 4000 mm
Wall Bottom Width 550 mm Thickness of Raft 550 mm
Wall Top Width 400 mm Length of Wall 17000 mm

Sr. No. Bar Mark Location of Bar Shape of Bar Dia of Bar Spacing Nos. Total Length Cutting Length Unit Weight Total Weight Remarks
(mm) (KG)

Bottom Main Bar


1 5a/10 Raft 400 400 12 100 170 790.840 4.652 0.888 702.27
3900

3900

2 6/9a Top Main Bar Raft 400 16 100 170 788.120 4.636 1.580 1245.23
400

Raft Binder Top &


3 7/11 Bottom 16900 10 200 40 676.000 16.900 0.617 417.09

100 Along Wall Along Wall 200


440 200 mm & mm & Across
4 8/12 C Shaped Raft Link 10
Across Wall 1530 979.200 0.640 0.617 604.17
200 mm Wall 300 mm
100

300

Vertical Earth 4148 to 4878


5 1b Face
16 100 170 858.330 5.049 1.580 1356.16

300

300

Vertical Front
6 2b Face
12 100 170 861.050 5.065 0.888 764.61
4148 to 4878
300

7 3 Wall Binder 16900 10 200 40 676.000 16.900 0.617 417.09

Along Wall Along Wall 200


100 100 200 mm & mm & And
8 4C Wall Links 10 And 1700 960.500 0.565 0.617 592.63 vertically Wall
440 290
vertically 200 mm
to
Wall 200 mm

1000
9 Chair Chair 16 - 20 45.920 2.296 1.580 72.55
412 412

300 300

Total In Kgs. 6171.80

Contractor's Representative Railway's Representative