CONTENTS
Introduction 5
The Project at a glance 7
Major components of the project 9
Summary of RDF COP activities (2018-2019) 15
3
KARAMA MODEL VILLAGE LAYOUT PLAN

Ü
B
KARAMA IDP MODEL VILLAGE LAYOUT PLAN

ECD

Roa
d to
ward C
s RU
LIBA
Clay
s
Wasac
Pumping
Station

Houses (2 Bedrooms) D

GS KARAMA
Houses (1 Bedroom)

Green Houses

Poultry Shade

Waste Water
Treatment Plant

Legend
Waste Water Treatment Plant
Playgrounds

Road towards NYAMIRAMBO


GS KARAMA (Old)
Houses (1Bedroom)
Houses (2Bedrooms)

SNo Distance from Road length


ECD
Green House
Poultry Shades

1 A-B 3100m Presentation Room


Road

2 B-C 145m GS KARAMA (New)

Scale; 1:1,300 3 C-D 710m


Wasac Pumping Station
School Fence

4
INTRODUCTION
In March 2018, a field survey conducted
by a multisectoral team made up of the
CoK, the RDF (RF), RHA and RFA indicated
that 13,670 households (HHs) were living
in informal settlements on slopes equal
to or greater than 30% in High Risk
Zones (HRZs) of CoK on the hilltops of
Jali, Rebero and Kigali Mountains.

HHs from Mt Kigali taking a big


proportion of 55.4% of all surveyed HHs

The intent was to find appropriate ways


to resettle the affected 13,670 HHs
as well as to restore the degraded
landscapes on the mentioned mountains
with reforestation

5
Initial Solution:

Phase I
4,442 households in critical conditions be
resettled at KARAMA site (39Ha)
But with a prohibitive cost of
130 billion Rwf

Phase II
The remaining households shall be resettled
in their neighborhoods by upgrading
existing informal settlements of Mpazi (for Mt
Kigali), Gatsata (for Mt Jali) and Gashyekero
(for Mt Rebero)

Relocation and resettlement approaches


have been subject to discussions in various
meetings between May and October 2018.
The ongoing Karama Project originates from
the outcomes of those meetings  Resettle
240 HHs at a cost of 8 Billion Rwf (for houses
construction, related Infrastructure and
social amenities)

6
THE PROJECT AT A GLANCE
DESCRIPTION

PRELIMINARIES
786,484,772 (Frw)

DESCRIPTION

CONSTRUCTION OF 240
APARTMENTS 3,979,843,860 (Frw)
6 blocks: 3 blocks of 120 apartments
of 1-bedroom size and 3 blocks of 120
apartments of 2-bedrooms size.

DESCRIPTION

WATER SUPPLY, WASTE WATER


MANAGEMENT AND FIRE HYDRABTS 433,779,371 (Frw)
Excavation of a trench to receive 160Dia pipe
from mount Kigali; Construction of a sewage
treatment plant

DESCRIPTION

CONSTRUCTION 24 CLASS ROOMS +


OTHER FACILITIES 2,347,476,596 (Frw)
Class rooms (24 rooms x 35 students=840
students); Administration block; Dining hall
and kitchen; ECD 7
DESCRIPTION

RAIN WATER HARVESTING, TREE


PLANTING, GREENING AND STORM 92,435,801 (Frw)
WATER DISPOSAL

DESCRIPTION

INTERNAL ROADS NETWORK 260,958,095 (Frw)

DESCRIPTION

POWER SUPPLY AND STREET LIGHTING 118,271,243 (Frw)

DESCRIPTION

POULTRY FARM AND KITCHEN GARDENS 194,838,533 (Frw)

TOTAL ESTIMATED COST 8,214,088,272 (Frw)

8
MAJOR COMPONENTS OF THE PROJECT
Construction of
120 Apartments
(1-bedroom apartment)

Housing model proposed for medium size HHs of not more than 5 people;
Floor area= 46 m2; G+3, eachIDP
floor has VILLAGE
10 housing unitsPLAN
and each block 40 units
Ü
B KARAMA MODEL LAYOUT

Each Housing
ECD Unit has one bedroom, a living room, kitchen area, a bathroom and toilet
Roa
ds to
ward
sR

Ü
ULIB KARAMA IDP MODEL VILLAGE LAYOUT PLAN
C
B
AC
lays ECD

Wasac Road
tow
ards
C
Pumping RULIB
A Cla
ys

Station Wasac
Pumping
Station

Houses (2 Bedrooms) D

Houses (2 Bedrooms) GS KARAMA GS KARAMA


Houses (1 Bedroom)

D
Green Houses

Poultry Shade

Houses (1 Bedroom)
Waste Water
Treatment Plant

Legend
Waste Water Treatment Plant
Playgrounds

Road towards NYAMIRAMBO


GS KARAMA (Old)
Houses (1Bedroom)

Green Houses
Houses (2Bedrooms)

SNo Distance from Road length


ECD
Green House
Poultry Shades

1 A-B 3100m Presentation Room


Road

2 B-C 145m GS KARAMA (New)

Scale; 1:1,300 3 C-D 710m


Wasac Pumping Station
School Fence

Poultry Shade

9
Legend
R
Construction of
120 Apartments
(2-bedroom apartment)

Housing model proposed for large size HHs of between 6 and 10 people;
Floor area=B 68 m2; G+3, each floor has 10VILLAGE
housing units PLAN
and each block 40 units
Ü
KARAMA IDP MODEL LAYOUT

Each Housing
ECD Unit has two bedrooms, a living room, kitchen area, a bathroom and toilet
Roa
ds to
ward
sR

Ü
ULIB KARAMA IDP MODEL VILLAGE LAYOUT PLAN
AC
lays C B

ECD

Wasac Road
C
Pumping
tow
ards
RULIB
A Cla

Station ys

Wasac
Pumping
Station

Houses (2 Bedrooms) D

Houses (2 Bedrooms) GS KARAMA GS KARAMA

D
Houses (1 Bedroom)

Green Houses

Poultry Shade

Houses (1 Bedroom)
Waste Water
Treatment Plant

Legend
Waste Water Treatment Plant
Playgrounds

Road towards NYAMIRAMBO


GS KARAMA (Old)
Houses (1Bedroom)

Green Houses Houses (2Bedrooms)

SNo Distance from Road length


ECD
Green House
Poultry Shades

1 A-B 3100m Presentation Room


Road

2 B-C 145m GS KARAMA (New)

Scale; 1:1,300 3 C-D 710m


Wasac Pumping Station
School Fence

Poultry Shade

Legend

10 Playgr ounds
Road towards

GS KARAMA (Old)
Houses (1Bedr oom)
Houses (2Bedr ooms)
NYAM

ECD
Extention of
GS KARAMA

24 Class rooms (840 students @35 students/class); labs, one smart classroom; a library, an
administration block, a dining hall, kitchen and recreations facilities.

Ü
B
KARAMA IDP MODEL VILLAGE LAYOUT PLAN

ECD

Road
tow
ards
C
RULIB
A Cla
ys

Wasac
Pumping
Station

Houses (2 Bedrooms) D

GS KARAMA
Houses (1 Bedroom)

Green Houses

Poultry Shade

Waste Water
Treatment Plant

Legend
Waste Water Treatment Plant
Playgrounds

Road towards NYAMIRAMBO


GS KARAMA (Old)
Houses (1Bedroom)
Houses (2Bedrooms)

SNo Distance from Road length


ECD
Green House
Poultry Shades

1 A-B 3100m Presentation Room


Road

2 B-C 145m GS KARAMA (New)

Scale; 1:1,300 3 C-D 710m


Wasac Pumping Station
School Fence

11
ECD CENTRE

2 Blocks with 6 Rooms (210 children @35 children/class);


playgrounds and related facilities

Ü
B
KARAMA IDP MODEL VILLAGE LAYOUT PLAN

ECD

Road
tow
ards
C
RULIB
A Cla
ys

Wasac
Pumping
Station

Houses (2 Bedrooms) D

GS KARAMA
Houses (1 Bedroom)

Green Houses

Poultry Shade

Waste Water
Treatment Plant

Legend
Waste Water Treatment Plant
Playgrounds

Road towards NYAMIRAMBO


GS KARAMA (Old)
Houses (1Bedroom)
Houses (2Bedrooms)

SNo Distance from Road length


ECD
Green House
Poultry Shades

1 A-B 3100m Presentation Room


Road

2 B-C 145m GS KARAMA (New)

Scale; 1:1,300 3 C-D 710m


Wasac Pumping Station
School Fence

12
GREEN HOUSES

Ü
B
KARAMA IDP MODEL VILLAGE LAYOUT PLAN

ECD

Road
tow
ards
C
RULIB
A Cla
ys

Wasac
Pumping
Station

Houses (2 Bedrooms) D

GS KARAMA
Houses (1 Bedroom)

Green Houses

Poultry Shade

Waste Water
Treatment Plant

These green houses will serve the community as


Legend
Waste Water Treatment Plant
Playgrounds

Road towards NYAMIRAMBO


GS KARAMA (Old)
Houses (1Bedroom)
Houses (2Bedrooms)

modern kitchen gardens. Each household shall SNo Distance from Road length
ECD
Green House
Poultry Shades

1 A-B 3100m Presentation Room


Road

2 B-C 145m GS KARAMA (New)

have its portion. Scale; 1:1,300 Wasac Pumping Station


3 C-D 710m School Fence

13
WASTE WATER TREATMENT PLANT &
RAIN WATER HARVESTING

Machine & Control room Septic Tank and Pump Well Rain Water Harvesting System

Ü
B
KARAMA IDP MODEL VILLAGE LAYOUT PLAN

ECD

Road
tow
ards
C
RULIB
A Cla
ys

Wasac
Pumping
Station

Houses (2 Bedrooms) D

GS KARAMA

WWTP consist of sewer lines from apartments,


Houses (1 Bedroom)

Green Houses

Septic tank for primary treatment and a Clarifier Poultry Shade

(Secondary treatment). Treated water can be


Waste Water
Treatment Plant

Legend
Waste Water Treatment Plant
Playgrounds

Road towards NYAMIRAMBO


GS KARAMA (Old)

used in green houses etc


Houses (1Bedroom)
Houses (2Bedrooms)

SNo Distance from Road length


ECD
Green House
Poultry Shades

1 A-B 3100m Presentation Room


Road

2 B-C 145m GS KARAMA (New)

Scale; 1:1,300 3 C-D 710m


Wasac Pumping Station
School Fence

Each building shall have 2 – 10m3 plastic tanks


receiving water form the gutters.

14
Summary of RDF COP activities (2018-2019)
ACTIVITY QUANTITY ACTUAL COST MARKET COST SAVINGS EXECUTION BENEFICIARIES
(Frw) (Frw) PERIOD
Medical 104,416 206,588,759 1,460,728,518 1,254,139,759 2018-2019 All districts
services Patients

Agricultural 139,75 Ha H 11,926,008,951 15,503,811,636 3,577,802,685 2018-2019 All districts


works
a
Other 73,380 Project 395,470,119 435,017,130 39,547,011 2018-2019 All districts
activities
IDP Model 47 Villages Villa 9,250,248,259 10,175,273,084.90 925,024,826 2018-2019 18 Districts
Villages

Genocide 360 12,362,585,302 13,598,843,832.20 1,236,258,530 2018-2019 1165 families


survivors’
houses
Bridges 10 17,020,217,097 18,722,238,806.70 1,702,021,710 2018-2019 11 districts

HELIPAD 2 207,556,629 228,312,291.90 20,755,663 2018-2019 2 Districts

Roads 283.233 Km 28,530,142,320 31,383,156,552.00 2,853,014,232 2018-2019 15 Districts


(unpaved)

Agriculture, l 152,525Ha, 5,454,438,642 5,999,882,506.20 545,443,864 2018-2019 All districts


ivestock and 2,672 cows,
environmental 9,820 chicken,
protection 3,322,853 Kgs
activities of Composts

Total 85,353,256,078 97,507,264,358 12,154,008,280