You are on page 1of 1

KEYPLAN

500
500

T1 T2

T3
500

450 450

NOTES:
2565

2885
1. THIS DRAWING IS THE COPYRIGHT OF WME CONSULTANTS, AND
MUST NOT BE RETAINED, COPIED OR USED WITHOUT THE ABOVE

1200

1200
CONSULTANT'S AUTHORITY.

1550
2. DO NOT SCALE FROM THE DRAWINGS.
3. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS IN METRES
UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE VERIFIED ON
SITE AND APPROVED BY THE ENGINEER.
4. ALL DRAWINGS SHOULD BE READ IN CONJUNCTION WITH OTHER
RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL AND
ELECTRICAL DRAWINGS AND ALL RELEVANT SECTIONS OF THE
SPECIFICATIONS. ANY DISCREPANCIES ARE TO BE BROUGHT TO
THE ATTENTION OF THE ENGINEER AND RESOLVED BEFORE
COMMENCEMENT OF ANY WORK.

STRUCTURAL REFERENCE DRAWING


500
BASEMENT-02 (FOUNDATION) GENERAL
RP-WME-ST-TWR1-B2-100-00
ARRANGEMENT PLAN
VERT. REINF. VERT. REINF. VERT. REINF. VERT. REINF. VERT. REINF.
TOWER 1 - BASEMENT-1 LEVEL GENERAL
RP-WME-ST-TWR1-B1-100-00
ARRANGEMENT PLAN - ZONE 1
PODIUM P1 LEVEL TO OUTER LINK OUTER LINK OUTER LINK PODIUM P1 LEVEL TO OUTER LINK OUTER LINK TOWER 1 - GROUND FLOOR GENERAL
U/S PODIUM P2 LEVEL U/S PODIUM P2 LEVEL RP-WME-ST-TWR1-GF-100-00
ARRANGEMENT PLAN - ZONE 1
INNER LINKS INNER LINKS INNER LINKS INNER LINKS INNER LINKS
TOWER 1 - PODIUM P1 LEVEL GENERAL
RP-WME-ST-TWR1-P1-100-00
ARRANGEMENT PLAN - ZONE 1

500 500 TOWER 1 - PODIUM P2 LEVEL GENERAL


RP-WME-ST-TWR1-P2-100-00
ARRANGEMENT PLAN - ZONE 1

TOWER 1 - PODIUM P3 & P4 LEVEL


RP-WME-ST-TWR1-P3-100-00
GENERAL ARRANGEMENT PLAN - ZONE 1

500

450
450

3900
ARCH. REFERENCE DRAWING
RECEIVE MAIL ON -23RD MARCH 2023
2565

2885

1200

1200
1550

VERT. REINF. VERT. REINF. VERT. REINF. VERT. REINF. VERT. REINF. VERT. REINF.

GROUND LEVEL TO OUTER LINK OUTER LINK OUTER LINK GROUND LEVEL TO OUTER LINK GROUND LEVEL TO OUTER LINK OUTER LINK
U/S PODIUM P1 LEVEL U/S PODIUM P2 LEVEL U/S PODIUM P1 LEVEL
INNER LINKS INNER LINKS INNER LINKS INNER LINKS INNER LINKS INNER LINKS

500

500
R0 11.04.2023 ISSUED FOR CONSTRUCTION RK
500 REV NO. DATE DESCRIPTION BY.
STATUS:
ISSUED FOR CONSTRUCTION
PROJECT:
500

RIVALI PARK, PHASE III


Mumbai, India
450 525
CLIENT:
3900

400
2885
1550
2565

1200

1200
600
ARCHITECT:

29 Bank Street, Fort, Mumbai 400 023 Tel : 2266 1920

STRUCTURAL / MEP CONSULTANT:

VERT. REINF. VERT. REINF. VERT. REINF. VERT. REINF. VERT. REINF. VERT. REINF. VERT. REINF.
DRAWING TITLE:

FOUNDATION TO OUTER LINK OUTER LINK OUTER LINK FOUNDATION TO OUTER LINK FOUNDATION TO OUTER LINK OUTER LINK OUTER LINK
TOWER-01
U/S GROUND LEVEL U/S GROUND LEVEL U/S GROUND LEVEL
INNER LINKS INNER LINKS INNER LINKS INNER LINKS INNER LINKS INNER LINKS INNER LINKS COLUMN SCHEDULE - SHEET 3

T1-C20,T1-C21 T1-C22 T1-C23,T1-C26 T1-C24,T1-C25 PC01 PC02 PC03


FLOOR LVL DATE: SCALE @ A1: DRN BY: CHKD BY: APP BY: REVISION
11-04-2023 1 : 25 SR SP NR R0
SECTION SECTION SECTION SECTION SECTION SECTION SECTION PROJECT No: DRAWING No:
P550012 RP-WME-ST-TWR1-00-410-03

You might also like