M&I/INSP-01
10.01.01.02 Circumferential drain is free from water stagnation YES Found satisfactory
and debris.
10.01.01.03 No voids found between annular / sketch plate YES Found satisfactory
extensions and foundation surface.
10.01.01.04 Rainwater drains are found away from tank shell and YES Found satisfactory
no sign of water stagnating on extension plate was
observed.
10.01.02.01 Annular / Sketch plate extensions are free from NO Deposits of Bitumen is found on
corrosion, pitting, scales and the painting condition is entire Bottom Plate Extension
satisfactory. (SPE/APE)along the periphery.
10.01.02.02 Annular / Sketch plate width and thickness readings YES Thickness readings taken on APE
are satisfactory. were found satisfactory with
thickness varying between 7.6 mm
to 8.8 mm.
https://spandan.indianoil.co.in/MI_NEW/inspMainPage 1/10
10/30/23, 2:33 PM Inspection Main Report
10.01.03.01 Shell plates are found free from corrosion patches, NO Shell course painting peeled off
pitting, and scales and the painting condition is and deteriorated at more than
satisfactory. 50% area. Major deteriorated
painting area are as follow 1. 2nd,
3rd shell course above manhole
(with PT nozzle) 2. 2nd to
8thShell course along fire water
sprinkler no. 8, 10, 11 & 12 3. 7th
shell course along fire water
sprinkler no. 14 4.Manhole &
adjacent area towards TankT007
5. 3rd, 4th, 7th & 8th shell course
above Outlet Nozzle etc.
10.01.03.02 Shell plates are free from abnormal dents / buckles. NO Dent observed on 6th shell course
above first landing platform. No
sweating/leakage observed at that
area. However Thickness reading
of the subject shell plate is found
satisfactory as mentioned in sr.
no. 43.01.03.11
10.01.03.03 Shell plates are free from sweating / leaks /cold weld YES Found satisfactory
/temporary repairs /patch plates not conforming to
API 653, etc.
10.01.03.04 Thickness readings for all manholes and nozzle necks NO Neck Thickness of Inlet nozzle
in the lower part of the tank are satisfactory. (150mm),Outlet nozzle (300mm) ,
Manhole# 1 neck(with PT nozzle),
WDL Nozzle, PT Nozzle & Bolting
Flange of Manhole#2 are arrived
below retiring thickness as per
M&I circular ref no HO/M&I/33/40
& HO/M&I/33/40-Clar.
10.01.03.06 Supports for connected P/Ls are at correct level and NO Point contacts at piping support
pipelines are not misaligned causing torsion in are not provided under water
nozzles. draw off line(WDL) & under Outlet
nozzle line.
https://spandan.indianoil.co.in/MI_NEW/inspMainPage 2/10
10/30/23, 2:33 PM Inspection Main Report
10.01.03.09 Verticality of the tank is satisfactory. If not, measure YES Found satisfactory as per visual
settlement around perimeter of tank to check for inspection
abnormal/uneven settlement. (Readings as per Annex
B – API 653)
10.01.03.10 Shell plate’s thickness readings in bottom courses YES Shell plate thickness readings in
(near all T joints) are satisfactory (not below the bottom courses (near all T joints)
retiring level at any point). are found satisfactory. The
thickness readings of1st course
shell plates are varying from6.0 to
6.1 mm. The thickness readings of
2nd course shell plates are
varying from 6.0 to 6.2 mm
10.01.03.11 Shell plate’s thickness readings along the spiral YES Shell plate thickness readings
staircase in higher courses are satisfactory (not below along the spiral staircase in higher
the retiring level at any point). courses are found satisfactory.
The thickness readings at higher
courses are as given below : 3rd
course : 6.1, 4th course :6.1 mm,
5thcourse : 6.1 mm, 6thcourse :
6.1 mm, 7th course : 6.1 mm,8th
course : 6.0 mm
10.01.04.01 Roof plate thickness is satisfactory based on Hammer YES Roof area thickness readings are
test and UT test. found to vary from 5.0 to 5.2 mm.
10.01.04.04 Roof is free from temporary patch plates / cold weld YES
repairs.
10.01.04.06 Roof is frangible and curb angle and its weld joint NO Roof is not frangible. Roof
condition with shell plates is found satisfactory. handrail vertical supports are
welded on curb angle at multiple
locations.
10.01.04.07 Edge of the roof is hammer tested or ultrasonically YES No thinning observed on roof
examined to check for thin areas. edges
10.01.05.01 Roof plate thickness is satisfactory based on Hammer N/A It is IFR Tank & External
test and UT test. Inspection
https://spandan.indianoil.co.in/MI_NEW/inspMainPage 3/10
10/30/23, 2:33 PM Inspection Main Report
10.01.05.04 Roof is free from temporary patch plates / cold weld N/A
repairs.
10.01.05.10 Main drain / emergency drains along with water seal N/A
pots are checked and conditions are OK.
10.01.05.16 Gap between tank shell and roof rim is neither < N/A
150mm nor > 250mm at any place. (Check the gap &
record it in all directions-minimum 8 positions)
https://spandan.indianoil.co.in/MI_NEW/inspMainPage 4/10
10/30/23, 2:33 PM Inspection Main Report
10.01.05.17.01 Neoprene sheet is free from damage / distortion N/A It is IFR Tank & External
(indicating deterioration in the foam due to liquid Inspection
absorption).
10.01.05.17.04 Shoes — visually inspected for thinning and holes and N/A
found satisfactory.
10.01.05.18.01 Rim-mounted bolting bar is free from corrosion and N/A It is IFR Tank & External
broken welds. Inspection
10.01.05.20 Gap between gauge pipe and gauge well is uniform N/A
throughout its periphery. (Check the gap in all 4
directions and record it)
10.01.05.22 Manway and its cover are free from corrosion & YES
general condition is satisfactory.
https://spandan.indianoil.co.in/MI_NEW/inspMainPage 5/10
10/30/23, 2:33 PM Inspection Main Report
10.01.06.01 Number of free vents, sizes, and mesh sizes including YES 2 no of 250mm dia vents are
their conditions are satisfactory. provided on the roof. All the 2 Nos
250 mm vent meshes were found
clean .
10.01.06.02 Condition of nozzle necks at roof is satisfactory. YES Thickness readings of neck of
existing vent nozzles on roof
found satisfactory
10.01.06.04 Condition of earthing connections and numbers YES 2 nos of Earthing connections
provided are satisfactory. provided
10.01.07.01.01 Is free of pitting and holes, paint failure. YES Found satisfactory
10.01.07.01.03 No hazardous opening on the handrail between rolling N/A IFR Tank & External Inspection
ladder and the gauging platform when the floating
roof is at its lowest level.
10.01.07.02.01 Frame is free of corrosion and paint failure. YES Found satisfactory
10.01.07.02.02 Attachment of frame to supports and supports to tank YES Found satisfactory
are free of corrosion and weld failure.
10.01.07.02.03 Reinforcing pads where supports are attached to shell N/A No RF pads are provided
or roof are in acceptable condition.
10.01.07.02.04 Surface that deck plate or grating rests on, is free of YES Found satisfactory
thinning and holes.
https://spandan.indianoil.co.in/MI_NEW/inspMainPage 6/10
10/30/23, 2:33 PM Inspection Main Report
10.01.07.03.04 The extended grating on the deck plate is split so that N/A
the section above the deck plate is removable to carry
out maintenance on the deck plate.
10.01.07.04.01 Spiral stairway / steps are free from corrosion, paint YES Found satisfactory
failure, and weld failure. Supports of stairway steps
are satisfactory.
10.01.07.04.02 Stairway supports welds to reinforcing pads on shell YES Found satisfactory
are satisfactory.
10.01.07.05 Condition of Roof handrails (including knee guard, toe NO Roof handrail vertical supports are
guard and vertical posts) are found satisfactory. welded on curb angle at multiple
locations. Height of Roof handrail
is observed 910 mm which is not
as per B&R drawing and unsafe.
Roof handrail found bolted at one
location.
10.01.08.01.01 Nos. of legs is satisfactory (In case of discrepancy, N/A It is IFR Tank & External
report to Engg.) Inspection
10.01.08.01.02 Holes for cotter pin in leg sleeve pipes are free from N/A
tears.
10.01.09.01 Corrosion on the pipe joint was checked and found N/A It is IFR tank & External
satisfactory. Inspection
10.01.10.01 Shell plates painting condition is satisfactory. (Free NO Observation based on External
from damage, deterioration, and disbonding) Inspection already recorded in
10.01.03
10.01.10.03 Shell plates and seams are free from indications of YES
leakage.
https://spandan.indianoil.co.in/MI_NEW/inspMainPage 7/10
10/30/23, 2:33 PM Inspection Main Report
10.01.10.04 Roundness of the shell as per visual inspection is YES Observation based on External
acceptable. Inspection already recorded in
10.01.03
10.01.10.05 Shell plates are free from closely located deep pitting. YES Observation based on External
In case of deep pitting, measure the depth of pitting. Inspection already recorded in
10.01.03
10.01.10.06 Shell plates are free from temporary patch plates/ YES Observation based on External
cold weld repairs. Inspection already recorded in
10.01.03
Bottom (Sketch)
Plates
Annular Plates
(if any)
https://spandan.indianoil.co.in/MI_NEW/inspMainPage 8/10
10/30/23, 2:33 PM Inspection Main Report
Recirculation
Nozzle
Roof Plates
(Bottom Deck)
Any Other
Component
https://spandan.indianoil.co.in/MI_NEW/inspMainPage 9/10
10/30/23, 2:33 PM Inspection Main Report
https://spandan.indianoil.co.in/MI_NEW/inspMainPage 10/10