You are on page 1of 15

M/s.

VEE VEE CONTROLS PRIVATE LIMITED


Plot No. L-3 & 4, 9th Cross, 1st Stage,
Peenya Industrial Estate,
Bangalore - 560 058
Phone: +91-80-41272030 / 2050 Email ID: info@veeveecontrols.com
Website: www.veeveecontrols.com engg@veeveecontrols.com

5.5kW DC MOTOR STARTER PANEL

Customer: M/s. TRIVENI TURBINE LTD.

Client: M/s. KARADENIZ HOLDING A.S,TURKEY.

Project name: 16MW 11KV TG SET

Manufacturer: M/s. VEE VEE CONTROLS PVT. LTD.

P.O. No: 2000014403 DT:18.09.2014

Job No: V V 2014-196

Drawing No.: V V C 2014-196A.

Quantity: 01 No.

Appd By : D.R.Jayaram CUSTOMER : M/s. TRIVENI TURBINE LTD. SCALE : NTS


Description: CLIENT : M/s. KARADENIZ HOLDING A.S,TURKEY. JOB No : V V 2014-196 REV.No.
Chkd By : Manjunath.R PROJECT NAME : 16MW 11KV TG SET 01
01 ASBUILT DRAWING AT MR 05.03.2015 M/s. VEEVEE CONTROLS COVERING SHEET EQUIPMENT : 5.5kW DC MOTOR STARTER PANEL DRG SUB No. : V V C 2014-196A/COV
Drawn By : Aneesa. PVT.LTD.,
Rev Revision comment Prep Appd Date DATE : 25.09.2014 Sheet : 1 OF 1 Total Pages: 15
INDEX
SL. No. DRAWING No. SHEET No. DESCRIPTION REVISION

1 V V C 2014-196A/COV 1 OF 1 COVERING SHEET 01

2 V V C 2014-196A/IND 1 OF 1 INDEX SHEET 01

3 V V C 2014-196A/GA 1 OF 4 GENERAL ARRANGEMENT 01

4 V V C 2014-196A/GA 2 OF 4 GENERAL ARRANGEMENT 01

5 V V C 2014-196A/GA 3 OF 4 GENERAL ARRANGEMENT 01

6 V V C 2014-196A/GA 4 OF 4 GENERAL ARRANGEMENT 01

7 V V C 2014-196A/SCH 1 OF 5 SCHEMATIC DIAGRAM 01

8 V V C 2014-196A/SCH 2 OF 5 SCHEMATIC DIAGRAM 01

9 V V C 2014-196A/SCH 3 OF 5 SCHEMATIC DIAGRAM 01

10 V V C 2014-196A/SCH 4 OF 5 SCHEMATIC DIAGRAM 01

11 V V C 2014-196A/SCH 5 OF 5 SCHEMATIC DIAGRAM 01

12 V V C 2014-196A/TBD 1 OF 2 TERMINAL DIAGRAM 01

13 V V C 2014-196A/TBD 2 OF 2 TERMINAL DIAGRAM 01

14 V V C 2014-196A//BOM 1 OF 2 BILL OF MATERIALS 01

15 V V C 2014-196A//BOM 2 OF 2 BILL OF MATERIALS 01

Appd By : D.R.Jayaram CUSTOMER : M/s. TRIVENI TURBINE LTD. SCALE : NTS


Description: END USER : M/s. KARADENIZ HOLDING A.S,TURKEY. JOB No : V V 2014-196 REV.No.
Chkd By : Manjunath.R PROJECT NAME : 16MW 11KV TG SET 01
01 ASBUILT DRAWING AT MR 05.03.2015 M/s. VEEVEE CONTROLS INDEX SHEET EQUIPMENT : 5.5kW DC MOTOR STARTER PANEL DRG SUB No. : V V C 2014-196A/IND
Drawn By : Aneesa. PVT.LTD.,
Rev Revision comment Prep Appd Date DATE : 25.09.2014 Sheet : 1 OF 1 Total Pages: 15
ALL DIMENSIONS ARE IN mm UNLESS SPECIFIED

NAME PLATE DETAILS:

LEGEND DESCRIPTION

REAR SIDE
TURBINES
L1 DC SUPPLY ON
LOUVERS
L2 MOTOR ON
"X1" "X2"
L3 MOTOR OFF

L4 MOTOR OVER LOAD

L5 FIELD FAIL
RESISTOR CHAMBER
L6 AC SUPPLY ON

PB1 START PB

PB2 STOP PB

Q1 INCOMER MCCB

SW1 CONTROL CIRCUIT ON/OFF SWITCH

L1 L2 L3 L4 L5 L6 SW2 AUTO/MANUAL SEL.SWITCH

REAR FRONT V DC VOLTAGE

BOLTED MNP 5.5kW DC MOTOR STARTER PANEL


DOOR

Ø14mm

GLAND PLATE
Q1 250X500mm

E
ANTI-VIBRATION PAD
15mm THICK

D.R.Jayaram M/s. TRIVENI TURBINE LTD.


M/s. KARADENIZ HOLDING A.S,TURKEY. V V 2014-196
Manjunath.R 16MW 11KV TG SET 01
01 ASBUILT DRAWING AT MR 05.03.2015 GENERAL ARRANGEMENT 5.5kW DC MOTOR STARTER PANEL V V C 2014-196A/GA
Aneesa.
25.09.2014 1 4 15
D1-D3

CABLE TROUGH
DLS PL

TH

C1 C2 C3

CABLE TROUGH

CABLE TROUGH
CABLE TROUGH

T1 T2 T3

CTD
R1
C1X C4 C5 C7 C6
F1 F2

CABLE TROUGH

SH1 FFR
Q1

X1 X2 X3 X4 X5 X6

D.R.Jayaram M/s. TRIVENI TURBINE LTD.


M/s. KARADENIZ HOLDING A.S,TURKEY. V V 2014-196
Manjunath.R 16MW 11KV TG SET 01
01 ASBUILT DRAWING AT MR 05.03.2015 GENERAL ARRANGEMENT 5.5kW DC MOTOR STARTER PANEL V V C 2014-196A/GA
Aneesa.
25.09.2014 2 4 15
CONSTRUCTION DETAILS & GENERAL NOTES:-

1. ENCLOSURE DETAILS:
f) SHIELD CABLE 1Sq.mm 2 CORE SHIELDED
a) OVER ALL DIMENSION 1915(H)x700(W)x450(D)
g) POTENTIAL FREE CIRCUITS 1.5Sq.mm (GREY)
(INCLUDING PLINTH)
b) LOAD BEARING MEMBER 2.5mm, CRCA h) 230V AC AUXILIARY CIRCUITS 2.5Sq.mm BROWN(+ve),BLUE(-ve)
c) NON LOAD BEARING MEMBER 2mm, CRCA
d) GLAND PLATE THICKNESS 3mm, CRCA 5. LABELS & LEGEND DETAILS:
e) BASE FRAME HEIGHT 100mm a) PATTERN LETTERS ENGRAVED ON BLACK
f) BASE FRAME THICKNESS 3mm, CRCA BACK GROUND
g) ANTI VIBRATION PAD 15mm THICK b) MATERIAL ANODISED ALUMINIUM STRIPS
h) ENCLOSURE PROTECTION IP 52
i) RESISTOR CHAMBER PROTECTION IP 42 6. VOLTAGE DETAILS:
j) PANEL TYPE SIMPLEX, FLOOR MOUNTING a) MAIN INCOMING SUPPLY 110V DC +/-10%
k) GASKET MATERIAL CROSS LINKED POLY ETHYLENE b) CONTROL SUPPLY 110V DC +/-10%
l) WEIGHT OF THE ENCLOSURE apprx. 250kgs.
c) AUXILIARY SUPPLY 230V AC,50HZ
2. SHADE & PAINTING DETAILS:
7. CABLE ENTRY DETAILS:
a) PAINTING TYPE POWDER COATED
a) INCOMING CABLE BOTTOM
b) SHADE INTERIOR RAL 7035
b) OUTGOING CABLE BOTTOM
c) SHADE EXTERIOR RAL 7035
d) THICKNESS 80 Microns(min.)
e) BASE FRAME BLACK 8. STANDARD REFERENCE: IEC-61439:2009

3. BUS BAR DETAILS:

a) EARTH BUS BAR SIZE 25x6mm, TINNED COPPER


b) ENCLOSURE EARTHING EXTENDABLE ON BOTH SIDES OF THE PANEL
PROVISION (LINKS PROVIDED)

4. CABLE DETAILS:

a) GRADE 1.1kV PVC INSULATED FLEXIBLE MULTISTRAND COPPER


b) CABLES FOR CONTROL CIRCUIT 1.5Sq.mm BROWN(+ve),GREY(-ve)
c) CABLES FOR EARTHING 2.5Sq.mm YELLOW WITH GREEN STRIP LINE
d) POWER CABLES ARMATURE CIRCUIT 35Sq.mm & FIELD CIRCUIT 2.5Sq.mm
e) POWER CABLES COLOUR
BLACK CABLE WITH FERRULES AT END.

D.R.Jayaram M/s. TRIVENI TURBINE LTD.


M/s. KARADENIZ HOLDING A.S,TURKEY. V V 2014-196
Manjunath.R 16MW 11KV TG SET 01
01 ASBUILT DRAWING AT MR 05.03.2015 GENERAL ARRANGEMENT 5.5kW DC MOTOR STARTER PANEL V V C 2014-196A/GA
Aneesa.
25.09.2014 3 4 15
4-HOLES Ø4.5

SUPPLIED BY

M/s. TRIVENI TURBINE LIMITED


12A, Peenya Industrial Area, Bangalore-560 058, INDIA.
Phone No. : +91-80-22164000
Fax No. : +91-80-28395211
Website : www.triveniturbines.com
Email : customercare@triveniturbines.com

MANUFACTURED BY

125
VEEVEE CONTROLS PRIVATE LIMITED
PLOT NO. L-3 & 4, 9th CROSS, 1st STAGE NOTES:-
PEENYA INDUSTRIAL ESTATE, BANGALORE - 560058 1. HEIGHT OF LETTERS TO BE ENGRAVED : 4.5mm FOR VEE VEE
PHONE : +91-80-23724947, +91-80-28379161/62
4.5mm FOR TRIVENI
FAX : +91-80- 28397316
4mm FOR PROJECT
WEB : www.veeveecontrols.com
3mm FOR OTHERS

PROJECT: 16MW, 11kV TG SET 2. QTY:- 1 No.


3. BACK GROUND:- POLISHED STAINLESS STEEL
4. LETTERS:- ENGRRAVED WITH BLACK
END USER: M/s. KARADENIZ HOLDING A.S,TURKEY
EQUIPMENT : DC MOTOR STARTER PANEL 8 5. MATERIAL:- POLISHED STAINLESS STEEL 1 mm THICK

SERIAL NO.: VVC2014 - 196A Year : 2015

8
190

4-HOLES Ø4.5

TECHNICAL INFORMATION
PRODUCT DETAILS

EQUIPMENT : DC MOTOR STARTER PANEL

SERIAL NO.: VVC2014-196A Year : 2015

POWER SUPPLY INPUTS : CONTROL CIRCUIT-110V DC +/-10%


AUXILIARY SUPPLY-230V AC,50HZ
125

--

MOTOR DETAILS: RATING: 5.5kW / 7.5HP


NOTES:-
RATED CURRENT: 59A
1. HEIGHT OF LETTERS TO BE ENGRAVED : 4mm FOR TEC DET
RATED VOLTAGE: 110VDC 3mm FOR OTHERS
FIELD CURRENT: 1.75A 2. QTY:- 1 No.
SPEED: 1440 RPM (5% REGULATION) 3. BACK GROUND:- POLISHED STAINLESS STEEL

ENCLOSURE PROTECTION : IP-52 4. LETTERS:- ENGRAVED WITH BLACK


5. MATERIAL:- POLISHED STAINLESS STEEL 1 mm THICK
DRAWING REF : VVC2014 - 196A
CUSTOMER PO NO. : 2000014403.DT:18.09.2014

8
8

190

D.R.Jayaram M/s. TRIVENI TURBINE LTD.


M/s. KARADENIZ HOLDING A.S,TURKEY. V V 2014-196
Manjunath.R 16MW 11KV TG SET 01
01 ASBUILT DRAWING AT MR 05.03.2015 GENERAL ARRANGEMENT 5.5kW DC MOTOR STARTER PANEL V V C 2014-196A/GA
Aneesa.
25.09.2014 4 4 15
1 2 3 4 5 6

110VDC INCOMING
SUPPLY
(+) (-)
NOTE
** FOR OLR RANGE, REFER BOM
X1 1 2

A 35 Sqmm A

J1 J4

1 3 5
4-20mA
TRANSDUCER OUTPUT
-Q1 TO PLC
200A,3P I> I> I>
MCCB
2 4 6
J2 3.3:B 3.3:B

SPARE
J20 J21
X4 1 X4 2
X4 3 X4 4

J3 110V DC SUPPLY
/2.1:A S3 S4
J5 TO CONTROL
/2.1:C CIRCUIT
B
S5 S6 B
AUX.
7 8 SUPP. 2 1 4 3 CTD
J3
6 5
35 Sqmm
S1 S2
-OLR
R1 R2 -C1 -C1
J3 J6 J7 J10 1 2 J14 3 4 J15 1 2 J16 X2 1
0.4667Ohms 0.4667Ohms
-SH1 /2.4:C /2.4:C
**
150A, 75mV TO EOP MOTOR
J5 97 98 /3.3:B ARMATURE
-C2 -C2
J6 1 2 J8 3 4
X2 2

/2.6:C /2.6:C

x1 -C3 -C3
C -L1 1 2 J9 3 4 J10 C
x2
/3.2:C /3.2:C

J5 J5

C6 -C6 -C6
2.5 Sqmm 1 2 J11 3 4 J12 5 6 J13 X3 1

TO EOP MOTOR
/2.3:C /2.3:C /2.3:C -FFR FIELD
A1 A2 J17 X3 2
DC SUPPLY ON
1 - 2A

D D
3 4 /2.4:A

Appd By : D.R.Jayaram CUSTOMER : M/s. TRIVENI TURBINE LTD. SCALE : NTS


Description: CLIENT : M/s. KARADENIZ HOLDING A.S,TURKEY. JOB No : V V 2014-196 REV.No.
Chkd By : Manjunath.R PROJECT NAME : 16MW 11KV TG SET 01
01 ASBUILT DRAWING AT MR 05.03.2015 M/s. VEEVEE CONTROLS SCHEMATIC DIAGRAM EQUIPMENT : 5.5kW DC MOTOR STARTER PANEL DRG SUB No. : V V C 2014-196A/SCH
Drawn By : Aneesa. PVT.LTD.,
Rev Revision comment Prep Appd Date DATE : 25.09.2014 Sheet : 1 OF 5 Total Pages: 15
1 2 3 4 5 6
1 2 3 4 5 6

-SW1 F1
16A,2P
J3 J18 1 2 J20 J20 J20 J20 J20 J20
A 1.1:B /3.1:A A
6A,2P
/2.1:C
PB2
STOP PB J22

X4 5
LPBS

T1
/2.5:C
STOP 13
3 13 15
21
-C4
-FFR C6 -C3
X4 6 /2.2:C 14
/1.5:D 4 /2.3:C 14 16 18
J23 /3.2:C 22

X4 7
EOP CUT OFF J28
(DO FROM PLC) J32

J28 J28 J34


X4 J24
8
J24

B B
A/M 1 43 16 18 13
-C5 -T3 -C5
/2.4:C 44 /2.4:C 15 J31 /2.4:C 14 13 J36
A M
J29 -C1
J25 J27
/2.4:C 14
J30

X4 9 X4 11
EOP CUT IN LPBS 63
J33
(DO FROM PLC) START C4 J35
/2.2:C 64
PB1
START PB
X4 10 X4 12 J33
J26
J26

A1 A1 A1 A1 A1 A1 A1 A1
-C4 C6 -T3 -C5 -C1 -C1X -T1 -C2
A2 A2 A2 A2 A2 A2 A2 A2

C C

F1
J5 J19 3 4 J21 J21 J21 J21 J21 J21 J21 J21 J21
1.1:B /3.1:C
6A,2P START/STOP FIELD CONT. DELAY FOR C1 ON FFR MULT. CONT. MAIN CONT. MAIN CONT. MULT. DELAY FOR C2 ON RES. SHORTING CONT.
/2.1:A MULT. CONT.

13 14 /2.3:A 1 2 /1.4:D 18 13 14 /2.4:B 1 2 /1.4:B 13 14 /5.2:B 18 1 2 /1.3:C


15 /2.6:A
23 24 /3.6:B 3 4 /1.4:D 16 15 /2.3:B 21 22 /3.6:B 3 4 /1.4:B 43 44 /5.4:B 16 3 4 /1.3:C
33 34 /5.4:B 5 6 /1.4:D 31 32 /5.2:C 13 14 /2.5:B 28
43 44 /2.3:B 25 /3.1:B
43 44 /5.2:B 13 14 /2.4:A 21 22 /3.5:B 26
53 54 /5.2:A 21 22 61 62 /5.4:C 43 44 /3.5:B
63 64 /2.3:B 31 32
73 74 /5.4:A 43 44 /3.2:B

D D

Appd By : D.R.Jayaram CUSTOMER : M/s. TRIVENI TURBINE LTD. SCALE : NTS


Description: CLIENT : M/s. KARADENIZ HOLDING A.S,TURKEY. JOB No : V V 2014-196 REV.No.
Chkd By : Manjunath.R PROJECT NAME : 16MW 11KV TG SET 01
01 ASBUILT DRAWING AT MR 05.03.2015 M/s. VEEVEE CONTROLS SCHEMATIC DIAGRAM EQUIPMENT : 5.5kW DC MOTOR STARTER PANEL DRG SUB No. : V V C 2014-196A/SCH
Drawn By : Aneesa. PVT.LTD.,
Rev Revision comment Prep Appd Date DATE : 25.09.2014 Sheet : 2 OF 5 Total Pages: 15
1 2 3 4 5 6
1 2 3 4 5 6

A A

J20 J20 J20 J20 J20 J20 J20 J20 J20


/2.6:A

T2
/3.1:C
13
J20
T1
/2.5:C

15
25
-C3
16 18 /3.2:C 14 43 21 13 21
97
26 28 -OLR -C1 -C1 C7 -C5
/1.5:B 98 /2.4:C 44 /2.4:C 22 /3.3:C 14 /2.4:C 22
J38

J39
AX1
B 1.2:B J45 B

V
AUX. SUPPLY TO 0-150VDC
43
TRANSDUCER
C6 + +
/2.3:C V1 23
J37 44 AUX.
J41 AX2 V2 SUPP. J42 J43 J44 -C4
1.2:B - - /2.2:C 24

J40
J46

J21
A1 A1 A1 x1 x1 x1 x1

C
-T2 -C3 C7 -L2 -L3 -L4 -L5 C
A2 A2 A2 x2 x2 x2 x2

J21 J21 J21 J21 J21 J21 J21 J21 J21


/2.6:C
DELAY FOR C3 ON RES. SHORTING CONT. OLR MULT. CONT. AUX. SUPPLY TO VOLTMETER AUX.SUPPLY
TRANSDUCER TO VOLTMETER MOTOR ON MOTOR OFF MOTOR OVER LOAD FIELD FAIL

18 1 2 /1.3:C 13 14 /3.5:B
15 /3.2:B
16 3 4 /1.3:C 23 24 /5.4:C
13 14 /3.2:B 33 34 /5.2:C
21 22 /2.5:A 43 44

D D

Appd By : D.R.Jayaram CUSTOMER : M/s. TRIVENI TURBINE LTD. SCALE : NTS


Description: CLIENT : M/s. KARADENIZ HOLDING A.S,TURKEY. JOB No : V V 2014-196 REV.No.
Chkd By : Manjunath.R PROJECT NAME : 16MW 11KV TG SET 01
01 ASBUILT DRAWING AT MR 05.03.2015 M/s. VEEVEE CONTROLS SCHEMATIC DIAGRAM EQUIPMENT : 5.5kW DC MOTOR STARTER PANEL DRG SUB No. : V V C 2014-196A/SCH
Drawn By : Aneesa. PVT.LTD.,
Rev Revision comment Prep Appd Date DATE : 25.09.2014 Sheet : 3 OF 5 Total Pages: 15
1 2 3 4 5 6
1 2 3 4 5 6

230V AC SUPPLY
A A
BY CLIENT

X6
1 2

H1 H2

1 3
F2
MCB 2 4
DP, 6A

H3 H4

H3 H3
B B

1
DLS
2

H6

1
x1
C
TH C
2 -L6
x2 x1
H4
H5 PL

x2
x1

SH
x2

H4 H4 H4

HEATER ON AC SUPPLY ON

D D

Appd By : D.R.Jayaram CUSTOMER : M/s. TRIVENI TURBINE LTD. SCALE : NTS


Description: CLIENT : M/s. KARADENIZ HOLDING A.S,TURKEY. JOB No : V V 2014-196 REV.No.
Chkd By : Manjunath.R PROJECT NAME : 16MW 11KV TG SET 01
01 ASBUILT DRAWING AT MR 05.03.2015 M/s. VEEVEE CONTROLS SCHEMATIC DIAGRAM EQUIPMENT : 5.5kW DC MOTOR STARTER PANEL DRG SUB No. : V V C 2014-196A/SCH
Drawn By : Aneesa. PVT.LTD.,
Rev Revision comment Prep Appd Date DATE : 25.09.2014 Sheet : 4 OF 5 Total Pages: 15
1 2 3 4 5 6
1 2 3 4 5 6

FEEDBACK TO SPARE FEEDBACK TO PLC


FEEDBACK TO PLC

X4 13 U1 X5 1 U10
X5 9 U19
A A

73
53
-C4
START/STOP FEEDBACK -C4 START/STOP FEEDBACK /2.2:C 74
/2.2:C 54 A/M 2
AUTO/MANUAL
SEL. SWITCH TO PLC
A M
X4 14 U2 X5 2 U11

X5 10 U20

X4 15 U3 X5 3 U12

X5 11 U21

13 43

MOTOR ON FEEDBACK -C1X MOTOR ON FEEDBACK -C1X


/2.5:C 14 /2.5:C 44

B B
X4 16 U4 X5 4 U13

X4 17 U5 X5 5 U14

43 33
-C4 -C4
/2.2:C 44 /2.2:C 34

U9 U18
FIELD FAIL FEEDBACK FIELD FAIL FEEDBACK
31 61
-C5 -C5
/2.4:C 32 /2.4:C 62

C C
X4 18 U6 X5 6 U15

X4 19 U7 X5 7 U16

33 23

OVER LOAD FEEDBACK -C7 OVER LOAD FEEDBACK -C7


/3.3:C 34 /3.3:C 24

X4 20 U8 X5 8 U17

D D

Appd By : D.R.Jayaram CUSTOMER : M/s. TRIVENI TURBINE LTD. SCALE : NTS


Description: CLIENT : M/s. KARADENIZ HOLDING A.S,TURKEY. JOB No : V V 2014-196 REV.No.
Chkd By : Manjunath.R PROJECT NAME : 16MW 11KV TG SET 01
01 ASBUILT DRAWING AT MR 05.03.2015 M/s. VEEVEE CONTROLS SCHEMATIC DIAGRAM EQUIPMENT : 5.5kW DC MOTOR STARTER PANEL DRG SUB No. : V V C 2014-196A/SCH
Drawn By : Aneesa. PVT.LTD.,
Rev Revision comment Prep Appd Date DATE : 25.09.2014 Sheet : 5 OF 5 Total Pages: 15
1 2 3 4 5 6
X1 Application
X4 Application
J1 J25
1 110VDC INCOMING SUPPLY (+VE) 9 EOP CUT IN (DO FROM PLC)
J4 J26
2 110VDC INCOMING SUPPLY (-VE) 10 EOP CUT IN (DO FROM PLC)

3 SPARE 11 LPBS START


J26
12 LPBS START
U1
13 START/STOP FEEDBACK-SPARE
U2
X2 Application
14 START/STOP FEEDBACK-SPARE
U3
15 MOTOR ON FEEDBACK-SPARE
J16
1 TO EOP MOTOR ARMATURE
U4
16 MOTOR ON FEEDBACK-SPARE
J5
2 TO EOP MOTOR ARMATURE
U5
17 FIELD FAIL FEEDBACK-SPARE
3 SPARE
U6
18 FIELD FAIL FEEDBACK-SPARE
U7
19 OVER LOAD FEEDBACK-SPARE
U8
20 OVER LOAD FEEDBACK-SPARE
X3 Application 21 SPARE
J13
1 TO EOP MOTOR FIELD 22 SPARE
J17
2 TO EOP MOTOR FIELD

3 SPARE

X4 Application
X5 Application
S3 U10
1 4-20mA TRANSDUCER OUTPUT TO PLC 1 START/STOP FEEDBACK TO PLC
S4 U11
2 4-20mA TRANSDUCER OUTPUT TO PLC 2 START/STOP FEEDBACK TO PLC
S5 U12
3 4-20mA TRANSDUCER OUTPUT-SPARE 3 MOTOR ON FEEDBACK TO PLC
S6 U13
4 4-20mA TRANSDUCER OUTPUT-SPARE 4 MOTOR ON FEEDBACK TO PLC
J22 U14
5 LPBS STOP 5 FIELD FAIL FEEDBACK TO PLC
J23 U15
6 LPBS STOP 6 FIELD FAIL FEEDBACK TO PLC
J23 U16
7 EOP CUT OFF (DO FROM PLC) 7 OVER LOAD FEEDBACK TO PLC
J24 U17
8 EOP CUT OFF (DO FROM PLC) 8 OVER LOAD FEEDBACK TO PLC

Appd By : D.R.Jayaram CUSTOMER : M/s. TRIVENI TURBINE LTD. SCALE : NTS


Description: CLIENT : M/s. KARADENIZ HOLDING A.S,TURKEY. JOB No : V V 2014-196 REV.No.
Chkd By : Manjunath.R PROJECT NAME : 16MW 11KV TG SET 01
01 ASBUILT DRAWING AT MR 05.03.2015 M/s. VEEVEE CONTROLS TERMINAL DIAGRAM EQUIPMENT : 5.5kW DC MOTOR STARTER PANEL DRG SUB No. : V V C 2014-196A/TBD
Drawn By : Aneesa. PVT.LTD.,
Rev Revision comment Prep Appd Date DATE : 25.09.2014 Sheet : 1 OF 2 Total Pages: 15
X5 Application
U19
9 AUTO/MANUAL SEL. SWITCH TO PLC
U20
10 AUTO/MANUAL SEL. SWITCH TO PLC
U21
11 AUTO/MANUAL SEL. SWITCH TO PLC

12 SPARE

X6 Application
H1
1 230V AC SUPPLY BY CLIENT
H2
2 230V AC SUPPLY BY CLIENT

Appd By : D.R.Jayaram CUSTOMER : M/s. TRIVENI TURBINE LTD. SCALE : NTS


Description: CLIENT : M/s. KARADENIZ HOLDING A.S,TURKEY. JOB No : V V 2014-196 REV.No.
Chkd By : Manjunath.R PROJECT NAME : 16MW 11KV TG SET 01
01 ASBUILT DRAWING AT MR 05.03.2015 M/s. VEEVEE CONTROLS TERMINAL DIAGRAM EQUIPMENT : 5.5kW DC MOTOR STARTER PANEL DRG SUB No. : V V C 2014-196A/TBD
Drawn By : Aneesa. PVT.LTD.,
Rev Revision comment Prep Appd Date DATE : 25.09.2014 Sheet : 2 OF 2 Total Pages: 15
CUSTOMER: M/s. TRIVENI TURBINE LTD. PO No. : 2000014403 DT:18.09.2014
END USER: M/s. KARADENIZ HOLDING
JOB No. : VV 2014-196
A.S.TURKEY.
PROJECT : 16MW-11KV TG SET DRG. No. : VVC 2014-196A/BOM
REV. No. :01 , DT:05.03.2015 QUANTITY: 01 No.
BILL OF MATERIAL FOR 5.5kW DC MOTOR STARTER PANEL
SL. No. ITEM DESCRIPTION SPECIFICATION TAG MAKE TOTAL

1 MCCB MCCB, TM BASED O/L,S/C, WITH RHOM Q1 SIEMENS 1


CURRENT RATING : 200A
VOLTAGE : 110V DC
No. OF POLES :3
CAPACITY : 25kA

2 CONTROL SWITCH CURRENT RATING : 16A SW1 SWITRON 1


VOLTAGE RATING : 110V DC
No. OF POLES :2
OPERATION : ON/OFF, STAY PUT
SIZE : 75Sq.mm

3 POWER CONTACTORS CURRENT RATING : 220A, 2P, DC1 DUTY C1,C2,C3 SIEMENS 3
COIL VOLTAGE : 110V DC
AUX CONTACTS : 2NO+2NC

3.1 CURRENT RATING : 32A, 3P, AC3 DUTY C6 SIEMENS 1


COIL VOLTAGE : 110V DC
AUX CONTACTS : 2NO+2NC

4 CONTROL CONTACTORS COIL VOLTAGE : 110V DC C5 SIEMENS 1


AUX CONTACTS : 2NO+2NC
ADD ON BLOCK : 1NC

4.1 COIL VOLTAGE : 110V DC C1X,C7 SIEMENS 2


AUX CONTACTS : 4NO

4.2 COIL VOLTAGE : 110V DC C4 SIEMENS 1


AUX CONTACTS : 4NO
ADD ON BLOCK : 3NO+1NC

5 OVERLOAD RELAY AUTO RESET TYPE (FOR OLR RANGE, REFER THE GIVEN OLR TABLE) OLR SIEMENS 1
INDEPENDENT MOUNTING KIT

6 INDICATING LAMPS 22.5mm Dia. LED TYPE, VOLTAGE: 110V DC, COLOUR: RED L1,L2 SIEMENS 2
22.5mm Dia. LED TYPE, VOLTAGE: 110V DC, COLOUR: GREEN L3 SIEMENS 1
22.5mm Dia. LED TYPE, VOLTAGE: 110V DC, COLOUR: AMBER L4 SIEMENS 1
22.5mm Dia. LED TYPE, VOLTAGE: 110V DC, COLOUR: WHITE L5 SIEMENS 1
22.5mm Dia. LED TYPE, VOLTAGE: 230V AC, COLOUR: RED L6 SIEMENS 1

7 TIMER RANGE : 0-60 Sec./0-60min., ON DELAY T1,T2,T3 SIEMENS 3


VOLTAGE : 110V DC
AUX. CONTACTS : 2 C/O

Page 01 of 02
CUSTOMER: M/s. TRIVENI TURBINE LTD. PO No. : 2000014403 DT:18.09.2014
END USER: M/s. KARADENIZ HOLDING
JOB No. : VV 2014-196
A.S.TURKEY.
PROJECT : 16MW-11KV TG SET DRG. No. : VVC 2014-196A/BOM
REV. No. :01 , DT:05.03.2015 QUANTITY: 01 No.
BILL OF MATERIAL FOR 5.5kW DC MOTOR STARTER PANEL
SL. No. ITEM DESCRIPTION SPECIFICATION TAG MAKE TOTAL
8 FIELD FAILURE RELAY 1-2A FFR SYSTEM HARDWARE 1

9 POWER RESISTOR TYPE : PUNCHED STAINLESS STEEL R1 & R2 OHMARK 1 SET


VALUE : 2.8 Ohms (0.4667 Ohms + 0.4667 Ohms)
POWER : 1200Watts
CONNECTION : 6Nos. Connected in parallel & 2 banks Connected in series

10 MINIATURE CIRCUIT BREAKER 6A, 2P, 10KA, 110VDC F1 SIEMENS 1


6A, 2P, 10KA, 230VAC F2 SIEMENS 1

11 CURRENT TRANSDUCER CURRENT TRANSDUCER, AUX.SUPPLY: 110VDC,CL:0.5


INPUT: 0-75mV, OUTPUT: 4-20mA (DUAL OUTPUT) CTD RISHAB 1

12 AUTO/MANUAL SEL. SWITCH STAYPUT,32A, 75 Sq.mm DIA., 2 POLE, 2 POSITION WITHOUT OFF, 110VDC SW2 SWITRON 1
LOCKABLE TYPE

13 PUSH BUTTON 22.5mm Dia, 1NO+1NC, START:GREEN, STOP:RED PB1,PB2 SIEMENS 2

14 THERMOSTAT THERMOSTAT, 230VAC, 50Hz, 30-80ºC TH GIRISH 1

15 SPACE HEATER 80W,230VAC, SH GIRISH 1

16 SHUNT OUTPUT : 150A/0-75mV SH1 AE 1

17 TERMINAL BLOCKS POWER TB – 50Sq.mm X1,X2,X3 ELMEX AS REQ


STUD TYPE – 2.5Sq.mm X4,X5,X6 ELMEX AS REQ

18 VOLTMETER TYPE : DIGITAL, ACCURACY CLASS : 1.0 V ELMEASURE 1


INPUT : 0-150V DC
AUX. SUPPLY : 110V DC
RANGE : 0-150V DC
SIZE : 96x96mm

19 DOOR LIMIT SWITCH 6A, 1POLE, 1NO+1NC, 230V AC DLS SIEMENS 1

20 PANEL LAMP 11Watts, 230V AC, CFL WITH ONE FEET FITTING PL PHILIPS 1

OLR TABLE
SL.No MAKE OF DC MOTOR ARMAUTRE CURRENT SIEMENS
1 CROMPTON GREVES 59 57-75A

FFR TABLE
SL. No. MAKE OF DC MOTOR FIELD CURRENT SYSTEM HARDWARE
1 CROMPTON GREVES 1.75A 1 – 2A

NOTE: ALL COMPONENTS SHALL BE AS PER IEC STANDARD

Page 02 of 02