You are on page 1of 7

DOCUMENT STATUS: FOR REFERENCE

A 19/04/2009 FOR REFERENCE Various N.N.Thang N.H.Hieu


Revision Date Description Author Checked Approved

Project:

NHON TRACH 2 – 750MW COMBINED CYCLE POWER PLANT PROJECT

Owner: Consultant:
PETROVIETNAM
NHON TRACH 2 POWER
PVNT2 JOINT STOCK COMPANY /PECC2

EPC Contractor:

LILAMA - PVC CONSORTIUM


Consultant:

FICHTNER GmbH & Co.KG CONNELL WAGNER (AURECON)


Subcontractor:

Document Title: LOT 4: CIVIL WORKS


METHOD STATEMENT CONSTRUCTION FOR EPOXY COATING
BEFORE GENERATOR ERECTION (10UMA AND 11/12UMB)

Project No.: Format: A4 Total pages : 3 pages


Designed by: PVC Checked by:
Function Name Signature Date Function Name Signature Date
Approved N.H.Hieu 19/04/2010
Checked Grant Bearss 19/04/2010
Author N.N.Thang 19/04/2010
Date:
Document No.: NT2 – L4 – C – 21 – 310004 19/04/2010 Revision: A
NT2-L4-C-21-310004 Method Statement
Construction for Epoxy Coating before
Generator Erection
Nhon Trach 2 Combined Cycle Power
Plant
PetroVietnam Construction Joint Stock
Company

19 April 2010
Revision A
Nhon Trach 2 Combined Cycle Power Plant PetroVietnam Construction Joint Stock Company
NT2-L4-C-21-310004 Method Statement Construction

CONTENTS
1. MATERIAL

2. EQUIPMENT

3. CONSTRUCTION PROCEDURE

4. REFERENCE DOCUMENTS

Appendix 1: Date Sheet: Sikafloor 2420.


Appendix 2: Date Sheet: Sikafloor 2530W New

19 APRIL ⏐ REVISION A⏐ PAGE i


Nhon Trach 2 Combined Cycle Power Plant PetroVietnam Construction Joint Stock Company
NT2-L4-C-21-310004 Method Statement Construction

1. MATERIAL

1. Epoxy Sikafloor 2420: Universal Epoxy Primer /Sealer.


2. Epoxy Sikafloor 2530W New: Water Dispersed, Colored Floor Sealer

2. EQUIPMENT

Hammer, chisel, grinder, air compressor, painting roll, mixer,….

3. CONSTRUCTION PROCEDURE

1. Cleaning surface
2. Checking face moisture
3. Painting 01 layer Sikafloor 2420, norm 0.25kg/m2
4. After 03 ÷ 05 hours painting 02 layers Sikafloor 2530W New, rolling 1st layer is perpendicular with rolling
the 2nd layer. Norm 0.5kg/cm2 for 02 layers.
5. It is ready to use after 03 days.

4. REFERENCE DOCUMENTS

NT2 – L1 – C – 11/12UMB.64 – 631102 Gas Turbine Foundation (SGT5-4000F) – Plan View and Sections
NT2 – L1 – C – 10UMA.54 – 621101 Steam Turbine Foundation – Plan View of Steam Turbine Foundation

19 APRIL ⏐ REVISION A⏐ PAGE 1


Nhon Trach 2 Combined Cycle Power Plant PetroVietnam Construction Joint Stock Company
NT2-L4-C-21-310004 Method Statement Construction

Appendix 1

19 APRIL ⏐ REVISION A⏐ PAGE 2


Nhon Trach 2 Combined Cycle Power Plant PetroVietnam Construction Joint Stock Company
NT2-L4-C-21-310004 Method Statement Construction

Appendix 2

19 APRIL ⏐ REVISION A⏐ PAGE 3


Nhon Trach 2 Combined Cycle Power Plant PetroVietnam Construction Joint Stock Company
NT2-L4-C-21-310004 Method Statement Construction

19 APRIL ⏐ REVISION A⏐ PAGE 4