Professional Documents
Culture Documents
PROPOSED
GROUTED RIPRAP
(refer to cross-sections) slope -1.50% slope -1.50%
see TIE Bar Detail
3
1
slope % slope %
100mm (4 inches) THICK AGGREGATE SUB-BASE COURSE
200mm (8 inches) THICK PORTLAND
CEMENT CONCRETE PAVEMENT
slope e%
slope -e%
3
1
slope % slope %
SECTION OF PROP. PCCP, SUPER ELEVATION
SCALE NTS
SELECTED FILL
CUT SLOPE
SECTION OF PROP. PCCP W STONE SOIL CLASSIFICATION CUT SLOPE
MASONRY, GROUTED CANAL AND GROUTED RIPRAP COMMON EARTH 1H:3V
SOFT ROCK 1H:4V
SCALE 1:50
HARD ROCK 1H:6V ROUND SLOPE
PHASE II (CE) 1H:1V
ROUND SLOPE
HEIGHT OF CUT RADIUS
0 - 4.5m 1.5m
> 4.5m 2.5m
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: APPROVAL RECOMMENDED: APPROVED: CONCURRED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
JAMES BRYAN C. BOCLOG
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS · TYPICAL SECTON OF PROPOSED ENGINEER I
CORDILLERA ADMINISTRATIVE REGION CONCRETING OF BRGY. HUCAB FMR,
KIANGAN, IFUGAO ·
PCCP W/ PROPOSED STUCTURES
SECTION DETAIL OF WIDENING PREPARED: EDWARD P. MAGNO CAMERON P. ODSEY 9
IFUGAO FIRST DISTRICT ENGINEERING OFFICE JANICE MAE C. PULAO JAIME N. TOBOL ISAGANI C. CAYME
LAGAWE, IFUGAO WORKS JULIAN K. BACNOG, JR.
ENGINEER II DATE:
ENGINEER II
DATE:
CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER
DATE:
DATE:
OIC, DISTRICT ENGINEER OIC, REGIONAL EXECUTIVE DIRECTOR
DEPARTMENT OF AGRICULTURE-CAR
17
DATE:
75mm dia. PVC WEEPHOLES
SPACED STAGGERED @ 1.0M
VERTICAL and 2.0M HORIZONTAL
PCCP PCCP
(0.20m) (0.20m)
3
1
50mm x 50mm Concrete Key
16mmØ TIE BARS(deformed) @ 0.60m. O.C.
GROUTED CANAL DETAIL
SCALE 1:10M
ELEVATION DETAIL (GROUTED RIPRAP) SECTION DETAIL
SCALE 1:25 METERS SCALE 1:50 METERS TYPICAL TIE BAR DETAIL
SCALE NTS
12 12
5
5
N O T E:
75mm dia. PVC WEEPHOLES
SPACED STAGGERED @ 1.0M
VERTICAL and 2.0M HORIZONTAL 75mm dia. PVC WEEPHOLES COST OF FINE /MEDIUM GRAVEL, WEEPHOLES,
SPACED STAGGERED @ 1.0M
VERTICAL and 2.0M HORIZONTAL
SACK CLOTH ( BURLAP CLOTH ) USE FOR THE
WEEPHOLE SHALL BE CONSIDERED SUBSIDIARY
1 1 TO COMPLETION OF PAY ITEM WHERE IT IS
STONE MASONRY
24
24
USED.
SLOPE OF WEEPHOLE SHALL LEAVE A SLOPE
OF A 0.50%
ELEVATION DETAIL
SCALE 1:25 METERS SECTION DETAIL SECTION DETAIL
SCALE 1:25 METERS SCALE 1:25 METERS
NOTE:
EMBANKMENT WILL BE CONSTRUCTED ONLY ON A COMPUTED PRESSURE EXERTED BY COMPUTED PRESSURE EXERTED BY
75mm Ø UPVC
HEIGHT (m) SECTION (m) STRUCTURE (kPa) HEIGHT (m) SECTION (m) STRUCTURE (kPa)
FOUNDATION BED SATISFACTORY TO THE ENGINEER.
H h B b qmax qmin H h B b qmax qmin WEEP PIPES Fine Gravel
1.00 0.60 0.50 0.50 58.24 27.40 1.00 0.60 0.50 0.50 35.52 12.48 @ 2000 O.C.
THE MINIMUM THICKNESS/DIAMETER OF BOULDERS 1.50 0.60 0.80 0.50 66.17 25.10 1.50 0.60 0.80 0.50 41.08 22.12 16mm Ø - 15mm Ø
SHALL NOT BE LESS THAN 150mm. 2.00 0.60 1.00 0.50 70.28 28.70 2.00 0.60 1.00 0.50 50.47 30.93 Medium Gravel
2.50 0.60 1.20 0.50 73.28 35.28 2.50 0.60 1.20 0.50 102.10 2.62
25mm Ø - 39mm Ø
THE ALLOWABLE SOIL BEARING CAPACITY SHALL NOT 3.00 0.60 1.50 0.50 89.75 31.53 3.00 0.60 1.60 0.50 126.09 1.60
BE LESS THAN THE VALUES AS SHOWN ABOVE, WHICH IS A 3.50 0.60 1.70 0.50 110.91 24.74 3.50 0.60 2.00 0.50 144.83 5.25
VERY FIRM CLAY FOUNDATION BED. 4.00 0.60 2.00 0.50 150.67 6.28 4.00 0.60 2.30 0.50 169.18 2.99
4.50 0.60 2.20 0.50 136.71 25.86 4.50 0.60 2.60 0.50 191.15 2.99 Sack Cloth Tied at
SOIL BORING TEST MUST BE CONDUCTED DURING 5.00 0.60 2.50 0.50 142.50 32.99 5.00 0.60 2.90 0.50 213.02 2.98
5.50 0.60 2.80 0.50 148.77 39.72 5.50 0.60 3.20 0.50 232.60 5.20 the Inner End of Weephole
CONSTRUCTION TO VERIFY THE ACTUAL SOIL BEARING
CAPACITY. 6.00 0.60 3.00 0.50 163.95 38.46 6.00 0.60 3.40 0.50 260.35 -0.76
WEEPHOLE DETAIL
NOT TO SCALE
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: APPROVAL RECOMMENDED: APPROVED: CONCURRED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
JAMES BRYAN C. BOCLOG
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS · TYPICAL EMBANKMENT PROTECTION ENGINEER I
CORDILLERA ADMINISTRATIVE REGION CONCRETING OF BRGY. HUCAB FMR,
KIANGAN, IFUGAO ·
DETAIL (STONE MASONRY)
TYPICAL SECTION OF GROUTED RIPRAP, PREPARED: EDWARD P. MAGNO CAMERON P. ODSEY 10
IFUGAO FIRST DISTRICT ENGINEERING OFFICE JANICE MAE C. PULAO JAIME N. TOBOL ISAGANI C. CAYME
LAGAWE, IFUGAO
GROUTED CANAL AND WEEPHOLE JULIAN K. BACNOG, JR.
ENGINEER II DATE:
ENGINEER II
DATE:
CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER
DATE:
DATE:
OIC, DISTRICT ENGINEER OIC, REGIONAL EXECUTIVE DIRECTOR
DEPARTMENT OF AGRICULTURE-CAR
17
DATE:
Original Ground Line
ROADWAY LEVEL
Proposed Headwall
Stone Masonry 9pcs. - 12mm dia. Longitudinal
Proposed Flared - type Bars spaced as Shown
or Box - type Inlet
SLOPE VARIES%
12mm dia. Transverse Bars
spaced @ 0.30mtrs. O.C.
Proposed Apron
Proposed Apron (see detail)
(see detail)
ELEVATION OF HEADWALL
SCALE 1:50 MTRS.
TYPICAL DET. OF RCPC, HEADWALL, & INLET 12mm dia. Transverse Bars
SCALE 1:50 MTRS. spaced @ 0.30mtrs. O.C.
L
R IGINA
OF O R.C. APRON ELEVATION DETAIL
TOP ND
MATCH DITCH U
FINISHED GRO
LINE SCALE 1:20MTRS.
GRADE
5a
910 mm dia.
RCPC (Type IV)
10mm dia. BARS
t
600 inlet
10 mm dia. BARS @150mm E.W.
10 mm dia. BARS CONCRETE COLLAR DOUBLE BARREL C 350 450 450 540
@150 mm E.W.
B 3/2 145.50 159.50 172.50 198.50
910 mm dia. RCPC FOR VARIOUS 2/1 192 210.50 227.50 262.50
(Type IV) EMBANKMENT SLOPE
3/1 285 312.50 338.50 390.50
10 mm dia. BARS
4/1 378 415 450 518.50
@150 mm E.W.
GRAVEL BEDING G 3/2 279 307 333 385
DETAIL OF RCPC JOINTS FOR VARIOUS 2/1 372 409 443 513
TOP VIEW TRANSVERSE SECTION SECTION
SCALE 1:30 MTRS.
EMBANKMENT SLOPE
SHOWING RCPC SCALE 1:30 MTRS.
3/1 558 613 665 769
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: APPROVAL RECOMMENDED: APPROVED: CONCURRED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
JAMES BRYAN C. BOCLOG
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS · TYPICAL SECTION AND DETIALS ENGINEER I
CORDILLERA ADMINISTRATIVE REGION
IFUGAO FIRST DISTRICT ENGINEERING OFFICE
CONCRETING OF BRGY. HUCAB FMR,
KIANGAN, IFUGAO
OF RCPC
PREPARED: EDWARD P. MAGNO CAMERON P. ODSEY 11
JANICE MAE C. PULAO JAIME N. TOBOL ISAGANI C. CAYME
LAGAWE, IFUGAO JULIAN K. BACNOG, JR.
ENGINEER II DATE:
ENGINEER II
DATE:
CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER
DATE:
DATE:
OIC, DISTRICT ENGINEER OIC, REGIONAL EXECUTIVE DIRECTOR
DEPARTMENT OF AGRICULTURE-CAR
17
DATE:
SECTION II
BEG. OF FLARING
16mm Ø x 60cm TIE BARS
D
EDGE OF EXISTING CONC. PAVEMENT
SECTION I
PLAIN DOWEL BAR
300
1000
25mm Ø x 600 @ 300
C
O.C. (200mm) LANE SHOWING TRANSVERSE
300
CONSTRUCTION JOINT AT LOCATION
DEFORMED TIE BAR OF WEAKENED PLANE JOINT
300
300
16mm Ø x 600 @ 600
WIDTH AS SHOWN IN PLANS
A
O.C. (200mm)
300
300
TRANSVERSE CONSTRUCTION JOINT
F G
600
600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600
600
300 300 300 300
600
CONSTRUCTION JOINT AT MIDDLE
THIRD OF NORMAL JOINT INTERVAL 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600
600
VARIABLE
B NOTE:
E
THE EXISTING CONCRETE PAVEMENT SHALL
BE CHIPPED OFF PERPENDICULARLY TO THE
EXISTING BASE ABOUT 300mm WIDE TO A DIS- PLAN (SHOWING FLARING OF EXISTING CONC. PAVEMENT)
SCALE
TANCE WHERE THE FLARE IS LESS THAN 1000mm NOT TO
AND NECESSARY DOWEL BARS SHALL BE PROVIDED
TO CONNECT THE NEW PAVEMENT
4500 4500 1500 (MIN.)
WITH THE EXISTING PAVEMENT.
END OF APPROACH
LONGITUDINAL JOINT
END OF APPROACH
4500 4500 4500 4500 4500 4500
T
SLAB
SLAB
FIRST SLAB
SAWED JOINT SECTION I CONTACT JOINT
(2 LANE PAVING) (LONGITUDINAL JOINT) (HALF LANE PAVING)
DETAIL "A" SEE
SCALE 1:10 M
SEE
SCALE 1:10 M
DETAIL "C" DETAIL "E"
WIDTH
WIDTH
L/2
L/2
LANE
LANE
ROADWAY
ROADWAY
DEFORMED TIE BAR
ABUTMENT A
ABUTMENT B
16mm Ø X 600 SAWED GROOVE WITH POURED
L
C
C
L
L
@ 600 O.C. JOINT FILLER
WIDTH
WIDTH
LANE
LANE
6.0mm CONTRACTION JOINT CONSTRUCTION JOINT
SECTION II
L/2
L/2
5mm
50mm
(TRANSVERSE JOINT)
(minimum) SCALE 1:10 M
T/2
b b
b b
a a
T/2
25
NEW PAVEMENT
50mm
1/3T
2. CONSTRUCTION (CONTACT) JOINTS ARE FORMED WHEN CONCRETE ON ONE SIDE OF THE
150 JOINT IS POURED AHEAD AND ALLOWED TO SET BEFORE POURING ON THE OTHER SIDE.
45°
50 25
FIXED SLIDING
3. AT CONSTRUCTION JOINTS (LONGITUDINAL OR TRANSVERSE) CARE SHOULD BE TAKEN
11
DETAIL "F" THAT NO CONCRETE FROM THE LAST SLAB PLACED OVERHANGS ANY PORTION OF THE
DETAIL "C"
1/3T
SCALE 1:10 M
SCALE 1:10 M
150 FIRST SLAB.
4. THE BARS SHOULD BE DEFORMED STEEL BARS, ALL DOWEL BAR SHALL BE SMOOTH ROUND
11
PLAIN DOWEL BAR
20mm PREMOLDED STEEL BAR FREE FROM RUST AND OTHER DEFECTS WHICH MIGHT RESTRICT THEIR
25mm Ø x 600 @ 300 ONE HALF OF THE BAR ON THE SIDE OF
EXPANSION FILLER MOVEMENT.
1/3T
HALF OF THE LENGTH METAL DOWEL CAP SHALL BE PAINTED
SHALL BE PAINTED WITH APPROVED
ADDITIONAL 2000 2000 ADDITIONAL
WITH RED LEAD AND THEN GREASED 5. TYPE OF WEAKENED JOINT TO BE USED SHALL BE AS SPECIFIED IN THE PLANS AND ONLY
LANE LANE
RED LEAD AND ONE TYPE SHALL BE USED FOR THE WHOLE PROJECT.
FORMED GROOVE WITH
THEN GREASED
POURED JOINT FILLER
EXISTING PCCP 6. MATERIAL FOR THE METAL SIDE FORM SHALL BE BRAND NEW SHEET METAL GAUGE NO. 18
OF BLACK IRON FREE FROM RUST AND LINKS.
12mm DETAIL OF EXPANSION JOINT (DOWELED) AT METAL SIDE FORM
7. AT LEAST SIX (6) SUCCESSIVE DOWELLED BUTT JOINTS AT NORMAL JOINT SPACING SHALL
5mm
25mm
SEE DETAIL "F" SEE DETAIL "F" CERTAIN INTERSECTIONS AND STRUCTURES BE PROVIDE BEFORE OR AFTER AN EXPANSION JOINT.
SCALE 1:10 M 8. THE GROOVE OR CRACK ABOVE JOINTS (LONGITUDINAL OR TRANSVERSE) SHALL BE
25 SEALED WITH 30-50 PENETRATION ASPHALT SEAL OR COLD APPLIED LIQUID RUBBER
PAVEMENT WIDENING COMPOUND AFTER THE
FIRST SLAB ADDITIONAL LANE CONCRETE HAD BEEN CURED AND BEFORE OPENING PAVEMENT TO TRAFFIC.
9. ALL TRANSVERSE JOINTS, EXCEPT CONSTRUCTION JOINT, SHALL BE CONTINUOUS FROM
1/3T
SCALE 1:10 M
DETAIL "D" EDGE TO EDGE.
SCALE 1:10 M 10 ALL LONGITUDINAL JOINT SHALL MEET AT INTERSECTIONS WITH NO GAPS OR OFFSET.
11
FORMED GROOVE WITH KEYWAYS 11. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.
PLAIN DOWEL BAR FILL WITH HOT POURED JOINT FILLER FORMED GROOVE WITH KEYWAYS
12. AVOID STOPPAGE OF FORMWORKS ALONG CURVES.
1/3T
ROOFING NAIL
25mm Ø X 600 FORMED GROOVE WITH KEYWAYS FILL WITH HOT POURED JOINT FILLER OUTLINE OF CHIPPED OFF
@ 300 FILL WITH POURED JOINT FILLER
12
12 EXTG. CONCRETE PAVEMENT
@ 750mm O.C.
13. TRANSVERSE CONSTRUCTION (CONTACT) JOINT SHALL BE PROVIDE AT THE END OF ANY
RUN WHERE LAYING OF CONCRETE HAS BEEN STOPPED FOR THIRTY (30) MINUTES OR
11
5
25
12
1/Te 1/Te 1/3Te
25
LONGER.
5
25
1/3T
1/3T
NEW PAVEMENT
JOINTS WITH DOWELS. IF JOINT OCCURS IN THE MIDDLE THIRD OF THE WEAKENED JOINT
Tn
PAVEMENT EXISTING
1/3T 1/3T
PAVEMENT
INTERVAL (1500 - 3000mm) IT SHOULD BE KEYED JOINTS WITH THE BARS.
T
Tn-Te
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: APPROVAL RECOMMENDED: APPROVED: CONCURRED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
JAMES BRYAN C. BOCLOG
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS · TYPICAL SECTION AND DETAILS ENGINEER I
CORDILLERA ADMINISTRATIVE REGION
IFUGAO FIRST DISTRICT ENGINEERING OFFICE
CONCRETING OF BRGY. HUCAB FMR,
KIANGAN, IFUGAO
OF PCCP
PREPARED: EDWARD P. MAGNO CAMERON P. ODSEY 12
JANICE MAE C. PULAO JAIME N. TOBOL ISAGANI C. CAYME
LAGAWE, IFUGAO JULIAN K. BACNOG, JR.
ENGINEER II DATE:
ENGINEER II
DATE:
CHIEF, PLANNING & DESIGN SECTION
DATE:
ASSISTANT DISTRICT ENGINEER
DATE:
OIC, DISTRICT ENGINEER OIC, REGIONAL EXECUTIVE DIRECTOR
DEPARTMENT OF AGRICULTURE-CAR
17
DATE:
FORMULA :
PI T = R ( TAN I/2 )
I
Lc = ( π/180 )*I*R
D = 1145.916/R
E = T ( TAN I/4 )
E LEGEND :
T
PI - POINT OF HORIZONTAL INTERSECTION PI
I - EXTERNAL ANGLE
LC T - LENGTH OF TANGENT
R - HORIZONTAL RADIUS
Lc - LENGTH OF CIRCULAR CURVE
PT D - DEGREE OF CURVE (ARC DEFINITION)
PC
I PC- POINT OF CURVATURE
R R PT- POINT OF TANGENCY
E - EXTERNAL DISTANCE
LEGEND :
PVI - POINT OF VERTICAL INTERSECTION
PVI PVC - POINT OF VERTICAL CURVATURE
PVT - POINT OF VERTICAL TANGENCY
LVC, LVC1, LVC2 - LENGTH OF VERTICAL CURVES Lo Lo
g - GRADE IN PERCENT
-g% MO - MIDDLE ORDINATE
% Y X, X1, X2 - DISTANCE FROM PVC OR PVT TO ANY POINT ON CURVE
+g
Y, Y1, Y2 - VERTICAL OFFSET
A - ALGEBRAIC DIFFERENCE OF GRADES IN %
PVT
NOTE :
NO VERTICAL CURVE IS REQUIRED WHEN THE
PVC ALGEBRAIC DIFFERENCE IN GRADE IS LESS THAN O.5% Wn
IN ANY SYMMETRICAL VERTICAL PARABOLIC CURVE
MO = A*LVC / 800
Y = ( X²*MO ) / ( LVC/2 )²
LVC FORMULA :
LVC = KA
FORMULA :
LEGEND : Wn = WLn/Lo
A - ALGEBRAIC DIFFERENCE OF GRADIENTS (%)
SYMMETRICAL VERTICAL PARABOLIC CURVE
SCALE NTS K - RATE OF VERTICAL CURVATURE (m)
LEGEND :
W = WIDENING WIDTH
Lo = LENGTH OF SUPERELEVATION RUN-OFF
PVI
IN ANY UNSYMMETRICAL VERTICAL PARABOLIC CURVE Lw = LENGTH OF FULL WIDENING WIDTH
-g%
MO = ( LVC1*LVC2*A ) / 200LVC Ln = LENGTH FROM THE BEGINNING OF RUN-OFF
Y1 = MO ( X1 )² / ( LVC1 )²
WITH A WIDENING OF Wn
Y2 = MO ( X2 )² / ( LVC2 )²
+g
% PVT Wn = WIDENING OF LENGTH Ln
FORMULA :
LVC = KA
PVC LEGEND :
A - ALGEBRAIC DIFFERENCE OF GRADIENTS (%)
K - RATE OF VERTICAL CURVATURE (m)
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: APPROVAL RECOMMENDED: APPROVED: CONCURRED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
JAMES BRYAN C. BOCLOG
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS · GEOMETRIC DESIGN STANDARDS ENGINEER I
CORDILLERA ADMINISTRATIVE REGION
IFUGAO FIRST DISTRICT ENGINEERING OFFICE
CONCRETING OF BRGY. HUCAB FMR,
KIANGAN, IFUGAO
(HORIZONTAL AND VERTICAL)
PREPARED: EDWARD P. MAGNO CAMERON P. ODSEY 13
JANICE MAE C. PULAO JAIME N. TOBOL ISAGANI C. CAYME
LAGAWE, IFUGAO JULIAN K. BACNOG, JR.
ENGINEER II DATE:
ENGINEER II
DATE:
CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER
DATE:
DATE:
OIC, DISTRICT ENGINEER OIC, REGIONAL EXECUTIVE DIRECTOR
DEPARTMENT OF AGRICULTURE-CAR
17
DATE:
e2
x
2%
ma
ROADWAY ℄
2%
ma
e1
x
SUPERELEVATION RUN OFF (Lo1) SUPERELEVATION RUN OFF (Lo2)
1 2 2 1
3 Lo1 3 Lo1 3 Lo2 3 Lo2
R2
e2
2%
2%
ROADWAY ℄
ma
ma
x
x
4. WHEN THE SUPERELEVATION IS GREATER THAN 3% THEN THE SLOPE OF
SUPERELEVATION RUN OFF (Lo1) SUPERELEVATION RUN OFF (Lo2) LOWER SHOULDER SHALL BE THE SAME AS FOR THE TRAVELED WAY.
1 2 2 1
3 Lo1 3 Lo1 3 Lo2 3 Lo2
NOTE : IN MOUNTAINOUS SECTIONS AND AT BRIDGE APPROACHES THE DESIGN SPEED OF
5. WHEN THE SUPERELEVATION IS 4% OR LESSER, THEN THE LOWER SHOULDER
30 Km/h AND THE MAXIMUM SUPERELEVATION OF 4% INSTEAD OF 8% WILL BE
SHALL HAVE A SLOPE OF 3%.
ADOPTED WHEN NECESSARY.
ΔS ≥ 0.30 %
6. IF THE SUPERELEVATION IS 5%, THEN THE CROSS SLOPE OF THE HIGHER SHOULDER
% ΔS ≥ 0.30 IS 2%. BUT FOR A MAXIMUM SUPERELEVATION OF 8%, THE SLOPE OF THE HIGHER
we we
en=NORMAL CROSSFALL
ROADWAY ℄ SHOULDER WILL BE 1%.
we we
% ΔS ≥ 0.30
ΔS ≥ 0.30 % 7. SUPERELEVATION SHOWN ON THE PROFILE ARE BASED ON CONSTANT 6.70m.
PAVEMENT WIDTH AND NOT ON VARYING PAVEMENT WIDTH DUE TO WIDENING.
PT PC
ROADWAY ℄ 8. THE CROSS SLOPE OF SUBBASE IS ALWAYS FALLING IN THE SAME DIRECTION
AS THE ROADWAY.
R1 R2
9. ALGEBRAIC DIFFERENCE OF CROSSOVER SHOULD NOT EXCEED 7%.
TRANSITION : CIRCULAR CURVE-STRAIGHT-CIRCULAR CURVE CASE 2 10. FOR e>7% SHOULDERS SHOULD BE PAVED.
SCALE NTS
em
2%
e2
x
ROADWAY ℄
ma
ROADWAY ℄
ax
ma
e1
x
SUPERELEVATION RUN OFF (Lo) SUPERELEVATION RUN OFF (Lo1) SUPERELEVATION RUN OFF (Lo2)
2 1
3 Lo 3 Lo
L1
ΔS < 0.30%
% ΔS ≥ 0.30
0.30 % ΔS ≥ 0.30
%
ΔS = ΔS ≥ 0.30
% we we we
ROADWAY ℄ ROADWAY ℄
we we we
ΔS ≥ 0.30 % ΔS ≥ 0.30
% ΔS ≥ 0.30 %
PT
R1 PC
ROADWAY ℄ ROADWAY ℄
PC PT
R2
TRANSITION : STRAIGHT-CIRCULAR CURVE CASE 1 TRANSITION : CIRCULAR CURVE-MINIMUM STRAIGHT-CIRCULAR CURVE CASE 3
SCALE NTS SCALE NTS
SUPERELEVATION
SCALE NTS
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: APPROVAL RECOMMENDED: APPROVED: CONCURRED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
JAMES BRYAN C. BOCLOG
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS · GEOMETRIC DESIGN STANDARDS ENGINEER I
CORDILLERA ADMINISTRATIVE REGION
IFUGAO FIRST DISTRICT ENGINEERING OFFICE
CONCRETING OF BRGY. HUCAB FMR,
KIANGAN, IFUGAO
(SUPERELEVATION)
PREPARED: EDWARD P. MAGNO CAMERON P. ODSEY 14
JANICE MAE C. PULAO JAIME N. TOBOL ISAGANI C. CAYME
LAGAWE, IFUGAO JULIAN K. BACNOG, JR.
ENGINEER II DATE:
ENGINEER II
DATE:
CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER
DATE:
DATE:
OIC, DISTRICT ENGINEER OIC, REGIONAL EXECUTIVE DIRECTOR
DEPARTMENT OF AGRICULTURE-CAR
17
DATE:
ORIENTATION
BILLBOARD FRAME
SCALE NTS
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: APPROVAL RECOMMENDED: APPROVED: CONCURRED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
JAMES BRYAN C. BOCLOG
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS · DPWH STANDARDS PROJECT ENGINEER I
CORDILLERA ADMINISTRATIVE REGION
IFUGAO FIRST DISTRICT ENGINEERING OFFICE
CONCRETING OF BRGY. HUCAB FMR,
KIANGAN, IFUGAO
BILLBOARD
PREPARED: EDWARD P. MAGNO CAMERON P. ODSEY 15
JANICE MAE C. PULAO JAIME N. TOBOL ISAGANI C. CAYME
LAGAWE, IFUGAO JULIAN K. BACNOG, JR.
ENGINEER II DATE:
ENGINEER II
DATE:
CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER
DATE:
DATE:
OIC, DISTRICT ENGINEER OIC, REGIONAL EXECUTIVE DIRECTOR
DEPARTMENT OF AGRICULTURE-CAR
17
DATE:
BILLBOARD FRAME ORIENTATION
SCALE NTS
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: APPROVAL RECOMMENDED: APPROVED: CONCURRED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
JAMES BRYAN C. BOCLOG
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS · COA STANDARD PROJECT BILLBOARD ENGINEER I
CORDILLERA ADMINISTRATIVE REGION
IFUGAO FIRST DISTRICT ENGINEERING OFFICE
CONCRETING OF BRGY. HUCAB FMR,
KIANGAN, IFUGAO PREPARED: EDWARD P. MAGNO CAMERON P. ODSEY 16
JANICE MAE C. PULAO JAIME N. TOBOL ISAGANI C. CAYME
LAGAWE, IFUGAO JULIAN K. BACNOG, JR.
ENGINEER II DATE:
ENGINEER II
DATE:
CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER
DATE:
DATE:
OIC, DISTRICT ENGINEER OIC, REGIONAL EXECUTIVE DIRECTOR
DEPARTMENT OF AGRICULTURE-CAR
17
DATE:
YELLOW PAINTED POST
2019
F 2019 FMR
M LENGTH
F
M
R
D
P
F
M
R
D
P NGL NGL
TYPICAL DETAIL OF PROPOSED PCCP W/ FMR MARKER FRONT VIEW REAR VIEW SECTION
SCALE 1:75m.
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: APPROVAL RECOMMENDED: APPROVED: CONCURRED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
JAMES BRYAN C. BOCLOG
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS · DETAIL OF FARM TO ENGINEER I
CORDILLERA ADMINISTRATIVE REGION
IFUGAO FIRST DISTRICT ENGINEERING OFFICE
CONCRETING OF BRGY. HUCAB FMR,
KIANGAN, IFUGAO
MARKET ROAD MARKER
PREPARED: EDWARD P. MAGNO CAMERON P. ODSEY 17
JANICE MAE C. PULAO JAIME N. TOBOL ISAGANI C. CAYME
LAGAWE, IFUGAO JULIAN K. BACNOG, JR.
ENGINEER II DATE:
ENGINEER II
DATE:
CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER
DATE:
DATE:
OIC, DISTRICT ENGINEER OIC, REGIONAL EXECUTIVE DIRECTOR
DEPARTMENT OF AGRICULTURE-CAR
17
DATE: