Professional Documents
Culture Documents
NAME OF COMPANY
Introduction
The pupose of this Calculation is to design Retaining wall and check the adequecy of this retaining wall
Notations :
P= Wheel load
Calculation of pier Foundation
q=Surcharge load
Description
Ft:Footing thickness
A:Footing length
SSEM
plant Number
Designer Office
Design by: checked by : Approved by NAME OF COMPANY
Loads :
Description
H= 3.25 m
Ppw=Ce*Cq*Iw*Pw
Job No Contractor :
SSEM
plant Number
Designer Office
checked by : Approved by
NAME OF COMPANY
Vertical loads= 30.96 kN from the moment and vertical load steel can obtain by
PCACOL
NAME OF COMPANY
by:Approved
checked
Design by : by
Ix= 1.30 m4
Iy= 0.21 m4
NAME OF COMPANY
P 16 kips
x= 2 ft
Description
H= 8.36 ft
m=x/h 0.24
n=Z/H
0
Rev.# Date
m>0.4
1.77 P m n
2 2
2
H m n
2 23
0.40
0.35
m<0.4
0.28 P n 2
0.30
2
H 0.16 n
2 3
0.25
0.20
n= m= δ=
0.15
0 0.24 0.00
0.1 0.24 0.13 0.10
0.2 0.24 0.32
0.3 0.24 0.37 0.05
0.4 0.24 0.31
0.00
0.5 0.24 0.23
1.2 1 0.8 0.6 0.4 0.2 0
0.6 0.24 0.16 n=z/H
0.7 0.24 0.11
0.8 0.24 0.08
0.9 0.24 0.06
1 0.24 0.04
NAME OF COMPANY
Design by:
Rev.# Date
E199: Hakim:
F112: Hakim:
or 1.15
F168: Hakim:
300-75-dia/2