Professional Documents
Culture Documents
PROJECT : ss1
JOB NO :
DESIGNED BY : dong xi
DATE : 7-Sep-20
INPUT DATA
ASSUMPTIONS
Max.coefficient of lateral
earth pressure = 0.6
Min.coefficient of lateral
earth pressure = 0.2
(BASED ON BS5400:PART 2)
MATERIAL PROPERTIES
2
fcu = 30 N/mm
2
fy = 460 N/mm
::
documents.pub_single-box-culvert-structural-design-15m-x-15m 1
BOX CULVERT ANALYSIS
UNFACTORED LOAD
*Note:
Dispersion of wheel load is taken as 2:1 in soil (BS5400 :pt 2)
For depth of fill 6.0m > depth > 1.8m , consider 2 axles only
ANALYSIS OF BOX
(A) CASE 1 : For max.BM and shear on wall & max. hogging
BM at corners, consider max. lateral earth
pressure acting on the wall in empty
condition.
P1 ------> ! A where
! P1, P2 = earth pressure
!
!
P2 ------> ! B
2
P1 = 22.93 kN/m
2
P2 = 48.39 kN/m
2
Top slab pressure = 139.64 kN/m
2
Base pressure = 149.64 kN/m
::
Loading is symmetrical about the vertical centreline
of the box.
Joints A B
AD AB BA BC
DF 0.33 0.67 0.67 0.33
FEM -17.6 4.2 -4.8 18.9
4.5 9.0 -9.4 -4.7
-4.7 4.5
1.6 3.1 -3.0 -1.5
-1.5 1.6
0.5 1.0 -1.0 -0.5
-0.5 0.5
0.2 0.3 -0.3 -0.2
--------------------------------------------------------------------------------------------
-10.9 10.9 -12.0 12.0
--------------------------------------------------------------------------------------------
::
(B) CASE 2 : For max.sagging moment in the top & bottom
slab, consider min.lateral earth pressure
acting on the box.
2
P1 = 7.64 kN/m
2
P2 = 16.13 kN/m
documents.pub_single-box-culvert-structural-design-15m-x-15m 2
DESIGN MOMENT ENVELOPE
Hogging moment at bottom corners = 12.00 kNm/m 12.00
REINFORCEMENT DESIGN
Hogging Steel at Bottom Corners :
(i) Slab
K= 0.013216776 < 0.156
No comp.steel required.
Z= 171.41 > 165.3
As(req)= 181 mm2/m
(ii) wall
K= 0.013066158 < 0.156
No comp.steel required.
Z= 172.42 > 166.25
As(req)= 180 mm2/m
(ii) wall
K= 0.011860174 < 0.156
No comp.steel required.
Z= 172.66 > 166.25
2
As(req)= 164 mm /m
::
Sagging Steel at Top Slab :
K= 0.018649174 < 0.156
No comp.steel required.
Z= 170.32 > 165.3
2
As(req)= 256 mm /m
REINFORCEMENT PROVISION
(A) SUPPORT STEEL
(I) TOP SLAB
use Y 12 spacing 300 c/c
2
As (req) = 261 mm /m
2
As (prov) = 377 mm /m
(III) WALL
use Y 10 spacing 250 c/c
2
As (req) = 263 mm /m
2
As (prov) = 314 mm /m
documents.pub_single-box-culvert-structural-design-15m-x-15m 3
(B) MIDSPAN STEEL
(I) TOP SLAB
use Y 12 spacing 300 c/c
2
As (req) = 261 mm /m
2
As (prov) = 377 mm /m
::
(II) BOTTOM SLAB
use Y 12 spacing 300 c/c
2
As (req) = 269 mm /m
2
As (prov) = 377 mm /m
(III) WALL
use Y 10 spacing 250 c/c
2
As (req) = 263 mm /m
2
As (prov) = 314 mm /m
SHEAR CHECK
(i) Base
Shear = 22.75 kN
Shear stress v = 0.13 N/mm2
ps = 0.22 %
vc = 0.50 N/mm2 * Shear is OK.
(ii) Wall
Shear = 5.18 kN
Shear stress v = 0.03 N/mm2
ps = 0.18 %
vc = 0.47 N/mm2 * Shear is OK.
documents.pub_single-box-culvert-structural-design-15m-x-15m 4