1. DESIGN
Establish contributors
Assign daily demand
Calculate average daily flow (ADF)
Date:
Rev No. 05 Page: 1 of 3
October 2016
Determine working volume (TWl-BWL)
Set number of starts per hour (Min 2 and Max 6)
Volume = 0.9 x pumping rate (l/s) ÷ No of starts
Determine sump volume
Allow emergency storage above TWL (refer local
authority)
Allow submergence below BWL (refer pump
manufacture)
Sump volume = working volume + emergency volume +
submergence
Sump geometrics
TWL – BWL = 300mm – 400mm
Any benching at base on sump?
Controls
Have you set pump stop / start levels?
Have you set inlet / outlet and overflow levels?
1.4 Other
2. DRAWINGS
Date:
Rev No. 05 Page: 2 of 3
October 2016
Pump stop / start / alarm levels?
Trash screen or basket.
Electrical kiosk on plinth and duct seal detail
Float protector detail
Vent detail
Standpipe detail
Gravity inlet pipe and labels
Rising main and labels
Water main and labels
Pumpstation data
Average daily flow (ℓ/s)
Peak wet weather flow (ℓ/s)
Pumping rate (ℓ/s)
Emergency storage (hr)
Static head (m)
Dynamic head (m)