Certified Test, Adjust and Balance Report

Date of Issue: 12 December 2021 Name of Issuer Maged Mamdouh


System Name: Chilled Watter Reading By: Maged Mamdouh
Project Name: GIS
Project Location: ‫ﺍﻟﻌﺎﺻﻤﺔ ﺍﻹﺩﺍﺭﻳﺔ‬ Pages 4 of 5 Revision A
Date of Measure: 11 December 2021 System Served Area Basement 1
Form No. : QP-13-TB-03-F-01/1 Project No.: TAB -4166
Balancing Devices
Measuring instruments Hydronic Manometer Type of Balancing Device Flow Limitting Balancing Valve Self-Adjusting Cv System Designation Chilled Water

Design Flow Size O. Pressure (For Preliminary Flow Final Flow


Final ∆P % Final
No. Coil Designation Manufactiurer Model # Self B.v's only) H.W.P Comment
Kpa Flow
Kpa
GPM in GPM GPM
1 FCU-08 Oventrop VTR 3.80 3/4" N/A N/A N/A (1) (1) (1) (1)
2 FCU-08 Oventrop VTR 3.80 3/4" N/A N/A N/A (1) (1) (1) (1)
3 FCU-04 Crane D 931 1.90 3/4" N/A N/A N/A (1) (1) (1) (1)
4 FCU-08 Oventrop VTR 3.80 3/4" N/A 1.50 0.15 1.50 39% 7.0 (2)
5 FCU-08 Oventrop VTR 3.80 3/4" N/A 1.20 0.095 1.20 32% 7.0 (2)
6 FCU-12 Oventrop VTR 5.70 3/4" N/A 6.20 5.34 5.60 98% 4.0 -
7 FCU-10 Oventrop VTR 4.80 3/4" N/A 1.20 0.095 1.20 25% 7.0 (2)
8 FCU-06 Oventrop VTR 2.90 3/4" N/A N/A N/A (1) (1) (1) (1)
9 FCU-08 Crane D 931 3.80 1" N/A N/A N/A (3) (3) (3) (3)
10 FCU-08 Crane D 931 3.80 1" N/A N/A N/A (3) (3) (3) (3)

Note: Please refer to the engineering report for comments.


Reviewed and Acceptance by:
For Engineer Main Contractor HVAC Contractor TAB
Name
Date

Signature