TEST RECORD
NO. 01920-14-0598
THS Industria e Comercio Ltda. CLIENT
Rua Ernesto Biester, 59
CEP 04777-120 - Sao Paulo
BRAZIL

THS Industria e Comercio Ltda. MANUFACTURER

Low-voltage fuses TEST OBJECT

NH000 to NH5 TYPE

Test samples SERIAL NO.

Rated voltage 550 V AC RATED


CHARACTERISTICS
Rated current 100/160/250/400/600/630/ A
GIVEN BY THE CLIENT
1400/1600 A
Rated breaking current I1 120 kA

IEC 60269-2 Edition 5.0: 2013-07 NORMATIVE


DOCUMENT

Verification of breaking capacity I1 at 550 V TEST PERFORMED

28 November 2014 DATE OF TEST

See Sub-clause 3.6 TEST RESULT

This test document comprises 21 sheets.

S. GEORGIAS
Test engineer in charge
Berlin, 01 December 2014

This documentation shall not be reproduced in extracts without written approval by IPH GmbH.
The test results relate only to the object tested
Independent test laboratory accredited by the German Accreditation Body DAkkS, Deutsche Akkreditierungsstelle
GmbH, in the fields of high-voltage switchgear and their components, cables and conductors as well as
industrial low-voltage apparatus.
IPH Institut „Prüffeld für elektrische Hochleistungstechnik“ GmbH (IPH, Berlin) is a subsidiary of CESI S.p.A, Milan.
Nur zur vorläufigen Information
For preliminary information only
TEST RECORD NO. 2315.2120881 Sheet 2

Contents Sheet

1. Present at the test................................................................................................................................................................... 2


2. Test performed .......................................................................................................................................................................... 2
3. Verification of breaking capacity ................................................................................................................................ 3
3.1 Test laboratory ............................................................................................................................................................................................................................................. 3
3.2 Normative document ........................................................................................................................................................................................................................ 3
3.3 Required test parameters ............................................................................................................................................................................................................ 3
3.4 Test arrangement .................................................................................................................................................................................................................................... 3
3.5 Test and measuring circuits...................................................................................................................................................................................................... 4
3.6 Test results ......................................................................................................................................................................................................................................................... 5
4. Photos............................................................................................................................................................................................... 7
5. Oscillograms ................................................................................................................................................................................ 8
6. Drawings .....................................................................................................................................................................................19

1. Present at the test

Mr. Georgias IPH test engineer in charge

2. Test performed

Verification of breaking capacity I1 at 550 V


Nur zur vorläufigen Information
For preliminary information only
TEST RECORD NO. 2315.2120881 Sheet 3

3. Verification of breaking capacity

3.1 Test laboratory

High-power test laboratory, high-current test cell

3.2 Normative document

IEC 60269-2 Edition 5.0: 2013-07

3.3 Required test parameters

Test duty 1
Power-frequency recovery voltage 550 V
Prospective current 120 kA
Making angle after voltage zero Not applicable
Initiation of arcing after voltage zero 65 … 90° el.
Power factor cos ϕ 0,1 … 0,2
Test frequency 50 Hz

3.4 Test arrangement

According to IEC 60269-1 Edition 4.2: 2014-06


Nur zur vorläufigen Information
For preliminary information only
TEST RECORD NO. 2315.2120881 Sheet 4

3.5 Test and measuring circuits

Technical data of test circuits

Test requirement Verification of breaking capacity


Test No. 114 6158 to 114 6168
Number of phases (Test circuit) 2
Number of poles/phases (Test object) 1
Test frequency Hz 50
Power factor cos ϕ < 0.2
Grid Not earthed
Earthing conditions Short-circuit transformer Earthed
Short-circuit point --

MS MB L Tr I U

N 2

N Power supply (grid) Tr Short-circuit transformer


MS Master breaker I Current measurement
MB Making switch U Voltage measurement
L Current limiting reactor 1, 2 Measuring points

Figure 1: Test circuits

Technical data of measuring circuits

Measuring point Symbol Measured quantity Measuring sensor/device

1 i Current Shunt
2 u Voltage RC divider
Recording instrument: BE 256 transient recorder system
Nur zur vorläufigen Information
For preliminary information only
TEST RECORD NO. 2315.2120881 Sheet 5

3.6 Test results

Test requirement: Test duty I1


Condition of test object before test: New

Test No. 1146158 1146159 1146160 1146161 1146162 1146163


Size 000 00 0 1 2 3
Rated current of fuse-link A 100 160 160 250 400 600
Test voltage V 550 550 550 550 550 550
Prospective peak current kA 282 282 282 282 282 282
Prospective breaking current Ip kA 122 122 122 122 122 122
Power factor cos ϕ 0,15 0,15 0,15 0,15 0,15 0,15
Making angle o
el. 67,3 73,7 70,8 66,0 68,0 59,6
Initiation of arcing after voltage o
el. 76,7 78,5 75,8 75,5 81,9 81,1
zero
Melting current is kA 11,8 15,8 15,3 30,9 46,2 67,9
Cut-off current kA 12,5 16,3 15,7 31,6 46,9 69,1
Melting time ms 0,19 0,27 0,28 0,52 0,78 1,19
Arcing time ms 3,48 3,03 3,16 3,71 3,62 3,42
Operating time ms 3,66 3,30 3,44 4,23 4,39 4,61
Melting integral 103 A2s 9,85 22,2 19,7 167 558 1827
Arcing integral 103 A2s 25,4 52,9 53,0 396 1265 3463
3
Operating integral 10 A2s 35,2 75,1 72,7 564 1823 5291
Arcing energy kVAs 4,34 6,55 6,75 23,0 45,3 82,7
Peak switching voltage V 168,0 1268 1208 1208 1201 1257
Recovery voltage V 563 564 564 564 564 564
Note - - - - - 1)
Evaluation OK OK OK OK OK OK

Notes:
OK - The fuse is capable of correctly breaking the prospective current

1) Heat crack of the body


Nur zur vorläufigen Information
For preliminary information only
TEST RECORD NO. 2315.2120881 Sheet 6

Test requirement: Test duty I1


Condition of test object before test: New

Test No. 1146164 1146165 1146166 1146167 1146168


Size 3 5 5 5 5
Rated current of fuse-link A 630 1400 1400 1600 1600
Test voltage V 550 550 550 550 550
Prospective peak current kA 282 282 282 282 282
Prospective breaking current Ip kA 122 122 122 122 122
Power factor cos ϕ 0,15 0,15 0,15 0,15 0,15
Making angle o
el. 60,5 46,7 44,6 40,4 39,4
Initiation of arcing after voltage o
el. 81,6 82,8 69,6 80,2 68,6
zero
Melting current is kA 67,7 106 70,6 112 78,4
Cut-off current kA 68,9 107 75,1 112 82,6
Melting time ms 1,17 2,00 1,39 2,21 1,62
Arcing time ms 3,71 3,70 4,07 3,98 3,77
Operating time ms 4,88 5,70 5,46 6,19 5,39
3
Melting integral 10 As 2
1778 7246 2177 8686 3131
Arcing integral 103 As 2
3843 12488 8039 13263 9964
Operating integral 103 A2s 5620 19734 10216 21949 13095
Arcing energy kVAs 88,1 182,3 131,2 196,2 147,3
Peak switching voltage V 1218 1222 1169 1262 1198
Recovery voltage V 564 563 563 564 564
Note - - - - -
Evaluation OK OK OK OK OK

Notes:
OK - The fuse is capable of correctly breaking the prospective current
Nur zur vorläufigen Information
For preliminary information only
TEST RECORD NO. 2315.2120881 Sheet 7

4. Photos

Photo 1: Test samples after tests


Nur zur vorläufigen Information
For preliminary information only
TEST RECORD NO. 2315.2120881 Sheet 8

5. Oscillograms

Test No: 1146158


Nur zur vorläufigen Information
For preliminary information only
TEST RECORD NO. 2315.2120881 Sheet 9

Test No: 1146159


Nur zur vorläufigen Information
For preliminary information only
TEST RECORD NO. 2315.2120881 Sheet 10

Test No: 1146160


Nur zur vorläufigen Information
For preliminary information only
TEST RECORD NO. 2315.2120881 Sheet 11

Test No: 1146161


Nur zur vorläufigen Information
For preliminary information only
TEST RECORD NO. 2315.2120881 Sheet 12

Test No: 1146162


Nur zur vorläufigen Information
For preliminary information only
TEST RECORD NO. 2315.2120881 Sheet 13

Test No: 1146163


Nur zur vorläufigen Information
For preliminary information only
TEST RECORD NO. 2315.2120881 Sheet 14

Test No: 1146164


Nur zur vorläufigen Information
For preliminary information only
TEST RECORD NO. 2315.2120881 Sheet 15

Test No: 1146165


Nur zur vorläufigen Information
For preliminary information only
TEST RECORD NO. 2315.2120881 Sheet 16

Test No: 1146166


Nur zur vorläufigen Information
For preliminary information only
TEST RECORD NO. 2315.2120881 Sheet 17

Test No: 1146167


Nur zur vorläufigen Information
For preliminary information only
TEST RECORD NO. 2315.2120881 Sheet 18

Test No: 1146168


Nur zur vorläufigen Information
For preliminary information only
TEST RECORD NO. 2315.2120881 Sheet 19

6. Drawings
Nur zur vorläufigen Information
For preliminary information only
TEST RECORD NO. 2315.2120881 Sheet 20
Nur zur vorläufigen Information
For preliminary information only
TEST RECORD NO. 2315.2120881 Sheet 21

You might also like