ELECTRICAL SAFETY INSPECTION REPORT
A&A TRAVELLING GOODS BANGLADESH LTD
Address: Plot #44-46, Ishwardi Export Processing Zone, Pakshey, Pabna.
1. INTRODUCTION
The Factory was surveyed for electrical safety by RMG Sustainability Council. The
purpose of the survey was to identify significant electrical safety issues and to provide
recommendations for remediation based on applicable standards specified by the RSC.
2. LIMITATIONS
The information in this electrical safety inspection report was obtained during a visit to
the facility and during discussion with local factory management. Services performed by
the auditors are conducted in a manner consistent with that level of care and skill
generally exercised by members of the engineering and auditing profession. However,
an effort has made to discover all meaningful areas under the stipulated time available.
In evaluating subject site, Inspector relies in good faith on information provided by factory
management or employees. The Inspector assumes that the information provided is
factual, accurate and accepts no responsibility for any deficiency, misstatement or
inaccuracies contained in this report as a result of omission or misrepresentation of any
person interviewed or contacted.
The findings and recommendations in this report are not intended to imply, guarantee,
ensure or warrant compliance with any government regulations. Additionally, the results
do not imply in any way that compliance with the findings or recommendations as stated
in this report will eliminate all risks or exposures not referred to in this report do not exist.
Compliance with the findings and recommendations stated in this report does not relieve
the factory owner from obligation to comply with specific project requirements, industry
standards, or the provisions of any local government regulations.
3. DEFINITION
3. ID : 24146
4. Inspection participates : Kook Jin Cho
Managing Director
Email: jkj5005@anatgc.co.kr
Cell: +821098259417
Kazi Touhiduzzaman
Manager (HR & Admin)
Email: hr_a15@anatgc.co.kr
Cell: +8801712801059
A. General
A&A Travelling Goods Bangladesh Ltd is established in its 1 pre-fabricated production
buildings with 7 ancillary buildings of RCC construction (utility building, Security room,
Substation, Child care, Mosque and wastage store). As reported by the Factory
Management, the buildings were constructed in around August 2012 and completed
January 2013 and the production began in around March 2013. During the time of the
Inspection, the factory accommodated a total of 330 workers working in this factory.
Production Building:
Security Room:
Child Care:
Substation Building:
Wastage Store :
Toilet Block:
Mosque:
A&A Travelling Goods Bangladesh Ltd premise is connected to grid (BEPZA owned)
supply, which is the main source of power supply tapped from 11kV Over Head line and
delivered through High Tension cable. The 11kV supply is stepped down by 500 kVA,
11/0.415kV, 3 phase power transformer installed in substation room outside of the main
building. Electrical system and Utility installation information at a glance:
Inspecting teams were presented with the maintenance programs, logs and
maintenance schedule of the factory’s electrical facilities; Some typical practices are
shown below.
It is required to calculate risk index for all structures, design LPS as per standard and
install it properly.
RECOMMENDATION:
Draw as built electrical SLD mentioning all
required information by qualified engineer and
get it reviewed by RSC. Electrical SLD must
be updated properly when electrical system is
modified.
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
RECOMMENDATION:
Electrical safety training and awareness
program for the electrical personnel must be
initiated. It is a periodic task which factory has
to continue to improve the overall electrical
safety situation for the staffs.
PRIORITY: P2
REMEDIATION TIME FRAME: 1 MONTH
RECOMMENDATION:
An electrical maintenance program shall be
prepared which will include inspections and
testing of the electrical systems (preventive
and proactive)
PRIORITY: P3
REMEDIATION TIME FRAME: 1 MONTH
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
RECOMMENDATION:
Equipment earthing cable size must be
increased. The earth cable size shall be
determined according to BNBC or Adiabatic
method (if possible). Number of earth pits
shall be determined by the size of connected
earth cable.
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
RECOMMENDATION:
Workplace around transformer (or other
electrical installation) must be on same height.
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
RECOMMENDATION:
PRIORITY: P3
REMEDIATION TIME FRAME: 2 MONTHS
FINDING NO: E - 10
CATEGORY: CABLE & CABLE SUPPORTS
FINDING:
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
FINDING NO: E - 11
CATEGORY: CABLE RACEWAY & TRENCH
FINDING:
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
FINDING NO: E - 13
CATEGORY: DISTRIBUTION BOARD/PANEL
FINDING:
RECOMMENDATION:
All the MCCBs must be adjusted per
connected load current/connected cable; if
adjustment is not possible, replacement will
be the only way.
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
FINDING NO: E - 14
CATEGORY: DISTRIBUTION BOARD/PANEL
FINDING:
Panel/Distribution boxes are inaccessible or
cannot be opened to perform any
maintenance work.
RECOMMENDATION:
PRIORITY: P1
REMEDIATION TIME FRAME: 1 MONTH
RECOMMENDATION:
PRIORITY: P1
REMEDIATION TIME FRAME: 1 MONTH
FINDING NO: E - 16
CATEGORY: DISTRIBUTION BOARD/PANEL
FINDING:
Distribution Board's top/bottom is left open
(typical issue)
RECOMMENDATION:
Each electrical distribution board/panel must
be properly sealed to avoid ingression of fluffs;
but an adequate ventilation system must also
be ensured. Gland shall be used, where
required.
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
FINDING NO: E - 17
CATEGORY: DISTRIBUTION BOARD/PANEL
FINDING:
Multiple cables (came from different electrical
consumers) terminated at MCB
terminal/Busbar.
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
RECOMMENDATION:
No loop connection shall be used; each single
cable shall be terminated using cable lug
(flat/I) at each terminal. Combo bus bar may
be used (but incoming cable size must meet
the rated capacity)
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
FINDING NO: E - 19
CATEGORY: DISTRIBUTION BOARD/PANEL
FINDING:
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
FINDING NO: E - 20
CATEGORY: DOCUMENTATION
FINDING:
Instruction for CPR (Cardiopulmonary
Resuscitation) or Electrical shock restoration
is not present.
RECOMMENDATION:
PRIORITY: P3
REMEDIATION TIME FRAME: 1 MONTH
RECOMMENDATION:
Earth lead cable/ Earth Continuity Conductor
(ECC) shall be determined according to BNBC
or Adiabatic method (considering CB's
response time, fault current & type of earth
conductor other factors).
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
FINDING NO: E - 22
CATEGORY: WIRING SYSTEM
FINDING:
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS