Item No. Description Pricing Type Materials Labour Plant & Total Pricing
Equipment
3 Excavation of trench for pipelines; backfill, dewatering and reinstatement Lump Sum $ 2,000,000.00 $ 500,000.00 $ 1,792,100.00 $ 4,292,100.00
Subtotal $ 4,513,000.00
5.2 Giza Fayoum Trunkline Lump Sum $ 5,000.00 $ 50,000.00 $ 50,000.00 $ 105,000.00
6.2 Giza Fayoum Trunkline Lump Sum $ 30,000.00 $ 60,000.00 $ 90,000.00 $ 180,000.00
7.2 Giza Fayoum Trunkline Lump Sum $ 30,000.00 $ 60,000.00 $ 70,000.00 $ 160,000.00
8.2 Giza Fayoum Trunkline Lump Sum $ 50,000.00 $ 100,000.00 $ 100,000.00 $ 250,000.00
Subtotal
10.2 Giza Fayoum Trunkline Lump Sum $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 150,000.00
11.2 Giza Fayoum Trunkline Lump Sum $ 50,000.00 $ 100,000.00 $ 70,000.00 $ 220,000.00
12.2 Giza Fayoum Trunkline Lump Sum $ 8,000.00 $ 32,000.00 $ 8,000.00 $ 48,000.00
14 Demolish and Remove Pipeline Winch Pad (NOT PERFORMED) Lump Sum $ -
Subtotal $ -
Total Fixed Lump Sum Subcontract Price Lump Sum $ 3,019,200.00 $ 3,708,900.00 $ 5,018,900.00 $ 11,747,000.00
15.0 Changes
Subtotal $ 207,471.99
FORM A-1.1 FIXED LUMP SUM PRICES FOR MOBILISATION AND DEMOBILISATION
Construction
ALL LUMP SUM PRICES IN USD Materials Labour Plant & Total Pricing
Equipment
USD