CHETTINAD PRODUCTS AND SERVICES PRIVATE LIMITED

AKSHAYA TODAY WORK SITE


CEMENT - ESCALATION

Cement Total Cement Approved Amount on Basic Amount on Difference in


RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount

RAB 2 Ceiling Plastering CM 1:3, 10mm tk.


0.00
Tower B1 Sqm 0.117 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm 0.117 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm 0.117 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
Inner Wall Plastering CM 1:4 , 12mm tk. 0.00 0.00
0.00 0.00
Tower B1 Sqm 0.110 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm 0.110 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm 0.110 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
300mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 0.032 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm 0.032 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm 0.032 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
250mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 0.045 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm 0.045 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm 0.045 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
200mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 0.030 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm 11.03 0.030 0.33 210.94 69.00 210.94 69.00 -
Tower B3 Sqm 0.030 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
100mm AAC Block Work -Nito Bond Packing & Sill
0.00 0.00
Band Concrete
Tower B1 Sqm 0.033 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm 0.033 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm 0.033 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
200mm Solid Block work 0.00 0.00
Tower B1 Sqm 0.124 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm 0.124 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm 0.124 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
External Wall Plastering 12mm thick with CM 1:6,
and( second coat) top layer of 8mm thick of CM 0.00 0.00
1:3
0.00 0.00
Tower B1 Sqm 459.45 0.158 72.61 210.94 15317.00 210.94 15317.00 -
Tower B2 Sqm 201.79 0.158 31.89 210.94 6727.00 210.94 6727.00 -
Tower B3 Sqm 0.158 0.00 210.94 0.00 210.94 - -
0.00
Cement Concrete M-20 -grade 0.00
0.00
100mm Lintel 0.00
0.00
Tower B1 RM 0.138 0.00 210.94 0.00 210.94 0.00 -
Tower B2 RM 0.138 0.00 210.94 0.00 210.94 0.00 -
Tower B3 RM 0.138 0.00 210.94 0.00 210.94 0.00 -
0.00
200mm Lintel 0.00
0.00
Tower B1 RM 0.236 0.00 210.94 0.00 210.94 0.00 -

Page 1 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount

Tower B2 RM 0.236 0.00 210.94 0.00 210.94 0.00 -


Tower B3 RM 0.236 0.00 210.94 0.00 210.94 0.00 -
0.00
Kitchen Platform 0.00
0.00
Tower B1 Sqm 0.236 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm 0.236 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm 0.236 0.00 210.94 0.00 210.94 0.00 -
Toilet Water Proofing 0.00
Tower B1 Sqm 0.086 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm 0.086 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm 347.35 0.086 29.87 210.94 6301.00 210.94 6301.00 -
0.00
Terrace Water Proofing 0.00
Tower B1 Sqm 0.430 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm 0.430 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm 46.70 0.430 20.08 210.94 4236.00 210.94 4236.00 -
0.00
IPS Flooring 0.00
Tower B1 Sqm 0.301 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm 0.301 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm 0.301 0.00 210.94 0.00 210.94 0.00 -

Tiling- Vitrified,Ceramic Tile 0.00


Flooring,Kitchen Granite
Tower B1 Sqm 0.240 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm 13.47 0.240 3.23 210.94 682.00 210.94 682.00 -
Tower B3 Sqm - 0.240 0.00 210.94 0.00 210.94 0.00 -
Tiling- Vitrified Tile Skirting,Ceramic Tile 0.00
Skirting & Daddoing
Tower B1 Sqm 0.270 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm 0.270 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm - 0.270 0.00 210.94 0.00 210.94 0.00 -

Kotta Stone In Toilet Area 0.00


Tower B1 Sqm 0.240 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm 0.240 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm 0.240 0.00 210.94 0.00 210.94 0.00 -

Total Amount 280.42 59,151.00 59,151.00 -

Page 2 of 45
CHETTINAD PRODUCTS AND SERVICES PRIVATE LIMITED
AKSHAYA TODAY WORK SITE
RIVER SAND - ESCALATION

Amount on
RA Bill Sand Total Sand Approved Amount on Difference in
Description Unit Qty Approved Basic Rate
No Constant Consumption Rate Basic Rate Amount
Rate

RAB02 Ceiling Plastering CM 1:3, 10mm tk.

Tower B1 Sqm 0.430 0.00 105.00 0.00 42.86 0.00 0.00


Tower B2 Sqm 0.430 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.430 0.00 105.00 0.00 42.86 0.00 0.00
Toilet Water Proofing
Tower B1 Sqm 0.422 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.422 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.422 0.00 105.00 0.00 42.86 0.00 0.00
Terrace Water Proofing
Tower B1 Sqm 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 1.806 0.00 105.00 0.00 42.86 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
Total Amount 229.18 24,064.00 9,822.00 14,242.00

Page 3 of 45
CHETTINAD PRODUCTS AND SERVICES PRIVATE LIMITED
AKSHAYA TODAY WORK SITE
P.SAND - ESCALATION

RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount

RAB 02 Wall Plastering CM 1:4, 12mm tk.


M-Sand -Fine
Tower B1 Sqm 0.540 - 60.00 - 42.86 - 0.00
Tower B2 Sqm 0.540 - 60.00 - 42.86 - 0.00
Tower B3 Sqm 0.540 - 60.00 - 42.86 - 0.00

External Wall Plastering 12mm thick


with CM 1:6, and( second coat) top
layer of 8mm thick of CM 1:3

Tower B1 Sqm 459.45 0.854 392.14 60.00 23,528.00 42.86 16,806.00 6,722.00
Tower B2 Sqm 201.79 0.854 172.23 60.00 10,334.00 42.86 7,381.00 2,953.00
Tower B3 Sqm - 0.854 - 60.00 - 42.86 - -

IPS Flooring
Tower B1 Sqm 0.738 - 60.00 - 42.86 - -
Tower B2 Sqm 0.738 - 60.00 - 42.86 - -
Tower B3 Sqm 0.738 - 60.00 - 42.86 - -

Total Amount 876.93 52,616.00 37,582.00 15,034.00

Page 4 of 45
CHETTINAD PRODUCTS AND SERVICES PRIVATE LIMITED
AKSHAYA TODAY WORK SITE
M.SAND - ESCALATION

RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount

RAB 02 Cement Concrete M-20 -grade

100mm Lintel

Tower B1 RM 0.253 0.00 49.00 0.00 42.86 0.00 0.00


Tower B2 RM 0.253 0.00 49.00 0.00 42.86 0.00 0.00
Tower B3 RM 0.253 0.00 49.00 0.00 42.86 0.00 0.00

200mm Lintel

Tower B1 RM 0.434 0.00 49.00 0.00 42.86 0.00 0.00


Tower B2 RM 0.434 0.00 49.00 0.00 42.86 0.00 0.00
Tower B3 RM 0.434 0.00 49.00 0.00 42.86 0.00 0.00

Kitchen Platform

Tower B1 Sqm 0.434 0.00 49.00 0.00 42.86 0.00 0.00


Tower B2 Sqm 0.434 0.00 49.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.434 0.00 49.00 0.00 42.86 0.00 0.00
300mm AAC Block Work -Nito Bond
Packing
Tower B1 Sqm 0.080 0.00 49.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.080 0.00 49.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.080 0.00 49.00 0.00 42.86 0.00 -
0.00
250mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 0.110 0.00 49.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.110 0.00 49.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.110 0.00 49.00 0.00 42.86 0.00 -
0.00
200mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 0.073 0.00 49.00 0.00 42.86 0.00 -
Tower B2 Sqm 11.03 0.073 0.80 49.00 39.00 42.86 34.00 5.00
Tower B3 Sqm 0.073 0.00 49.00 0.00 42.86 0.00 -
0.00
100mm AAC Block Work -Nito Bond
0.00
Packing & Sill Band Concrete
Tower B1 Sqm 0.082 0.00 49.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.082 0.00 49.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.082 0.00 49.00 0.00 42.86 0.00 -
0.00
200mm Solid Block work 0.00
Tower B1 Sqm 0.910 0.00 49.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.910 0.00 49.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.910 0.00 49.00 0.00 42.86 0.00 -

Tiling- Vitrified,Ceramic Tile


Flooring
Tower B1 Sqm 0.00 1.177 0.00 49.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 13.47 1.177 15.85 49.00 777.00 42.86 679.00 98.00
Tower B3 Sqm 0.00 1.177 0.00 49.00 0.00 42.86 0.00 0.00
Tiling- Vitrified Tile
Skirting,Ceramic Tile Skirting & 0.00
Daddoing
Tower B1 Sqm 0.00 1.324 0.00 49.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.324 0.00 49.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.00 1.324 0.00 49.00 0.00 42.86 0.00 0.00

Kotta Stone In Toilet Area


Tower B1 Sqm 1.177 0.00 49.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 1.177 0.00 49.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 1.177 0.00 49.00 0.00 42.86 0.00 0.00

Total Amount 65.48 3,209.00 2,806.00 403.00

Page 5 of 45
CHETTINAD BUILDERS PVT LTD
AKSHAYA TODAY WORK SITE
CEMENT - ESCALATION

Cement Total Cement Approved Amount on Basic Amount on Difference in


RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount

RAB 1 Ceiling Plastering CM 1:3, 10mm tk. Sqm 3,912.50 0.117 457.76 265.63 121593.00 210.94 96559.00 25,034.00
0.00 0.00
Inner Wall Plastering CM 1:4 , 12mm tk. Sqm 834.30 0.110 91.77 265.63 24377.00 210.94 19358.00 5,019.00
0.00 0.00
Inner Wall Plastering CM 1:4 , 6mm tk. Sqm 834.30 0.00 0.00
0.00 0.00
300mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm - 0.032 0.00 265.63 0.00 210.94 0.00 -
Tower B2 Sqm - 0.032 0.00 265.63 0.00 210.94 0.00 -
Tower B3 Sqm 0.032 0.00 265.63 0.00 210.94 0.00 -
0.00 0.00
250mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 17.96 0.045 0.80 265.63 213.00 210.94 169.00 44.00
Tower B2 Sqm 36.66 0.045 1.64 265.63 435.00 210.94 346.00 89.00
Tower B3 Sqm 0.045 0.00 265.63 0.00 210.94 0.00 -
0.00 0.00
200mm AAC Block Work -Nito Bond Packing -Nito
0.00 0.00
Bond Packing
Tower B1 Sqm 192.52 0.030 5.70 265.63 1513.00 210.94 1202.00 311.00
Tower B2 Sqm 402.00 0.030 11.90 265.63 3160.00 210.94 2510.00 650.00
Tower B3 Sqm 0.030 0.00 265.63 0.00 210.94 0.00 -
0.00 0.00
100mm AAC Block Work -Nito Bond Packing & Sill
0.00 0.00
Band Concrete
Tower B1 Sqm 109.03 0.033 3.63 265.63 965.00 210.94 766.00 199.00
Tower B2 Sqm 225.93 0.033 7.53 265.63 2000.00 210.94 1588.00 412.00
Tower B3 Sqm 0.033 0.00 265.63 0.00 210.94 0.00 -
0.00 0.00
200mm Solid Block work 0.00 0.00
Tower B1 Sqm - 0.124 0.00 265.63 0.00 210.94 0.00 -
Tower B2 Sqm - 0.124 0.00 265.63 0.00 210.94 0.00 -
Tower B3 Sqm 0.124 0.00 265.63 0.00 210.94 0.00 -
0.00
RAB 2 Ceiling Plastering CM 1:3, 10mm tk. 0.00 0.00
0.00 0.00
Tower B1 Sqm 1,090.51 0.117 127.59 265.63 33891.00 210.94 26913.00 6,978.00
Tower B2 Sqm 2,859.63 0.117 334.58 265.63 88872.00 210.94 70575.00 18,297.00
Tower B3 Sqm 1,659.59 0.117 194.17 265.63 51577.00 210.94 40958.00 10,619.00
0.00 0.00
Inner Wall Plastering CM 1:4 , 12mm tk. 0.00 0.00
0.00 0.00
Tower B1 Sqm 2,258.37 0.110 248.42 265.63 65987.00 210.94 52401.00 13,586.00
Tower B2 Sqm 1,323.34 0.110 145.57 265.63 38666.00 210.94 30706.00 7,960.00
Tower B3 Sqm 2,963.17 0.110 325.95 265.63 86580.00 210.94 68755.00 17,825.00
0.00 0.00
300mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 2.74 0.032 0.09 265.63 24.00 210.94 19.00 5.00
Tower B2 Sqm 9.83 0.032 0.32 265.63 85.00 210.94 67.00 18.00
Tower B3 Sqm 0.032 0.00 265.63 0.00 210.94 0.00 -
0.00 0.00
250mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 71.50 0.045 3.20 265.63 849.00 210.94 674.00 175.00
Tower B2 Sqm 35.62 0.045 1.59 265.63 423.00 210.94 336.00 87.00
Tower B3 Sqm 0.045 0.00 265.63 0.00 210.94 0.00 -
0.00 0.00
200mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 1,156.46 0.030 34.23 265.63 9091.00 210.94 7220.00 1,871.00
Tower B2 Sqm 612.90 0.030 18.14 265.63 4818.00 210.94 3826.00 992.00
Tower B3 Sqm 0.030 0.00 265.63 0.00 210.94 0.00 -
0.00 0.00
100mm AAC Block Work -Nito Bond Packing & Sill
0.00 0.00
Band Concrete

Page 6 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount

Tower B1 Sqm 576.77 0.033 19.22 265.63 5105.00 210.94 4054.00 1,051.00
Tower B2 Sqm 361.96 0.033 12.06 265.63 3204.00 210.94 2544.00 660.00
Tower B3 Sqm 0.033 0.00 265.63 0.00 210.94 0.00 -
0.00 0.00
200mm Solid Block work 0.00 0.00
Tower B1 Sqm 35.00 0.124 4.34 265.63 1153.00 210.94 915.00 238.00
Tower B2 Sqm 56.50 0.124 7.01 265.63 1861.00 210.94 1478.00 383.00
Tower B3 Sqm 83.40 0.124 10.34 265.63 2747.00 210.94 2181.00 566.00
0.00 0.00
Cement Concrete M-20 -grade 0.00 0.00
0.00 0.00
100mm Lintel 0.00 0.00
0.00 0.00
Tower B1 RM 78.56 0.138 10.81 265.63 2870.00 210.94 2279.00 591.00
Tower B2 RM 53.04 0.138 7.30 265.63 1938.00 210.94 1539.00 399.00
Tower B3 RM - 0.138 0.00 265.63 0.00 210.94 0.00 -
0.00 0.00
200mm Lintel 0.00 0.00
0.00 0.00
Tower B1 RM 18.88 0.236 4.45 265.63 1183.00 210.94 939.00 244.00
Tower B2 RM 19.22 0.236 4.53 265.63 1204.00 210.94 956.00 248.00
Tower B3 RM 46.80 0.236 11.04 265.63 2931.00 210.94 2328.00 603.00
0.00 0.00
Kitchen Platform 0.00 0.00
0.00 0.00
Tower B1 Sqm 28.10 0.236 6.63 265.63 1760.00 210.94 1398.00 362.00
Tower B2 Sqm 18.74 0.236 4.42 265.63 1174.00 210.94 932.00 242.00
Tower B3 Sqm 281.04 0.236 66.27 265.63 17603.00 210.94 13979.00 3,624.00
0.00 0.00
RAB 3 Ceiling Plastering CM 1:3, 10mm tk. 0.00
0.00 0.00
Tower B1 Sqm 1,243.90 0.117 145.54 250.00 36384.00 210.94 30699.00 5,685.00
Tower B2 Sqm 1,391.24 0.117 162.78 250.00 40694.00 210.94 34335.00 6,359.00
Tower B3 Sqm 2,994.06 0.117 350.31 250.00 87576.00 210.94 73892.00 13,684.00
0.00 0.00
Inner Wall Plastering CM 1:4 , 12mm tk. 0.00 0.00
0.00 0.00
Tower B1 Sqm 981.75 0.110 107.99 250.00 26998.00 210.94 22780.00 4,218.00
Tower B2 Sqm 1,559.55 0.110 171.55 250.00 42888.00 210.94 36186.00 6,702.00
Tower B3 Sqm 1,534.92 0.110 168.84 250.00 42210.00 210.94 35615.00 6,595.00
0.00 0.00
300mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 7.64 0.032 0.25 250.00 62.00 210.94 52.00 10.00
Tower B2 Sqm 11.81 0.032 0.38 250.00 96.00 210.94 81.00 15.00
Tower B3 Sqm 0.032 0.00 250.00 0.00 210.94 0.00 -
0.00 0.00
250mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 93.36 0.045 4.17 250.00 1043.00 210.94 880.00 163.00
Tower B2 Sqm 133.80 0.045 5.98 250.00 1495.00 210.94 1261.00 234.00
Tower B3 Sqm 0.045 0.00 250.00 0.00 210.94 0.00 -
0.00 0.00
200mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 1,247.43 0.030 36.92 250.00 9230.00 210.94 7787.00 1,443.00
Tower B2 Sqm 2,156.03 0.030 63.81 250.00 15952.00 210.94 13460.00 2,492.00
Tower B3 Sqm 2.94 0.030 0.09 250.00 22.00 210.94 18.00 4.00
0.00 0.00
100mm AAC Block Work -Nito Bond Packing & Sill
0.00 0.00
Band Concrete
Tower B1 Sqm 701.76 0.033 23.38 250.00 5846.00 210.94 4933.00 913.00
Tower B2 Sqm 1,084.92 0.033 36.15 250.00 9038.00 210.94 7626.00 1,412.00
Tower B3 Sqm 57.95 0.033 1.93 250.00 483.00 210.94 407.00 76.00
0.00 0.00
200mm Solid Block work 0.00 0.00
Tower B1 Sqm 125.58 0.124 15.57 250.00 3893.00 210.94 3285.00 608.00

Page 7 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount

Tower B2 Sqm 55.58 0.124 6.89 250.00 1723.00 210.94 1454.00 269.00
Tower B3 Sqm 18.95 0.124 2.35 250.00 587.00 210.94 496.00 91.00
0.00 0.00
Cement Concrete M-20 -grade 0.00 0.00
0.00 0.00
100mm Lintel 0.00 0.00
0.00 0.00
Tower B1 RM 167.26 0.138 23.08 250.00 5770.00 210.94 4869.00 901.00
Tower B2 RM 215.20 0.138 29.70 250.00 7424.00 210.94 6264.00 1,160.00
Tower B3 RM - 0.138 0.00 250.00 0.00 210.94 0.00 -
0.00 0.00
200mm Lintel 0.00 0.00
0.00 0.00
Tower B1 RM 76.74 0.236 18.11 250.00 4528.00 210.94 3820.00 708.00
Tower B2 RM 70.36 0.236 16.60 250.00 4151.00 210.94 3503.00 648.00
Tower B3 RM 2.60 0.236 0.61 250.00 153.00 210.94 129.00 24.00
0.00 0.00
Kitchen Platform 0.00 0.00
0.00 0.00
Tower B1 Sqm 168.62 0.236 39.80 250.00 9949.00 210.94 8394.00 1,555.00
Tower B2 Sqm 65.10 0.236 15.36 250.00 3841.00 210.94 3241.00 600.00
Tower B3 Sqm 84.31 0.236 19.90 250.00 4974.00 210.94 4197.00 777.00
Toilet Water Proofing 0.00 0.00
Tower B1 Sqm 0.086 0.00 250.00 0.00 210.94 0.00 -
Tower B2 Sqm 0.086 0.00 250.00 0.00 210.94 0.00 -
Tower B3 Sqm 133.42 0.086 11.47 250.00 2869.00 210.94 2420.00 449.00
0.00 0.00
RAB 04 Ceiling Plastering CM 1:3, 10mm tk. 0.00
0.00 0.00
Tower B1 Sqm 3,010.25 0.117 352.20 242.19 85298.00 210.94 74292.00 11,006.00
Tower B2 Sqm 2,598.14 0.117 303.98 242.19 73621.00 210.94 64121.00 9,500.00
Tower B3 Sqm - 0.117 0.00 242.19 0.00 210.94 0.00 -
0.00 0.00
Inner Wall Plastering CM 1:4 , 12mm tk. 0.00 0.00
0.00 0.00
Tower B1 Sqm 3,402.68 0.110 374.29 242.19 90650.00 210.94 78953.00 11,697.00
Tower B2 Sqm 5,787.89 0.110 636.67 242.19 154193.00 210.94 134297.00 19,896.00
Tower B3 Sqm 8,032.19 0.110 883.54 242.19 213983.00 210.94 186372.00 27,611.00
0.00 0.00
300mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm - 0.032 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm 0.032 0.00 242.19 0.00 210.94 0.00 -
Tower B3 Sqm 0.032 0.00 242.19 0.00 210.94 0.00 -
0.00 0.00
250mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 0.045 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm 0.045 0.00 242.19 0.00 210.94 0.00 -
Tower B3 Sqm 0.045 0.00 242.19 0.00 210.94 0.00 -
0.00 0.00
200mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 108.63 0.030 3.21 242.19 779.00 210.94 678.00 101.00
Tower B2 Sqm 139.49 0.030 4.13 242.19 1000.00 210.94 871.00 129.00
Tower B3 Sqm 0.030 0.00 242.19 0.00 210.94 0.00 -
0.00 0.00
100mm AAC Block Work -Nito Bond Packing & Sill
0.00 0.00
Band Concrete
Tower B1 Sqm 5.44 0.033 0.18 242.19 44.00 210.94 38.00 6.00
Tower B2 Sqm 11.77 0.033 0.39 242.19 95.00 210.94 83.00 12.00
Tower B3 Sqm 0.033 0.00 242.19 0.00 210.94 0.00 -
0.00 0.00
200mm Solid Block work 0.00 0.00
Tower B1 Sqm 282.43 0.124 35.02 242.19 8482.00 210.94 7387.00 1,095.00
Tower B2 Sqm 46.45 0.124 5.76 242.19 1395.00 210.94 1215.00 180.00
Tower B3 Sqm 0.124 0.00 242.19 0.00 210.94 0.00 -

Page 8 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount

0.00 0.00
External Wall Plastering 12mm thick with CM 1:6,
and( second coat) top layer of 8mm thick of CM 0.00 0.00
1:3
0.00 0.00
Tower B1 Sqm - 0.158 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm - 0.158 0.00 242.19 0.00 210.94 0.00 -
Tower B3 Sqm 2,848.06 0.158 450.13 242.19 109016.00 210.94 94,949.00 14,067.00
0.00 0.00
Cement Concrete M-20 -grade 0.00 0.00
0.00 0.00
100mm Lintel 0.00 0.00
0.00 0.00
Tower B1 RM 58.58 0.138 8.08 242.19 1958.00 210.94 1705.00 253.00
Tower B2 RM 64.68 0.138 8.93 242.19 2162.00 210.94 1883.00 279.00
Tower B3 RM - 0.138 0.00 242.19 0.00 210.94 0.00 -
0.00 0.00
200mm Lintel 0.00 0.00
0.00 0.00
Tower B1 RM 23.40 0.236 5.52 242.19 1337.00 210.94 1165.00 172.00
Tower B2 RM 32.06 0.236 7.57 242.19 1832.00 210.94 1596.00 236.00
Tower B3 RM - 0.236 0.00 242.19 0.00 210.94 0.00 -
0.00 0.00
Kitchen Platform 0.00 0.00
0.00 0.00
Tower B1 Sqm - 0.236 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm 112.90 0.236 26.64 242.19 6453.00 210.94 5620.00 833.00
Tower B3 Sqm - 0.236 0.00 242.19 0.00 210.94 0.00 -
Toilet Water Proofing 0.00 0.00
Tower B1 Sqm 0.086 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm 141.76 0.086 12.19 242.19 2953.00 210.94 2572.00 381.00
Tower B3 Sqm 150.11 0.086 12.91 242.19 3127.00 210.94 2723.00 404.00
Tiling- Vitrified,Ceramic Tile Flooring 0.00 0.00
Tower B1 Sqm 0.240 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm 0.240 0.00 242.19 0.00 210.94 0.00 -
Tower B3 Sqm 58.52 0.240 14.04 242.19 3401.00 210.94 2963.00 438.00
Tiling- Vitrified Tile Skirting,Ceramic Tile 0.00 0.00
Skirting & Daddoing
Tower B1 Sqm 0.270 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm 0.270 0.00 242.19 0.00 210.94 0.00 -
Tower B3 Sqm 46.18 0.270 12.47 242.19 3020.00 210.94 2630.00 390.00
0.00 0.00
RAB 05 Ceiling Plastering CM 1:3, 10mm tk. 0.00
0.00 0.00
Tower B1 Sqm 1,611.17 0.117 188.51 226.56 42709.00 210.94 39763.00 2,946.00
Tower B2 Sqm 136.94 0.117 16.02 226.56 3630.00 210.94 3380.00 250.00
Tower B3 Sqm 346.99 0.117 40.60 226.56 9198.00 210.94 8564.00 634.00
0.00 0.00
Inner Wall Plastering CM 1:4 , 12mm tk. 0.00 0.00
0.00 0.00
Tower B1 Sqm 9,802.82 0.110 1078.31 226.56 244305.00 210.94 227456.00 16,849.00
Tower B2 Sqm 8,410.86 0.110 925.19 226.56 209614.00 210.94 195158.00 14,456.00
Tower B3 Sqm 6,967.94 0.110 766.47 226.56 173654.00 210.94 161678.00 11,976.00
0.00 0.00
300mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 0.43 0.032 0.01 226.56 3.00 210.94 3.00 -
Tower B2 Sqm 0.21 0.032 0.01 226.56 2.00 210.94 1.00 1.00
Tower B3 Sqm 0.032 0.00 226.56 0.00 210.94 0.00 -
0.00 0.00
250mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm - 0.045 0.00 226.56 0.00 210.94 0.00 -
Tower B2 Sqm 0.045 0.00 226.56 0.00 210.94 0.00 -
Tower B3 Sqm 0.045 0.00 226.56 0.00 210.94 0.00 -
0.00 0.00
200mm AAC Block Work -Nito Bond Packing 0.00 0.00

Page 9 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount

Tower B1 Sqm - 0.030 0.00 226.56 0.00 210.94 0.00 -


Tower B2 Sqm 0.030 0.00 226.56 0.00 210.94 0.00 -
Tower B3 Sqm 0.030 0.00 226.56 0.00 210.94 0.00 -
0.00 0.00
100mm AAC Block Work -Nito Bond Packing & Sill
0.00 0.00
Band Concrete
Tower B1 Sqm - 0.033 0.00 226.56 0.00 210.94 0.00 -
Tower B2 Sqm 0.24 0.033 0.01 226.56 2.00 210.94 2.00 -
Tower B3 Sqm 50.42 0.033 1.68 226.56 381.00 210.94 354.00 27.00
0.00 0.00
200mm Solid Block work 0.00 0.00
Tower B1 Sqm 17.50 0.124 2.17 226.56 492.00 210.94 458.00 34.00
Tower B2 Sqm - 0.124 0.00 226.56 0.00 210.94 0.00 -
Tower B3 Sqm 0.124 0.00 226.56 0.00 210.94 0.00 -
0.00 0.00
External Wall Plastering 12mm thick with CM 1:6,
and( second coat) top layer of 8mm thick of CM 0.00 0.00
1:3
0.00 0.00
Tower B1 Sqm - 0.158 0.00 226.56 0.00 210.94 0.00 -
Tower B2 Sqm - 0.158 0.00 226.56 0.00 210.94 0.00 -
Tower B3 Sqm 3,461.11 0.158 547.02 226.56 123935.00 210.94 115,387.00 8,548.00
0.00
Cement Concrete M-20 -grade 0.00
0.00
100mm Lintel 0.00
0.00
Tower B1 RM 2.70 0.138 0.37 226.56 84.00 210.94 79.00 5.00
Tower B2 RM 2.70 0.138 0.37 226.56 84.00 210.94 79.00 5.00
Tower B3 RM - 0.138 0.00 226.56 0.00 210.94 0.00 -
0.00
200mm Lintel 0.00
0.00
Tower B1 RM 11.05 0.236 2.61 226.56 591.00 210.94 550.00 41.00
Tower B2 RM 4.95 0.236 1.17 226.56 265.00 210.94 246.00 19.00
Tower B3 RM 2.40 0.236 0.57 226.56 128.00 210.94 119.00 9.00
0.00
Kitchen Platform 0.00
0.00
Tower B1 Sqm - 0.236 0.00 226.56 0.00 210.94 0.00 -
Tower B2 Sqm - 0.236 0.00 226.56 0.00 210.94 0.00 -
Tower B3 Sqm - 0.236 0.00 226.56 0.00 210.94 0.00 -
Toilet Water Proofing 0.00
Tower B1 Sqm 48.06 0.086 4.13 226.56 936.00 210.94 872.00 64.00
Tower B2 Sqm 176.16 0.086 15.15 226.56 3432.00 210.94 3196.00 236.00
Tower B3 Sqm 101.82 0.086 8.76 226.56 1984.00 210.94 1847.00 137.00
0.00
Terrace Water Proofing 0.00
Tower B1 Sqm - 0.00 226.56 0.00 210.94 0.00 -
Tower B2 Sqm - 0.00 226.56 0.00 210.94 0.00 -
Tower B3 Sqm 186.62 0.430 80.25 226.56 18181.00 210.94 16927.00 1,254.00
0.00
Tiling- Vitrified,Ceramic Tile Flooring 0.00
Tower B1 Sqm 0.240 0.00 226.56 0.00 210.94 0.00 -
Tower B2 Sqm 0.240 226.56 0.00 210.94 0.00 -
Tower B3 Sqm 68.52 0.240 16.45 226.56 3726.00 210.94 3469.00 257.00
Tiling- Vitrified Tile Skirting,Ceramic Tile 0.00
Skirting & Daddoing
Tower B1 Sqm - 0.270 0.00 226.56 0.00 210.94 0.00 -
Tower B2 Sqm 0.270 0.00 226.56 0.00 210.94 0.00 -
Tower B3 Sqm 184.84 0.270 49.91 226.56 11307.00 210.94 10527.00 780.00

RAB 06 Ceiling Plastering CM 1:3, 10mm tk. 0.00


0.00 0.00
Tower B1 Sqm 320.81 0.117 37.53 218.75 8211.00 210.94 7917.00 294.00

Page 10 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount

Tower B2 Sqm 76.12 0.117 8.91 218.75 1948.00 210.94 1879.00 69.00
Tower B3 Sqm 172.62 0.117 20.20 218.75 4418.00 210.94 4260.00 158.00
0.00 0.00
Inner Wall Plastering CM 1:4 , 12mm tk. 0.00 0.00
0.00 0.00
Tower B1 Sqm 2,084.47 0.110 229.29 218.75 50158.00 210.94 48366.00 1,792.00
Tower B2 Sqm 2,641.93 0.110 290.61 218.75 63571.00 210.94 61301.00 2,270.00
Tower B3 Sqm 1,766.88 0.110 194.36 218.75 42516.00 210.94 40997.00 1,519.00
0.00 0.00
300mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm (6.47) 0.032 -0.21 218.75 -46.00 210.94 -44.00 (2.00)
Tower B2 Sqm - 0.032 0.00 218.75 0.00 210.94 0.00 -
Tower B3 Sqm - 0.032 0.00 218.75 0.00 210.94 0.00 -
0.00 0.00
250mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm - 0.045 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm - 0.045 0.00 218.75 0.00 210.94 0.00 -
Tower B3 Sqm - 0.045 0.00 218.75 0.00 210.94 0.00 -
0.00 0.00
200mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm - 0.030 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm 14.25 0.030 0.42 218.75 92.00 210.94 89.00 3.00
Tower B3 Sqm - 0.030 0.00 218.75 0.00 210.94 0.00 -
0.00 0.00
100mm AAC Block Work -Nito Bond Packing & Sill
0.00 0.00
Band Concrete
Tower B1 Sqm - 0.033 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm 49.79 0.033 1.66 218.75 363.00 210.94 350.00 13.00
Tower B3 Sqm - 0.033 0.00 218.75 0.00 210.94 0.00 -
0.00 0.00
200mm Solid Block work 0.00 0.00
Tower B1 Sqm - 0.124 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm - 0.124 0.00 218.75 0.00 210.94 0.00 -
Tower B3 Sqm - 0.124 0.00 218.75 0.00 210.94 0.00 -
0.00 0.00
External Wall Plastering 12mm thick with CM 1:6,
and( second coat) top layer of 8mm thick of CM 0.00 0.00
1:3
0.00 0.00
Tower B1 Sqm 1,946.49 0.158 307.64 218.75 67296.00 210.94 64893.00 2,403.00
Tower B2 Sqm 922.08 0.158 145.73 218.75 31879.00 210.94 30741.00 1,138.00
Tower B3 Sqm 2,424.08 0.158 383.12 218.75 83808.00 210.94 80,815.00 2,993.00
0.00
Cement Concrete M-20 -grade 0.00
0.00
100mm Lintel 0.00
0.00
Tower B1 RM - 0.138 0.00 218.75 0.00 210.94 0.00 -
Tower B2 RM - 0.138 0.00 218.75 0.00 210.94 0.00 -
Tower B3 RM - 0.138 0.00 218.75 0.00 210.94 0.00 -
0.00
200mm Lintel 0.00
0.00
Tower B1 RM - 0.236 0.00 218.75 0.00 210.94 0.00 -
Tower B2 RM 3.25 0.236 0.77 218.75 168.00 210.94 162.00 6.00
Tower B3 RM - 0.236 0.00 218.75 0.00 210.94 0.00 -
0.00
Kitchen Platform 0.00
0.00
Tower B1 Sqm 4.92 0.236 1.16 218.75 254.00 210.94 245.00 9.00
Tower B2 Sqm 4.92 0.236 1.16 218.75 254.00 210.94 245.00 9.00
Tower B3 Sqm 9.37 0.236 2.21 218.75 484.00 210.94 466.00 18.00
Toilet Water Proofing 0.00
Tower B1 Sqm 394.64 0.086 33.94 218.75 7424.00 210.94 7159.00 265.00

Page 11 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount

Tower B2 Sqm 264.17 0.086 22.72 218.75 4970.00 210.94 4792.00 178.00
Tower B3 Sqm 52.13 0.086 4.48 218.75 981.00 210.94 946.00 35.00
0.00
Terrace Water Proofing 0.00
Tower B1 Sqm - 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm - 0.00 218.75 0.00 210.94 0.00 -
Tower B3 Sqm - 0.430 0.00 218.75 0.00 210.94 0.00 -
0.00
Tiling- Vitrified,Ceramic Tile Flooring 0.00
Tower B1 Sqm 191.79 0.240 46.03 218.75 10069.00 210.94 9709.00 360.00
Tower B2 Sqm 75.71 0.240 218.75 0.00 210.94 0.00 -
Tower B3 Sqm 189.07 0.240 45.38 218.75 9926.00 210.94 9572.00 354.00
Tiling- Vitrified Tile Skirting,Ceramic Tile 0.00
Skirting & Daddoing
Tower B1 Sqm 65.52 0.270 17.69 218.75 3870.00 210.94 3732.00 138.00
Tower B2 Sqm 152.17 0.270 41.09 218.75 8987.00 210.94 8667.00 320.00
Tower B3 Sqm 65.99 0.270 17.82 218.75 3897.00 210.94 3758.00 139.00

RAB 07 Ceiling Plastering CM 1:3, 10mm tk. 0.00


0.00 0.00
Tower B1 Sqm 113.97 0.117 13.33 242.19 3229.00 210.94 2813.00 416.00
Tower B2 Sqm 174.64 0.117 20.43 242.19 4949.00 210.94 4310.00 639.00
Tower B3 Sqm - 0.117 0.00 242.19 0.00 210.94 0.00 -
0.00 0.00
Inner Wall Plastering CM 1:4 , 12mm tk. 0.00 0.00
0.00 0.00
Tower B1 Sqm 1,258.10 0.110 138.39 242.19 33517.00 210.94 29192.00 4,325.00
Tower B2 Sqm 1,020.48 0.110 112.25 242.19 27186.00 210.94 23678.00 3,508.00
Tower B3 Sqm - 0.110 0.00 242.19 0.00 210.94 0.00 -
0.00 0.00
300mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm - 0.032 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm - 0.032 0.00 242.19 0.00 210.94 0.00 -
Tower B3 Sqm - 0.032 0.00 242.19 0.00 210.94 0.00 -
0.00 0.00
250mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm - 0.045 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm - 0.045 0.00 242.19 0.00 210.94 0.00 -
Tower B3 Sqm - 0.045 0.00 242.19 0.00 210.94 0.00 -
0.00 0.00
200mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 13.28 0.030 0.39 242.19 95.00 210.94 83.00 12.00
Tower B2 Sqm - 0.030 0.00 242.19 0.00 210.94 0.00 -
Tower B3 Sqm - 0.030 0.00 242.19 0.00 210.94 0.00 -
0.00 0.00
100mm AAC Block Work -Nito Bond Packing & Sill
0.00 0.00
Band Concrete
Tower B1 Sqm - 0.033 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm - 0.033 0.00 242.19 0.00 210.94 0.00 -
Tower B3 Sqm - 0.033 0.00 242.19 0.00 210.94 0.00 -
0.00 0.00
200mm Solid Block work 0.00 0.00
Tower B1 Sqm - 0.124 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm 35.01 0.124 4.34 242.19 1051.00 210.94 916.00 135.00
Tower B3 Sqm - 0.124 0.00 242.19 0.00 210.94 0.00 -
0.00 0.00
External Wall Plastering 12mm thick with CM 1:6,
and( second coat) top layer of 8mm thick of CM 0.00 0.00
1:3
0.00 0.00
Tower B1 Sqm 1,330.43 0.158 210.27 242.19 50925.00 210.94 44354.00 6,571.00
Tower B2 Sqm 2,774.12 0.158 438.44 242.19 106186.00 210.94 92484.00 13,702.00
Tower B3 Sqm 1,365.95 0.158 215.89 242.19 52285.00 210.94 45,538.00 6,747.00
0.00
Cement Concrete M-20 -grade 0.00

Page 12 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount

0.00
100mm Lintel 0.00
0.00
Tower B1 RM 2.02 0.138 0.28 242.19 68.00 210.94 59.00 9.00
Tower B2 RM - 0.138 0.00 242.19 0.00 210.94 0.00 -
Tower B3 RM - 0.138 0.00 242.19 0.00 210.94 0.00 -
0.00
200mm Lintel 0.00
0.00
Tower B1 RM - 0.236 0.00 242.19 0.00 210.94 0.00 -
Tower B2 RM - 0.236 0.00 242.19 0.00 210.94 0.00 -
Tower B3 RM - 0.236 0.00 242.19 0.00 210.94 0.00 -
0.00
Kitchen Platform 0.00
0.00
Tower B1 Sqm 2.64 0.236 0.62 242.19 151.00 210.94 131.00 20.00
Tower B2 Sqm - 0.236 0.00 242.19 0.00 210.94 0.00 -
Tower B3 Sqm - 0.236 0.00 242.19 0.00 210.94 0.00 -
Toilet Water Proofing 0.00
Tower B1 Sqm - 0.086 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm 64.82 0.086 5.57 242.19 1350.00 210.94 1176.00 174.00
Tower B3 Sqm 83.63 0.086 7.19 242.19 1742.00 210.94 1517.00 225.00
0.00
Terrace Water Proofing 0.00
Tower B1 Sqm - 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm - 0.00 242.19 0.00 210.94 0.00 -
Tower B3 Sqm - 0.430 0.00 242.19 0.00 210.94 0.00 -
0.00
Tiling- Vitrified,Ceramic Tile Flooring 0.00
Tower B1 Sqm - 0.240 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm 68.25 0.240 242.19 0.00 210.94 0.00 -
Tower B3 Sqm 211.72 0.240 50.81 242.19 12306.00 210.94 10718.00 1,588.00
Tiling- Vitrified Tile Skirting,Ceramic Tile 0.00
Skirting & Daddoing
Tower B1 Sqm - 0.270 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm 0.90 0.270 0.24 242.19 59.00 210.94 51.00 8.00
Tower B3 Sqm 139.51 0.270 37.67 242.19 9123.00 210.94 7946.00 1,177.00

RAB 08 Ceiling Plastering CM 1:3, 10mm tk.


0.00
Tower B1 Sqm (0.00) 0.117 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm - 0.117 0.00 218.75 0.00 210.94 0.00 -
Tower B3 Sqm 106.56 0.117 12.47 218.75 2727.00 210.94 2630.00 97.00
0.00 0.00
Inner Wall Plastering CM 1:4 , 12mm tk. 0.00 0.00
0.00 0.00
Tower B1 Sqm 383.00 0.110 42.13 218.75 9216.00 210.94 8887.00 329.00
Tower B2 Sqm 1,141.94 0.110 125.61 218.75 27478.00 210.94 26496.00 982.00
Tower B3 Sqm 673.65 0.110 74.10 218.75 16210.00 210.94 15631.00 579.00
0.00 0.00
300mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 6.39 0.032 0.21 218.75 45.00 210.94 44.00 1.00
Tower B2 Sqm 6.28 0.032 0.20 218.75 45.00 210.94 43.00 2.00
Tower B3 Sqm - 0.032 0.00 218.75 0.00 210.94 0.00 -
0.00 0.00
250mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm - 0.045 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm - 0.045 0.00 218.75 0.00 210.94 0.00 -
Tower B3 Sqm - 0.045 0.00 218.75 0.00 210.94 0.00 -
0.00 0.00
200mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 3.85 0.030 0.11 218.75 25.00 210.94 24.00 1.00
Tower B2 Sqm 43.08 0.030 1.27 218.75 279.00 210.94 269.00 10.00
Tower B3 Sqm 144.30 0.030 4.27 218.75 934.00 210.94 901.00 33.00

Page 13 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount

0.00 0.00
100mm AAC Block Work -Nito Bond Packing & Sill
0.00 0.00
Band Concrete
Tower B1 Sqm 264.67 0.033 8.82 218.75 1929.00 210.94 1860.00 69.00
Tower B2 Sqm 347.13 0.033 11.57 218.75 2530.00 210.94 2440.00 90.00
Tower B3 Sqm 595.59 0.033 19.85 218.75 4341.00 210.94 4186.00 155.00
0.00 0.00
200mm Solid Block work 0.00 0.00
Tower B1 Sqm - 0.124 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm 44.40 0.124 5.51 218.75 1204.00 210.94 1161.00 43.00
Tower B3 Sqm 20.73 0.124 2.57 218.75 562.00 210.94 542.00 20.00
0.00 0.00
External Wall Plastering 12mm thick with CM 1:6,
and( second coat) top layer of 8mm thick of CM 0.00 0.00
1:3
0.00 0.00
Tower B1 Sqm 236.91 0.158 37.44 218.75 8191.00 210.94 7898.00 293.00
Tower B2 Sqm 1,813.05 0.158 286.55 218.75 62683.00 210.94 60444.00 2,239.00
Tower B3 Sqm 603.08 0.158 95.32 218.75 20850.00 210.94 20,106.00 744.00
0.00
Cement Concrete M-20 -grade 0.00
0.00
100mm Lintel 0.00
0.00
Tower B1 RM - 0.138 0.00 218.75 0.00 210.94 0.00 -
Tower B2 RM - 0.138 0.00 218.75 0.00 210.94 0.00 -
Tower B3 RM 6.22 0.138 0.86 218.75 188.00 210.94 181.00 7.00
0.00
200mm Lintel 0.00
0.00
Tower B1 RM - 0.236 0.00 218.75 0.00 210.94 0.00 -
Tower B2 RM - 0.236 0.00 218.75 0.00 210.94 0.00 -
Tower B3 RM 4.10 0.236 0.97 218.75 212.00 210.94 204.00 8.00
0.00
Kitchen Platform 0.00
0.00
Tower B1 Sqm - 0.236 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm - 0.236 0.00 218.75 0.00 210.94 0.00 -
Tower B3 Sqm 4.44 0.236 1.05 218.75 229.00 210.94 221.00 8.00
Toilet Water Proofing 0.00
Tower B1 Sqm 0.086 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm 0.086 0.00 218.75 0.00 210.94 0.00 -
Tower B3 Sqm 555.38 0.086 47.76 218.75 10448.00 210.94 10075.00 373.00
0.00
Terrace Water Proofing 0.00
Tower B1 Sqm 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm 0.00 218.75 0.00 210.94 0.00 -
Tower B3 Sqm 0.430 0.00 218.75 0.00 210.94 0.00 -
0.00
Tiling- Vitrified,Ceramic Tile 0.00
Flooring,Kitchen Granite
Tower B1 Sqm 0.240 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm 78.06 0.240 218.75 0.00 210.94 0.00 -
Tower B3 Sqm 34.96 0.240 8.39 218.75 1835.00 210.94 1770.00 65.00
Tiling- Vitrified Tile Skirting,Ceramic Tile 0.00
Skirting & Daddoing
Tower B1 Sqm 0.270 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm 4.64 0.270 1.25 218.75 274.00 210.94 264.00 10.00
Tower B3 Sqm 12.03 0.270 3.25 218.75 711.00 210.94 685.00 26.00

RAB 09 Ceiling Plastering CM 1:3, 10mm tk.


0.00
Tower B1 Sqm - 0.117 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm 267.42 0.117 31.29 218.75 6844.00 210.94 6600.00 244.00
Tower B3 Sqm 32.29 0.117 3.78 218.75 826.00 210.94 797.00 29.00
0.00 0.00

Page 14 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount

Inner Wall Plastering CM 1:4 , 12mm tk. 0.00 0.00


0.00 0.00
Tower B1 Sqm - 0.110 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm 333.57 0.110 36.69 218.75 8027.00 210.94 7740.00 287.00
Tower B3 Sqm 187.61 0.110 20.64 218.75 4514.00 210.94 4353.00 161.00
0.00 0.00
300mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm - 0.032 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm - 0.032 0.00 218.75 0.00 210.94 0.00 -
Tower B3 Sqm - 0.032 0.00 218.75 0.00 210.94 0.00 -
0.00 0.00
250mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm - 0.045 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm - 0.045 0.00 218.75 0.00 210.94 0.00 -
Tower B3 Sqm 0.045 0.00 218.75 0.00 210.94 0.00 -
0.00 0.00
200mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm - 0.030 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm 67.41 0.030 2.00 218.75 436.00 210.94 421.00 15.00
Tower B3 Sqm - 0.030 0.00 218.75 0.00 210.94 0.00 -
0.00 0.00
100mm AAC Block Work -Nito Bond Packing & Sill
0.00 0.00
Band Concrete
Tower B1 Sqm - 0.033 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm 40.30 0.033 1.34 218.75 294.00 210.94 283.00 11.00
Tower B3 Sqm - 0.033 0.00 218.75 0.00 210.94 0.00 -
0.00 0.00
200mm Solid Block work 0.00 0.00
Tower B1 Sqm - 0.124 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm - 0.124 0.00 218.75 0.00 210.94 0.00 -
Tower B3 Sqm - 0.124 0.00 218.75 0.00 210.94 0.00 -
0.00 0.00
External Wall Plastering 12mm thick with CM 1:6,
and( second coat) top layer of 8mm thick of CM 0.00 0.00
1:3
0.00 0.00
Tower B1 Sqm - 0.158 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm 1,201.68 0.158 189.92 218.75 41546.00 210.94 40062.00 1,484.00
Tower B3 Sqm - 0.158 0.00 218.75 0.00 210.94 - -
0.00
Cement Concrete M-20 -grade 0.00
0.00
100mm Lintel 0.00
0.00
Tower B1 RM - 0.138 0.00 218.75 0.00 210.94 0.00 -
Tower B2 RM - 0.138 0.00 218.75 0.00 210.94 0.00 -
Tower B3 RM - 0.138 0.00 218.75 0.00 210.94 0.00 -
0.00
200mm Lintel 0.00
0.00
Tower B1 RM - 0.236 0.00 218.75 0.00 210.94 0.00 -
Tower B2 RM 0.64 0.236 0.15 218.75 33.00 210.94 32.00 1.00
Tower B3 RM - 0.236 0.00 218.75 0.00 210.94 0.00 -
0.00
Kitchen Platform 0.00
0.00
Tower B1 Sqm - 0.236 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm - 0.236 0.00 218.75 0.00 210.94 0.00 -
Tower B3 Sqm - 0.236 0.00 218.75 0.00 210.94 0.00 -
Toilet Water Proofing 0.00
Tower B1 Sqm - 0.086 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm 98.07 0.086 8.43 218.75 1845.00 210.94 1779.00 66.00
Tower B3 Sqm - 0.086 0.00 218.75 0.00 210.94 0.00 -
0.00

Page 15 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount

Terrace Water Proofing 0.00


Tower B1 Sqm - 0.430 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm - 0.430 0.00 218.75 0.00 210.94 0.00 -
Tower B3 Sqm - 0.430 0.00 218.75 0.00 210.94 0.00 -
0.00
Tiling- Vitrified,Ceramic Tile 0.00
Flooring,Kitchen Granite
Tower B1 Sqm - 0.240 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm - 0.240 218.75 0.00 210.94 0.00 -
Tower B3 Sqm 65.84 0.240 15.80 218.75 3457.00 210.94 3333.00 124.00
Tiling- Vitrified Tile Skirting,Ceramic Tile 0.00
Skirting & Daddoing
Tower B1 Sqm - 0.270 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm 18.08 0.270 4.88 218.75 1068.00 210.94 1030.00 38.00
Tower B3 Sqm 5.12 0.270 1.38 218.75 302.00 210.94 292.00 10.00

RAB 10 Ceiling Plastering CM 1:3, 10mm tk.


0.00
Tower B1 Sqm - 0.117 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.117 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm - 0.117 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
Inner Wall Plastering CM 1:4 , 12mm tk. 0.00 0.00
0.00 0.00
Tower B1 Sqm - 0.110 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm 382.21 0.110 42.04 210.94 8869.00 210.94 8869.00 -
Tower B3 Sqm - 0.110 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
300mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm - 0.032 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.032 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm 0.032 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
250mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm - 0.045 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.045 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm 0.045 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
200mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm - 0.030 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.030 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm - 0.030 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
100mm AAC Block Work -Nito Bond Packing & Sill
0.00 0.00
Band Concrete
Tower B1 Sqm - 0.033 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.033 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm - 0.033 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
200mm Solid Block work 0.00 0.00
Tower B1 Sqm - 0.124 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.124 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm - 0.124 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
External Wall Plastering 12mm thick with CM 1:6,
and( second coat) top layer of 8mm thick of CM 0.00 0.00
1:3
0.00 0.00
Tower B1 Sqm - 0.158 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm 1,253.12 0.158 198.05 210.94 41777.00 210.94 41777.00 -
Tower B3 Sqm - 0.158 0.00 210.94 0.00 210.94 - -
0.00
Cement Concrete M-20 -grade 0.00
0.00
100mm Lintel 0.00
0.00

Page 16 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount

Tower B1 RM - 0.138 0.00 210.94 0.00 210.94 0.00 -


Tower B2 RM - 0.138 0.00 210.94 0.00 210.94 0.00 -
Tower B3 RM - 0.138 0.00 210.94 0.00 210.94 0.00 -
0.00
200mm Lintel 0.00
0.00
Tower B1 RM - 0.236 0.00 210.94 0.00 210.94 0.00 -
Tower B2 RM - 0.236 0.00 210.94 0.00 210.94 0.00 -
Tower B3 RM - 0.236 0.00 210.94 0.00 210.94 0.00 -
0.00
Kitchen Platform 0.00
0.00
Tower B1 Sqm - 0.236 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.236 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm - 0.236 0.00 210.94 0.00 210.94 0.00 -
Toilet Water Proofing 0.00
Tower B1 Sqm - 0.086 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm 96.99 0.086 8.34 210.94 1759.00 210.94 1759.00 -
Tower B3 Sqm 13.67 0.086 1.18 210.94 248.00 210.94 248.00 -
0.00
Terrace Water Proofing 0.00
Tower B1 Sqm - 0.430 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.430 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm 148.06 0.430 63.66 210.94 13429.00 210.94 13429.00 -
0.00
IPS Flooring 0.00
Tower B1 Sqm 0.301 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm 0.301 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm 38.92 0.301 11.71 210.94 2471.00 210.94 2471.00 -

Tiling- Vitrified,Ceramic Tile 0.00


Flooring,Kitchen Granite
Tower B1 Sqm - 0.240 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.240 210.94 0.00 210.94 0.00 -
Tower B3 Sqm 98.26 0.240 23.58 210.94 4975.00 210.94 4975.00 -
Tiling- Vitrified Tile Skirting,Ceramic Tile 0.00
Skirting & Daddoing
Tower B1 Sqm - 0.270 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.270 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm 65.81 0.270 17.77 210.94 3748.00 210.94 3748.00 -

RAB 11 Ceiling Plastering CM 1:3, 10mm tk.


0.00
Tower B1 Sqm 86.31 0.117 10.10 210.94 2130.00 210.94 2130.00 -
Tower B2 Sqm - 0.117 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm - 0.117 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
Inner Wall Plastering CM 1:4 , 12mm tk. 0.00 0.00
0.00 0.00
Tower B1 Sqm - 0.110 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm 131.25 0.110 14.44 210.94 3045.00 210.94 3045.00 -
Tower B3 Sqm - 0.110 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
300mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm - 0.032 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.032 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm - 0.032 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
250mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm - 0.045 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.045 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm - 0.045 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
200mm AAC Block Work -Nito Bond Packing 0.00 0.00

Page 17 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount

Tower B1 Sqm - 0.030 0.00 210.94 0.00 210.94 0.00 -


Tower B2 Sqm - 0.030 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm - 0.030 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
100mm AAC Block Work -Nito Bond Packing & Sill
0.00 0.00
Band Concrete
Tower B1 Sqm - 0.033 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.033 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm - 0.033 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
200mm Solid Block work 0.00 0.00
Tower B1 Sqm - 0.124 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.124 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm - 0.124 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
External Wall Plastering 12mm thick with CM 1:6,
and( second coat) top layer of 8mm thick of CM 0.00 0.00
1:3
0.00 0.00
Tower B1 Sqm - 0.158 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm 449.90 0.158 71.11 210.94 14999.00 210.94 14999.00 -
Tower B3 Sqm - 0.158 0.00 210.94 0.00 210.94 - -
0.00
Cement Concrete M-20 -grade 0.00
0.00
100mm Lintel 0.00
0.00
Tower B1 RM - 0.138 0.00 210.94 0.00 210.94 0.00 -
Tower B2 RM - 0.138 0.00 210.94 0.00 210.94 0.00 -
Tower B3 RM - 0.138 0.00 210.94 0.00 210.94 0.00 -
0.00
200mm Lintel 0.00
0.00
Tower B1 RM - 0.236 0.00 210.94 0.00 210.94 0.00 -
Tower B2 RM - 0.236 0.00 210.94 0.00 210.94 0.00 -
Tower B3 RM - 0.236 0.00 210.94 0.00 210.94 0.00 -
0.00
Kitchen Platform 0.00
0.00
Tower B1 Sqm - 0.236 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.236 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm - 0.236 0.00 210.94 0.00 210.94 0.00 -
Toilet Water Proofing 0.00
Tower B1 Sqm - 0.086 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm 33.33 0.086 2.87 210.94 605.00 210.94 605.00 -
Tower B3 Sqm 128.59 0.086 11.06 210.94 2333.00 210.94 2333.00 -
0.00
Terrace Water Proofing 0.00
Tower B1 Sqm - 0.430 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.430 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm - 0.430 0.00 210.94 0.00 210.94 0.00 -
0.00
IPS Flooring 0.00
Tower B1 Sqm - 0.301 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.301 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm - 0.301 0.00 210.94 0.00 210.94 0.00 -

Tiling- Vitrified,Ceramic Tile 0.00


Flooring,Kitchen Granite
Tower B1 Sqm - 0.240 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.240 210.94 0.00 210.94 0.00 -
Tower B3 Sqm 140.66 0.240 33.76 210.94 7121.00 210.94 7121.00 -
Tiling- Vitrified Tile Skirting,Ceramic Tile 0.00
Skirting & Daddoing
Tower B1 Sqm - 0.270 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.270 0.00 210.94 0.00 210.94 0.00 -

Page 18 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount

Tower B3 Sqm 86.97 0.270 23.48 210.94 4953.00 210.94 4953.00 -

RAB 12 Ceiling Plastering CM 1:3, 10mm tk.


0.00
Tower B1 Sqm - 0.117 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.117 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm - 0.117 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
Inner Wall Plastering CM 1:4 , 12mm tk. 0.00 0.00
0.00 0.00
Tower B1 Sqm - 0.110 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.110 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm - 0.110 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
300mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm - 0.032 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.032 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm 0.032 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
250mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm - 0.045 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.045 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm 0.045 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
200mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm - 0.030 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.030 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm - 0.030 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
100mm AAC Block Work -Nito Bond Packing & Sill
0.00 0.00
Band Concrete
Tower B1 Sqm - 0.033 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.033 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm - 0.033 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
200mm Solid Block work 0.00 0.00
Tower B1 Sqm - 0.124 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.124 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm - 0.124 0.00 210.94 0.00 210.94 0.00 -
0.00 0.00
External Wall Plastering 12mm thick with CM 1:6,
and( second coat) top layer of 8mm thick of CM 0.00 0.00
1:3
0.00 0.00
Tower B1 Sqm - 0.158 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm 266.24 0.158 42.08 210.94 8876.00 210.94 8876.00 -
Tower B3 Sqm - 0.158 0.00 210.94 0.00 210.94 - -
0.00
Cement Concrete M-20 -grade 0.00
0.00
100mm Lintel 0.00
0.00
Tower B1 RM - 0.138 0.00 210.94 0.00 210.94 0.00 -
Tower B2 RM - 0.138 0.00 210.94 0.00 210.94 0.00 -
Tower B3 RM - 0.138 0.00 210.94 0.00 210.94 0.00 -
0.00
200mm Lintel 0.00
0.00
Tower B1 RM - 0.236 0.00 210.94 0.00 210.94 0.00 -
Tower B2 RM - 0.236 0.00 210.94 0.00 210.94 0.00 -
Tower B3 RM - 0.236 0.00 210.94 0.00 210.94 0.00 -
0.00
Kitchen Platform 0.00
0.00

Page 19 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount

Tower B1 Sqm - 0.236 0.00 210.94 0.00 210.94 0.00 -


Tower B2 Sqm - 0.236 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm - 0.236 0.00 210.94 0.00 210.94 0.00 -
Toilet Water Proofing 0.00
Tower B1 Sqm - 0.086 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.086 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm 200.10 0.086 17.21 210.94 3630.00 210.94 3630.00 -
0.00
Terrace Water Proofing 0.00
Tower B1 Sqm - 0.430 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.430 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm 66.37 0.430 28.54 210.94 6020.00 210.94 6020.00 -
0.00
IPS Flooring 0.00
Tower B1 Sqm - 0.301 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.301 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm - 0.301 0.00 210.94 0.00 210.94 0.00 -

Tiling- Vitrified,Ceramic Tile 0.00


Flooring,Kitchen Granite
Tower B1 Sqm - 0.240 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.240 210.94 0.00 210.94 0.00 -
Tower B3 Sqm 133.62 0.240 32.07 210.94 6764.00 210.94 6764.00 -
Tiling- Vitrified Tile Skirting,Ceramic Tile 0.00
Skirting & Daddoing
Tower B1 Sqm - 0.270 0.00 210.94 0.00 210.94 0.00 -
Tower B2 Sqm - 0.270 0.00 210.94 0.00 210.94 0.00 -
Tower B3 Sqm 78.51 0.270 21.20 210.94 4471.00 210.94 4471.00 -

Total Amount 15,458.01 3,657,454.00 3,260,672.00 396,782.00

Page 20 of 45
CHETTINAD BUILDERS PVT LTD
AKSHAYA TODAY WORK SITE
RIVER SAND - ESCALATION

RA Bill Sand Total Sand Approved Amount on Amount on Difference in


Description Unit Qty Basic Rate
No Constant Consumption Rate Approved Rate Basic Rate Amount

RAB 1 Ceiling Plastering CM 1:3, 10mm tk.


First to Fourth floor Sqm 3912.50 0.430 1682.38 105.00 176649.00 42.86 72102.00 104547.00

RAB 2 Ceiling Plastering CM 1:3, 10mm tk.

Tower B1 Sqm 1090.51 0.430 468.92 105.00 49237.00 42.86 20097.00 29,140.00
Tower B2 Sqm 2859.63 0.430 1229.64 105.00 129112.00 42.86 52699.00 76,413.00
Tower B3 Sqm 1659.59 0.430 713.62 105.00 74930.00 42.86 30584.00 44,346.00

RAB 3 Ceiling Plastering CM 1:3, 10mm tk.

Tower B1 Sqm 1243.90 0.430 534.88 115.00 61511.00 42.86 22923.00 38,588.00
Tower B2 Sqm 1391.24 0.430 598.23 115.00 68797.00 42.86 25639.00 43,158.00
Tower B3 Sqm 2994.06 0.430 1287.45 115.00 148056.00 42.86 55176.00 92,880.00
Toilet Water Proofing
Tower B1 Sqm 0.422 0.00 115.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 0.422 0.00 115.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 133.42 0.422 56.27 115.00 6471.00 42.86 2412.00 4,059.00
RAB 4 Ceiling Plastering CM 1:3, 10mm tk.

Tower B1 Sqm 3010.25 0.430 1294.41 110.00 142385.00 42.86 55475.00 86,910.00
Tower B2 Sqm 2598.14 0.430 1117.20 110.00 122892.00 42.86 47880.00 75,012.00
Tower B3 Sqm 0.00 0.430 0.00 110.00 0.00 42.86 0.00 0.00
Toilet Water Proofing
Tower B1 Sqm 0.422 0.00 110.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 141.76 0.422 59.79 110.00 6577.00 42.86 2562.00 4,015.00
Tower B3 Sqm 150.11 0.422 63.31 110.00 6964.00 42.86 2713.00 4,251.00
Tiling- Vitrified,Ceramic Tile
Flooring
Tower B1 Sqm 1.177 0.00 110.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 1.177 0.00 110.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 58.52 1.177 68.88 110.00 7577.00 42.86 2952.00 4,625.00
Tiling- Vitrified Tile
Skirting,Ceramic Tile Skirting &
Daddoing
Tower B1 Sqm 1.324 0.00 110.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 1.324 0.00 110.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 46.18 1.324 61.14 110.00 6726.00 42.86 2620.00 4,106.00

RAB 5 Ceiling Plastering CM 1:3, 10mm tk.

Tower B1 Sqm 1611.17 0.430 692.80 105.00 72744.00 42.86 29692.00 43,052.00
Tower B2 Sqm 136.94 0.430 58.88 105.00 6183.00 42.86 2524.00 3,659.00
Tower B3 Sqm 346.99 0.430 149.21 105.00 15667.00 42.86 6395.00 9,272.00
Toilet Water Proofing
Tower B1 Sqm 48.06 0.422 20.27 105.00 2128.00 42.86 869.00 1,259.00
Tower B2 Sqm 176.16 0.422 74.30 105.00 7801.00 42.86 3184.00 4,617.00
Tower B3 Sqm 101.82 0.422 42.94 105.00 4509.00 42.86 1840.00 2,669.00
Terrace Water Proofing
Tower B1 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 186.62 1.806 337.04 105.00 35389.00 42.86 14444.00 20,945.00
Tiling- Vitrified,Ceramic Tile
Flooring
Tower B1 Sqm 0.00 1.177 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 1.177 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 68.52 1.177 80.65 105.00 8468.00 42.86 3456.00 5,012.00
Tiling- Vitrified Tile
Skirting,Ceramic Tile Skirting &
Daddoing
Tower B1 Sqm 0.00 1.324 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 1.324 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 184.84 1.324 244.73 105.00 25696.00 42.86 10488.00 15,208.00

RAB 6 Ceiling Plastering CM 1:3, 10mm tk.

Tower B1 Sqm 320.81 0.430 137.95 105.00 14485.00 42.86 5912.00 8,573.00
Tower B2 Sqm 76.12 0.430 32.73 105.00 3437.00 42.86 1403.00 2,034.00
Tower B3 Sqm 172.62 0.430 74.23 105.00 7794.00 42.86 3181.00 4,613.00
Toilet Water Proofing
Tower B1 Sqm 394.64 0.422 166.44 105.00 17476.00 42.86 7133.00 10,343.00
Tower B2 Sqm 264.17 0.422 111.42 105.00 11699.00 42.86 4775.00 6,924.00
Tower B3 Sqm 52.13 0.422 21.99 105.00 2309.00 42.86 942.00 1,367.00
Terrace Water Proofing
Tower B1 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tiling- Vitrified,Ceramic Tile
Flooring
Tower B1 Sqm 191.79 1.177 225.74 105.00 23702.00 42.86 9674.00 14,028.00
Tower B2 Sqm 75.71 1.177 89.11 105.00 9356.00 42.86 3819.00 5,537.00
Tower B3 Sqm 189.07 1.177 222.54 105.00 23367.00 42.86 9537.00 13,830.00
Tiling- Vitrified Tile
Skirting,Ceramic Tile Skirting &
Daddoing
Tower B1 Sqm 65.52 1.324 86.75 105.00 9109.00 42.86 3718.00 5,391.00
Tower B2 Sqm 152.17 1.324 201.47 105.00 21155.00 42.86 8635.00 12,520.00
Tower B3 Sqm 65.99 1.324 87.37 105.00 9174.00 42.86 3744.00 5,430.00

RAB 07 Ceiling Plastering CM 1:3, 10mm tk.

Tower B1 Sqm 113.97 0.430 49.01 105.00 5146.00 42.86 2100.00 3,046.00
Tower B2 Sqm 174.64 0.430 75.10 105.00 7885.00 42.86 3218.00 4,667.00
Tower B3 Sqm 0.00 0.430 0.00 105.00 0.00 42.86 0.00 0.00
Toilet Water Proofing
Tower B1 Sqm 0.00 0.422 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 64.82 0.422 27.34 105.00 2871.00 42.86 1172.00 1,699.00
Tower B3 Sqm 83.63 0.422 35.27 105.00 3704.00 42.86 1512.00 2,192.00
Terrace Water Proofing
Tower B1 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tiling- Vitrified,Ceramic Tile
Flooring
Tower B1 Sqm 0.00 1.177 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 68.25 1.177 80.33 105.00 8435.00 42.86 3443.00 4,992.00
Tower B3 Sqm 211.72 1.177 249.20 105.00 26166.00 42.86 10680.00 15,486.00
Tiling- Vitrified Tile
Skirting,Ceramic Tile Skirting &
Daddoing
Tower B1 Sqm 0.00 1.324 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.90 1.324 1.19 105.00 125.00 42.86 51.00 74.00
Tower B3 Sqm 139.51 1.324 184.71 105.00 19395.00 42.86 7916.00 11,479.00

RAB 08 Ceiling Plastering CM 1:3, 10mm tk.

Tower B1 Sqm 0.00 0.430 0.00 105.00 0.00 42.86 0.00 0.00

Page 21 of 45
CHETTINAD BUILDERS PVT LTD
AKSHAYA TODAY WORK SITE
RIVER SAND - ESCALATION

RA Bill Sand Total Sand Approved Amount on Amount on Difference in


Description Unit Qty Basic Rate
No Constant Consumption Rate Approved Rate Basic Rate Amount

Tower B2 Sqm 0.00 0.430 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 106.56 0.430 45.82 105.00 4811.00 42.86 1964.00 2,847.00
Toilet Water Proofing
Tower B1 Sqm 0.00 0.422 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 0.422 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 555.38 0.422 234.24 105.00 24595.00 42.86 10039.00 14,556.00
Terrace Water Proofing
Tower B1 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tiling- Vitrified,Ceramic Tile
Flooring
Tower B1 Sqm 0.00 1.177 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 78.06 1.177 91.88 105.00 9647.00 42.86 3938.00 5,709.00
Tower B3 Sqm 34.96 1.177 41.15 105.00 4321.00 42.86 1763.00 2,558.00
Tiling- Vitrified Tile
Skirting,Ceramic Tile Skirting &
Daddoing
Tower B1 Sqm 0.00 1.324 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 4.64 1.324 6.14 105.00 645.00 42.86 263.00 382.00
Tower B3 Sqm 12.03 1.324 15.93 105.00 1672.00 42.86 683.00 989.00

RAB 09 Ceiling Plastering CM 1:3, 10mm tk.

Tower B1 Sqm 0.00 0.430 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 267.42 0.430 114.99 105.00 12074.00 42.86 4928.00 7,146.00
Tower B3 Sqm 32.29 0.430 13.88 105.00 1458.00 42.86 595.00 863.00
Toilet Water Proofing
Tower B1 Sqm 0.00 0.422 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 98.07 0.422 41.36 105.00 4343.00 42.86 1773.00 2,570.00
Tower B3 Sqm 0.00 0.422 0.00 105.00 0.00 42.86 0.00 0.00
Terrace Water Proofing
Tower B1 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tiling- Vitrified,Ceramic Tile
Flooring
Tower B1 Sqm 0.00 1.177 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.177 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 65.84 1.177 77.49 105.00 8137.00 42.86 3321.00 4,816.00
Tiling- Vitrified Tile
Skirting,Ceramic Tile Skirting &
Daddoing
Tower B1 Sqm 0.00 1.324 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 18.08 1.324 23.94 105.00 2513.00 42.86 1026.00 1,487.00
Tower B3 Sqm 5.12 1.324 6.78 105.00 712.00 42.86 291.00 421.00

RAB 10 Ceiling Plastering CM 1:3, 10mm tk.

Tower B1 Sqm 0.00 0.430 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 0.430 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.00 0.430 0.00 105.00 0.00 42.86 0.00 0.00
Toilet Water Proofing
Tower B1 Sqm 0.00 0.422 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 96.99 0.422 40.91 105.00 4295.00 42.86 1753.00 2,542.00
Tower B3 Sqm 13.67 0.422 5.77 105.00 605.00 42.86 247.00 358.00
Terrace Water Proofing
Tower B1 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 148.06 1.806 267.39 105.00 28076.00 42.86 11459.00 16,617.00
Tiling- Vitrified,Ceramic Tile
Flooring
Tower B1 Sqm 0.00 1.177 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.177 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 98.26 1.177 115.65 105.00 12144.00 42.86 4957.00 7,187.00
Tiling- Vitrified Tile
Skirting,Ceramic Tile Skirting &
Daddoing
Tower B1 Sqm 0.00 1.324 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.324 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 65.81 1.324 87.14 105.00 9149.00 42.86 3734.00 5,415.00

RAB 11 Ceiling Plastering CM 1:3, 10mm tk.

Tower B1 Sqm 86.31 0.430 37.11 105.00 3897.00 42.86 1591.00 2,306.00
Tower B2 Sqm 0.00 0.430 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.00 0.430 0.00 105.00 0.00 42.86 0.00 0.00
Toilet Water Proofing
Tower B1 Sqm 0.00 0.422 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 33.33 0.422 14.06 105.00 1476.00 42.86 602.00 874.00
Tower B3 Sqm 128.59 0.422 54.23 105.00 5694.00 42.86 2324.00 3,370.00
Terrace Water Proofing
Tower B1 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tiling- Vitrified,Ceramic Tile
Flooring
Tower B1 Sqm 0.00 1.177 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.177 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 1.177 0.00 105.00 0.00 42.86 0.00 0.00
Tiling- Vitrified Tile
Skirting,Ceramic Tile Skirting &
Daddoing
Tower B1 Sqm 1.324 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 1.324 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 1.324 0.00 105.00 0.00 42.86 0.00 0.00

RAB 12 Ceiling Plastering CM 1:3, 10mm tk.

Tower B1 Sqm 0.00 0.430 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 0.430 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.00 0.430 0.00 105.00 0.00 42.86 0.00 0.00
Toilet Water Proofing
Tower B1 Sqm 0.00 0.422 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 0.422 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 200.10 0.422 84.39 105.00 8861.00 42.86 3617.00 5,244.00
Terrace Water Proofing
Tower B1 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 66.37 1.806 119.86 105.00 12585.00 42.86 5137.00 7,448.00

Total Amount 14,636.90 1,574,969.00 627,296.00 947,673.00

Page 22 of 45
CHETTINAD BUILDERS PVT LTD
AKSHAYA TODAY WORK SITE
P.SAND - ESCALATION

RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount

RAB 1 Wall Plastering CM 1:4, 12mm tk.


M-Sand -Fine
First to Fourth floor Sqm 834.30 0.540 450.52 65.00 29,284.00 42.86 19,308.00 9976.00

RAB 2 Wall Plastering CM 1:4, 12mm tk.


M-Sand -Fine (Plastering Sand)
Tower B1 Sqm 2258.37 0.540 1,219.52 65.00 79,269.00 42.86 52,265.00 27004.00
Tower B2 Sqm 1323.34 0.540 714.60 65.00 46,449.00 42.86 30,626.00 15823.00
Tower B3 Sqm 2963.17 0.540 1,600.11 65.00 104,007.00 42.86 68,576.00 35431.00

RAB 3 Wall Plastering CM 1:4, 12mm tk.


M-Sand -Fine
Tower B1 Sqm 981.75 0.540 530.15 65.00 34,459.00 42.86 22,721.00 11738.00
Tower B2 Sqm 1559.55 0.540 842.16 65.00 54,740.00 42.86 36,092.00 18648.00
Tower B3 Sqm 1534.92 0.540 828.86 65.00 53,876.00 42.86 35,522.00 18354.00

RAB 4 Wall Plastering CM 1:4, 12mm tk.


M-Sand -Fine
Tower B1 Sqm 3402.68 0.540 1,837.45 65.00 119,434.00 42.86 78,748.00 40686.00
Tower B2 Sqm 5787.89 0.540 3,125.46 65.00 203,155.00 42.86 133,948.00 69207.00
Tower B3 Sqm 8032.19 0.540 4,337.38 65.00 281,930.00 42.86 185,888.00 96042.00

External Wall Plastering 12mm thick


with CM 1:6, and( second coat) top
layer of 8mm thick of CM 1:3

Tower B1 Sqm 0.00 0.854 - 65.00 - 42.86 - -


Tower B2 Sqm 0.00 0.854 - 65.00 - 42.86 - -
Tower B3 Sqm 2848.06 0.854 2,430.82 65.00 158,004.00 42.86 104,178.00 53,826.00

RAB 5 Wall Plastering CM 1:4, 12mm tk.


M-Sand -Fine
Tower B1 Sqm 9802.82 0.540 5,293.52 60.00 317,611.00 42.86 226,865.00 90746.00
Tower B2 Sqm 8410.86 0.540 4,541.86 60.00 272,512.00 42.86 194,651.00 77861.00
Tower B3 Sqm 6967.94 0.540 3,762.69 60.00 225,761.00 42.86 161,258.00 64503.00

External Wall Plastering 12mm thick


with CM 1:6, and( second coat) top
layer of 8mm thick of CM 1:3

Tower B1 Sqm 0.00 0.854 - 60.00 - 42.86 - -


Tower B2 Sqm 0.00 0.854 - 60.00 - 42.86 - -
Tower B3 Sqm 3461.11 0.854 2,954.06 60.00 177,244.00 42.86 126,603.00 50,641.00

RAB 06 Wall Plastering CM 1:4, 12mm tk.


M-Sand -Fine
Tower B1 Sqm 2084.47 0.540 1,125.61 60.00 67,537.00 42.86 48,241.00 19296.00
Tower B2 Sqm 2641.93 0.540 1,426.64 60.00 85,599.00 42.86 61,142.00 24457.00
Tower B3 Sqm 1766.88 0.540 954.12 60.00 57,247.00 42.86 40,891.00 16356.00

External Wall Plastering 12mm thick


with CM 1:6, and( second coat) top
layer of 8mm thick of CM 1:3

Tower B1 Sqm 1946.49 0.854 1,661.33 60.00 99,680.00 42.86 71,200.00 28,480.00
Tower B2 Sqm 922.08 0.854 787.00 60.00 47,220.00 42.86 33,728.00 13,492.00
Tower B3 Sqm 2424.08 0.854 2,068.96 60.00 124,137.00 42.86 88,670.00 35,467.00

RAB 07 Wall Plastering CM 1:4, 12mm tk.


M-Sand -Fine

Page 23 of 45
CHETTINAD BUILDERS PVT LTD
AKSHAYA TODAY WORK SITE
P.SAND - ESCALATION

RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount

Tower B1 Sqm 1258.10 0.540 679.37 60.00 40,762.00 42.86 29,116.00 11646.00
Tower B2 Sqm 1020.48 0.540 551.06 60.00 33,064.00 42.86 23,617.00 9447.00
Tower B3 Sqm 0.00 0.540 - 60.00 - 42.86 - 0.00

External Wall Plastering 12mm thick


with CM 1:6, and( second coat) top
layer of 8mm thick of CM 1:3

Tower B1 Sqm 1330.43 0.854 1,135.52 60.00 68,131.00 42.86 48,665.00 19,466.00
Tower B2 Sqm 2774.12 0.854 2,367.72 60.00 142,063.00 42.86 101,474.00 40,589.00
Tower B3 Sqm 1365.95 0.854 1,165.84 60.00 69,950.00 42.86 49,965.00 19,985.00

RAB 08 Wall Plastering CM 1:4, 12mm tk.


M-Sand -Fine
Tower B1 Sqm 383.00 0.540 206.82 60.00 12,409.00 42.86 8,864.00 3545.00
Tower B2 Sqm 1141.94 0.540 616.65 60.00 36,999.00 42.86 26,428.00 10571.00
Tower B3 Sqm 673.65 0.540 363.77 60.00 21,826.00 42.86 15,590.00 6236.00

External Wall Plastering 12mm thick


with CM 1:6, and( second coat) top
layer of 8mm thick of CM 1:3

Tower B1 Sqm 236.91 0.854 202.20 60.00 12,132.00 42.86 8,666.00 3,466.00
Tower B2 Sqm 1813.05 0.854 1,547.44 60.00 92,846.00 42.86 66,319.00 26,527.00
Tower B3 Sqm 603.08 0.854 514.73 60.00 30,884.00 42.86 22,060.00 8,824.00

RAB 09 Wall Plastering CM 1:4, 12mm tk.


M-Sand -Fine
Tower B1 Sqm - 0.540 - 60.00 - 42.86 - 0.00
Tower B2 Sqm 333.57 0.540 180.13 60.00 10,808.00 42.86 7,720.00 3088.00
Tower B3 Sqm 187.61 0.540 101.31 60.00 6,079.00 42.86 4,342.00 1737.00

External Wall Plastering 12mm thick


with CM 1:6, and( second coat) top
layer of 8mm thick of CM 1:3

Tower B1 Sqm - 0.854 - 60.00 - 42.86 - -


Tower B2 Sqm 1,201.68 0.854 1,025.64 60.00 61,538.00 42.86 43,956.00 17,582.00
Tower B3 Sqm - 0.854 - 60.00 - 42.86 - -

RAB 10 Wall Plastering CM 1:4, 12mm tk.


M-Sand -Fine
Tower B1 Sqm - 0.540 - 60.00 - 42.86 - 0.00
Tower B2 Sqm 382.21 0.540 206.39 60.00 12,384.00 42.86 8,845.00 3539.00
Tower B3 Sqm - 0.540 - 60.00 - 42.86 - 0.00

External Wall Plastering 12mm thick


with CM 1:6, and( second coat) top
layer of 8mm thick of CM 1:3

Tower B1 Sqm - 0.854 - 60.00 - 42.86 - -


Tower B2 Sqm 1,253.12 0.854 1,069.54 60.00 64,172.00 42.86 45,837.00 18,335.00
Tower B3 Sqm - 0.854 - 60.00 - 42.86 - -

IPS Flooring
Tower B1 Sqm 0.738 - 60.00 - 42.86 - -
Tower B2 Sqm 0.738 - 60.00 - 42.86 - -
Tower B3 Sqm 38.92 0.738 28.73 60.00 1,724.00 42.86 1,231.00 493.00

RAB 11 Wall Plastering CM 1:4, 12mm tk.


M-Sand -Fine
Tower B1 Sqm - 0.540 - 60.00 - 42.86 - 0.00
Tower B2 Sqm 131.25 0.540 70.88 60.00 4,253.00 42.86 3,038.00 1215.00

Page 24 of 45
CHETTINAD BUILDERS PVT LTD
AKSHAYA TODAY WORK SITE
P.SAND - ESCALATION

RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount

Tower B3 Sqm - 0.540 - 60.00 - 42.86 - 0.00

External Wall Plastering 12mm thick


with CM 1:6, and( second coat) top
layer of 8mm thick of CM 1:3

Tower B1 Sqm - 0.854 - 60.00 - 42.86 - -


Tower B2 Sqm 449.90 0.854 383.99 60.00 23,039.00 42.86 16,457.00 6,582.00
Tower B3 Sqm - 0.854 - 60.00 - 42.86 - -

IPS Flooring
Tower B1 Sqm - 0.738 - 60.00 - 42.86 - -
Tower B2 Sqm - 0.738 - 60.00 - 42.86 - -
Tower B3 Sqm - 0.738 - 60.00 - 42.86 - -

RAB 12 Wall Plastering CM 1:4, 12mm tk.


M-Sand -Fine
Tower B1 Sqm - 0.540 - 60.00 - 42.86 - 0.00
Tower B2 Sqm - 0.540 - 60.00 - 42.86 - 0.00
Tower B3 Sqm - 0.540 - 60.00 - 42.86 - 0.00

External Wall Plastering 12mm thick


with CM 1:6, and( second coat) top
layer of 8mm thick of CM 1:3

Tower B1 Sqm - 0.854 - 60.00 - 42.86 - -


Tower B2 Sqm 266.24 0.854 227.24 60.00 13,634.00 42.86 9,739.00 3,895.00
Tower B3 Sqm - 0.854 - 60.00 - 42.86 - -

IPS Flooring
Tower B1 Sqm - 0.738 - 60.00 - 42.86 - -
Tower B2 Sqm - 0.738 - 60.00 - 42.86 - -
Tower B3 Sqm - 0.738 - 60.00 - 42.86 - -

Total Amount 55,137.78 3,397,852.00 2,363,050.00 1,034,802.00

Page 25 of 45
CHETTINAD BUILDERS PVT LTD
AKSHAYA TODAY WORK SITE
M.SAND - ESCALATION

RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount

RAB 1
300mm AAC Block Work -Nito Bond
Packing
Tower B1 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
0.00
250mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 17.96 0.110 1.97 49.00 96.00 42.86 84.00 12.00
Tower B2 Sqm 36.66 0.110 4.02 49.00 197.00 42.86 172.00 25.00
Tower B3 Sqm 0.00 0.110 0.00 49.00 0.00 42.86 0.00 -
0.00
200mm AAC Block Work -Nito Bond 0.00
Packing
Tower B1 Sqm 192.52 0.073 13.97 49.00 685.00 42.86 599.00 86.00
Tower B2 Sqm 402.00 0.073 29.17 49.00 1429.00 42.86 1250.00 179.00
Tower B3 Sqm 0.00 0.073 0.00 49.00 0.00 42.86 0.00 -
0.00
100mm AAC Block Work -Nito Bond
0.00
Packing & Sill Band Concrete
Tower B1 Sqm 109.03 0.082 8.91 49.00 437.00 42.86 382.00 55.00
Tower B2 Sqm 225.93 0.082 18.46 49.00 905.00 42.86 791.00 114.00
Tower B3 Sqm 0.00 0.082 0.00 49.00 0.00 42.86 0.00 -
0.00
200mm Solid Block work 0.00
Tower B1 Sqm 0.00 0.910 0.00 49.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.910 0.00 49.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.910 0.00 49.00 0.00 42.86 0.00 -

RAB 2 Cement Concrete M-20 -grade

100mm Lintel

Tower B1 RM 78.56 0.253 19.88 49.00 974.00 42.86 852.00 122.00


Tower B2 RM 53.04 0.253 13.42 49.00 658.00 42.86 575.00 83.00
Tower B3 RM 0.00 0.253 0.00 49.00 0.00 42.86 0.00 0.00

200mm Lintel

Tower B1 RM 18.88 0.434 8.19 49.00 402.00 42.86 351.00 51.00


Tower B2 RM 19.22 0.434 8.34 49.00 409.00 42.86 357.00 52.00
Tower B3 RM 46.80 0.434 20.31 49.00 995.00 42.86 870.00 125.00

Kitchen Platform

Tower B1 Sqm 28.10 0.434 12.20 49.00 598.00 42.86 523.00 75.00
Tower B2 Sqm 18.74 0.434 8.13 49.00 398.00 42.86 348.00 50.00
Tower B3 Sqm 281.04 0.434 121.97 49.00 5977.00 42.86 5227.00 750.00

300mm AAC Block Work -Nito Bond


Packing
Tower B1 Sqm 2.74 0.080 0.22 49.00 11.00 42.86 9.00 2.00
Tower B2 Sqm 9.83 0.080 0.78 49.00 38.00 42.86 34.00 4.00
Tower B3 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
0.00
250mm AAC Block Work -Nito Bond 0.00
Packing
Tower B1 Sqm 71.50 0.110 7.83 49.00 384.00 42.86 336.00 48.00
Tower B2 Sqm 35.62 0.110 3.90 49.00 191.00 42.86 167.00 24.00
Tower B3 Sqm 0.00 0.110 0.00 49.00 0.00 42.86 0.00 -
0.00
200mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 1156.46 0.073 83.92 49.00 4112.00 42.86 3597.00 515.00
Tower B2 Sqm 612.90 0.073 44.48 49.00 2179.00 42.86 1906.00 273.00
Tower B3 Sqm 0.00 0.073 0.00 49.00 0.00 42.86 0.00 -
0.00
100mm AAC Block Work -Nito Bond
0.00
Packing & Sill Band Concrete
Tower B1 Sqm 576.77 0.082 47.13 49.00 2309.00 42.86 2020.00 289.00
Tower B2 Sqm 361.96 0.082 29.58 49.00 1449.00 42.86 1268.00 181.00
Tower B3 Sqm 0.00 0.082 0.00 49.00 0.00 42.86 0.00 -
0.00
200mm Solid Block work 0.00
Tower B1 Sqm 78.56 0.910 71.49 49.00 3503.00 42.86 3064.00 439.00

Page 26 of 45
RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount

Tower B2 Sqm 53.04 0.910 48.27 49.00 2365.00 42.86 2069.00 296.00
Tower B3 Sqm 0.00 0.910 0.00 49.00 0.00 42.86 0.00 -

RAB 3 Cement Concrete M-20 -grade

100mm Lintel

Tower B1 RM 167.26 0.253 42.32 49.00 2074.00 42.86 1814.00 260.00


Tower B2 RM 215.20 0.253 54.45 49.00 2668.00 42.86 2333.00 335.00
Tower B3 RM 0.00 0.253 0.00 49.00 0.00 42.86 0.00 0.00

200mm Lintel

Tower B1 RM 76.74 0.434 33.31 49.00 1632.00 42.86 1427.00 205.00


Tower B2 RM 70.36 0.434 30.54 49.00 1496.00 42.86 1309.00 187.00
Tower B3 RM 2.60 0.434 1.13 49.00 55.00 42.86 48.00 7.00

Kitchen Platform

Tower B1 Sqm 168.62 0.434 73.18 49.00 3586.00 42.86 3136.00 450.00
Tower B2 Sqm 65.10 0.434 28.25 49.00 1384.00 42.86 1211.00 173.00
Tower B3 Sqm 84.31 0.434 36.59 49.00 1793.00 42.86 1568.00 225.00
300mm AAC Block Work -Nito Bond
Packing
Tower B1 Sqm 7.64 0.080 0.61 49.00 30.00 42.86 26.00 4.00
Tower B2 Sqm 11.81 0.080 0.94 49.00 46.00 42.86 40.00 6.00
Tower B3 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
0.00
250mm AAC Block Work -Nito Bond 0.00
Packing
Tower B1 Sqm 93.36 0.110 10.23 49.00 501.00 42.86 438.00 63.00
Tower B2 Sqm 133.80 0.110 14.66 49.00 718.00 42.86 628.00 90.00
Tower B3 Sqm 0.00 0.110 0.00 49.00 0.00 42.86 0.00 -
0.00
200mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 1247.43 0.073 90.53 49.00 4436.00 42.86 3880.00 556.00
Tower B2 Sqm 2156.03 0.073 156.46 49.00 7667.00 42.86 6706.00 961.00
Tower B3 Sqm 2.94 0.073 0.21 49.00 10.00 42.86 9.00 1.00
0.00
100mm AAC Block Work -Nito Bond
0.00
Packing & Sill Band Concrete
Tower B1 Sqm 701.76 0.082 57.34 49.00 2810.00 42.86 2457.00 353.00
Tower B2 Sqm 1084.92 0.082 88.65 49.00 4344.00 42.86 3799.00 545.00
Tower B3 Sqm 57.95 0.082 4.74 49.00 232.00 42.86 203.00 29.00
0.00
200mm Solid Block work 0.00
Tower B1 Sqm 125.58 0.910 114.28 49.00 5600.00 42.86 4898.00 702.00
Tower B2 Sqm 55.58 0.910 50.58 49.00 2478.00 42.86 2168.00 310.00
Tower B3 Sqm 18.95 0.910 17.24 49.00 845.00 42.86 739.00 106.00
RAB 4 Cement Concrete M-20 -grade

100mm Lintel

Tower B1 RM 58.58 0.253 14.82 52.00 771.00 42.86 635.00 136.00


Tower B2 RM 64.68 0.253 16.36 52.00 851.00 42.86 701.00 150.00
Tower B3 RM 0.00 0.253 0.00 52.00 0.00 42.86 0.00 0.00

200mm Lintel

Tower B1 RM 23.40 0.434 10.16 52.00 528.00 42.86 435.00 93.00


Tower B2 RM 32.06 0.434 13.91 52.00 724.00 42.86 596.00 128.00
Tower B3 RM 0.00 0.434 0.00 52.00 0.00 42.86 0.00 0.00

Kitchen Platform

Tower B1 Sqm 0.00 0.434 0.00 52.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 112.90 0.434 49.00 52.00 2548.00 42.86 2100.00 448.00
Tower B3 Sqm 0.00 0.434 0.00 52.00 0.00 42.86 0.00 0.00
300mm AAC Block Work -Nito Bond
Packing
Tower B1 Sqm 0.00 0.080 0.00 52.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.080 0.00 52.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.080 0.00 52.00 0.00 42.86 0.00 -
0.00
250mm AAC Block Work -Nito Bond
0.00
Packing

Page 27 of 45
RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount

Tower B1 Sqm 0.00 0.110 0.00 52.00 0.00 42.86 0.00 -


Tower B2 Sqm 0.00 0.110 0.00 52.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.110 0.00 52.00 0.00 42.86 0.00 -
0.00
200mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 108.63 0.073 7.88 52.00 410.00 42.86 338.00 72.00
Tower B2 Sqm 139.49 0.073 10.12 52.00 526.00 42.86 434.00 92.00
Tower B3 Sqm 0.00 0.073 0.00 52.00 0.00 42.86 0.00 -
0.00
100mm AAC Block Work -Nito Bond
0.00
Packing & Sill Band Concrete
Tower B1 Sqm 5.44 0.082 0.44 52.00 23.00 42.86 19.00 4.00
Tower B2 Sqm 11.77 0.082 0.96 52.00 50.00 42.86 41.00 9.00
Tower B3 Sqm 0.00 0.082 0.00 52.00 0.00 42.86 0.00 -
0.00
200mm Solid Block work 0.00
Tower B1 Sqm 282.43 0.910 257.01 52.00 13365.00 42.86 11015.00 2,350.00
Tower B2 Sqm 46.45 0.910 42.27 52.00 2198.00 42.86 1812.00 386.00
Tower B3 Sqm 0.00 0.910 0.00 52.00 0.00 42.86 0.00 -

RAB 5 Cement Concrete M-20 -grade

100mm Lintel

Tower B1 RM 2.70 0.253 0.68 48.00 33.00 42.86 29.00 4.00


Tower B2 RM 2.70 0.253 0.68 48.00 33.00 42.86 29.00 4.00
Tower B3 RM 0.00 0.253 0.00 48.00 0.00 42.86 0.00 0.00

200mm Lintel

Tower B1 RM 11.05 0.434 4.80 48.00 230.00 42.86 206.00 24.00


Tower B2 RM 4.95 0.434 2.15 48.00 103.00 42.86 92.00 11.00
Tower B3 RM 2.40 0.434 1.04 48.00 50.00 42.86 45.00 5.00

Kitchen Platform

Tower B1 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
300mm AAC Block Work -Nito Bond
Packing
Tower B1 Sqm 0.43 0.080 0.03 48.00 2.00 42.86 1.00 1.00
Tower B2 Sqm 0.21 0.080 0.02 48.00 1.00 42.86 1.00 -
Tower B3 Sqm 0.00 0.080 0.00 48.00 0.00 42.86 0.00 -
0.00
250mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
0.00
200mm AAC Block Work -Nito Bond 0.00
Packing
Tower B1 Sqm 0.00 0.073 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.073 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.073 0.00 48.00 0.00 42.86 0.00 -
0.00
100mm AAC Block Work -Nito Bond
0.00
Packing & Sill Band Concrete
Tower B1 Sqm 0.00 0.082 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.24 0.082 0.02 48.00 1.00 42.86 1.00 -
Tower B3 Sqm 50.42 0.082 4.12 48.00 198.00 42.86 177.00 21.00
0.00
200mm Solid Block work 0.00
Tower B1 Sqm 17.50 0.910 15.93 48.00 764.00 42.86 683.00 81.00
Tower B2 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -

RAB 06 Cement Concrete M-20 -grade

100mm Lintel

Tower B1 RM 0.00 0.253 0.00 48.00 0.00 42.86 0.00 0.00


Tower B2 RM 0.00 0.253 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 RM 0.00 0.253 0.00 48.00 0.00 42.86 0.00 0.00

Page 28 of 45
RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount

200mm Lintel

Tower B1 RM 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00


Tower B2 RM 3.25 0.434 1.41 48.00 68.00 42.86 60.00 8.00
Tower B3 RM 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00

Kitchen Platform

Tower B1 Sqm 4.92 0.434 2.14 48.00 103.00 42.86 92.00 11.00
Tower B2 Sqm 4.92 0.434 2.14 48.00 103.00 42.86 92.00 11.00
Tower B3 Sqm 9.37 0.434 4.07 48.00 195.00 42.86 174.00 21.00
300mm AAC Block Work -Nito Bond
Packing
Tower B1 Sqm -6.47 0.080 -0.52 49.00 -25.00 42.86 -22.00 (3.00)
Tower B2 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
0.00
250mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
0.00
200mm AAC Block Work -Nito Bond 0.00
Packing
Tower B1 Sqm 0.00 0.073 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 14.25 0.073 1.03 48.00 50.00 42.86 44.00 6.00
Tower B3 Sqm 0.00 0.073 0.00 48.00 0.00 42.86 0.00 -
0.00
100mm AAC Block Work -Nito Bond
0.00
Packing & Sill Band Concrete
Tower B1 Sqm 0.00 0.082 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 49.79 0.082 4.07 48.00 195.00 42.86 174.00 21.00
Tower B3 Sqm 0.00 0.082 0.00 48.00 0.00 42.86 0.00 -
0.00
200mm Solid Block work 0.00
Tower B1 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -

RAB 07 Cement Concrete M-20 -grade

100mm Lintel

Tower B1 RM 2.02 0.253 0.51 48.00 25.00 42.86 22.00 3.00


Tower B2 RM 0.00 0.253 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 RM 0.00 0.253 0.00 48.00 0.00 42.86 0.00 0.00

200mm Lintel

Tower B1 RM 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00


Tower B2 RM 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 RM 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00

Kitchen Platform

Tower B1 Sqm 2.64 0.434 1.15 48.00 55.00 42.86 49.00 6.00
Tower B2 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
300mm AAC Block Work -Nito Bond
Packing
Tower B1 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
0.00
250mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
0.00
200mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 13.28 0.073 0.96 48.00 46.00 42.86 41.00 5.00
Tower B2 Sqm 0.00 0.073 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.073 0.00 48.00 0.00 42.86 0.00 -
0.00

Page 29 of 45
RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount

100mm AAC Block Work -Nito Bond


0.00
Packing & Sill Band Concrete
Tower B1 Sqm 0.00 0.082 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.082 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.082 0.00 48.00 0.00 42.86 0.00 -
0.00
200mm Solid Block work 0.00
Tower B1 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 35.01 0.910 31.86 48.00 1529.00 42.86 1365.00 164.00
Tower B3 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -

RAB 08 Cement Concrete M-20 -grade

100mm Lintel

Tower B1 RM 0.00 0.253 0.00 48.00 0.00 42.86 0.00 0.00


Tower B2 RM 0.00 0.253 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 RM 6.22 0.253 1.57 48.00 76.00 42.86 67.00 9.00

200mm Lintel

Tower B1 RM 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00


Tower B2 RM 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 RM 4.10 0.434 1.78 48.00 85.00 42.86 76.00 9.00

Kitchen Platform

Tower B1 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 4.44 0.434 1.93 48.00 92.00 42.86 83.00 9.00
300mm AAC Block Work -Nito Bond
Packing
Tower B1 Sqm 6.39 0.080 0.51 49.00 25.00 42.86 22.00 3.00
Tower B2 Sqm 6.28 0.080 0.50 49.00 25.00 42.86 21.00 4.00
Tower B3 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
0.00
250mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
0.00
200mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 3.85 0.073 0.28 48.00 13.00 42.86 12.00 1.00
Tower B2 Sqm 43.08 0.073 3.13 48.00 150.00 42.86 134.00 16.00
Tower B3 Sqm 144.30 0.073 10.47 48.00 503.00 42.86 449.00 54.00
0.00
100mm AAC Block Work -Nito Bond 0.00
Packing & Sill Band Concrete
Tower B1 Sqm 264.67 0.082 21.63 48.00 1038.00 42.86 927.00 111.00
Tower B2 Sqm 347.13 0.082 28.36 48.00 1361.00 42.86 1216.00 145.00
Tower B3 Sqm 595.59 0.082 48.67 48.00 2336.00 42.86 2086.00 250.00
0.00
200mm Solid Block work 0.00
Tower B1 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 44.40 0.910 40.40 48.00 1939.00 42.86 1732.00 207.00
Tower B3 Sqm 20.73 0.910 18.86 48.00 905.00 42.86 808.00 97.00

RAB 09 Cement Concrete M-20 -grade

100mm Lintel

Tower B1 RM 0.00 0.253 0.00 48.00 0.00 42.86 0.00 0.00


Tower B2 RM 0.00 0.253 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 RM 0.00 0.253 0.00 48.00 0.00 42.86 0.00 0.00

200mm Lintel

Tower B1 RM 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00


Tower B2 RM 0.64 0.434 0.28 48.00 13.00 42.86 12.00 1.00
Tower B3 RM 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00

Kitchen Platform

Tower B1 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00

Page 30 of 45
RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount

Tower B3 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
300mm AAC Block Work -Nito Bond
Packing
Tower B1 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
0.00
250mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
0.00
200mm AAC Block Work -Nito Bond 0.00
Packing
Tower B1 Sqm 0.00 0.073 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 67.41 0.073 4.89 48.00 235.00 42.86 210.00 25.00
Tower B3 Sqm 0.00 0.073 0.00 48.00 0.00 42.86 0.00 -
0.00
100mm AAC Block Work -Nito Bond 0.00
Packing & Sill Band Concrete
Tower B1 Sqm 0.00 0.082 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 40.30 0.082 3.29 48.00 158.00 42.86 141.00 17.00
Tower B3 Sqm 0.00 0.082 0.00 48.00 0.00 42.86 0.00 -
0.00
200mm Solid Block work 0.00
Tower B1 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -

RAB 10 Cement Concrete M-20 -grade

100mm Lintel

Tower B1 RM 0.00 0.253 0.00 48.00 0.00 42.86 0.00 0.00


Tower B2 RM 0.00 0.253 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 RM 0.00 0.253 0.00 48.00 0.00 42.86 0.00 0.00

200mm Lintel

Tower B1 RM 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00


Tower B2 RM 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 RM 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00

Kitchen Platform

Tower B1 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
300mm AAC Block Work -Nito Bond
Packing
Tower B1 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
0.00
250mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
0.00
200mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 0.00 0.073 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.073 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.073 0.00 48.00 0.00 42.86 0.00 -
0.00
100mm AAC Block Work -Nito Bond 0.00
Packing & Sill Band Concrete
Tower B1 Sqm 0.00 0.082 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.082 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.082 0.00 48.00 0.00 42.86 0.00 -
0.00
200mm Solid Block work 0.00
Tower B1 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -

Page 31 of 45
RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount

RAB 11 Cement Concrete M-20 -grade

100mm Lintel

Tower B1 RM - 0.253 0.00 48.00 0.00 42.86 0.00 0.00


Tower B2 RM - 0.253 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 RM - 0.253 0.00 48.00 0.00 42.86 0.00 0.00

200mm Lintel

Tower B1 RM - 0.434 0.00 48.00 0.00 42.86 0.00 0.00


Tower B2 RM - 0.434 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 RM - 0.434 0.00 48.00 0.00 42.86 0.00 0.00

Kitchen Platform

Tower B1 Sqm - 0.434 0.00 48.00 0.00 42.86 0.00 0.00


Tower B2 Sqm - 0.434 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 Sqm - 0.434 0.00 48.00 0.00 42.86 0.00 0.00
300mm AAC Block Work -Nito Bond
Packing
Tower B1 Sqm - 0.080 0.00 49.00 0.00 42.86 0.00 -
Tower B2 Sqm - 0.080 0.00 49.00 0.00 42.86 0.00 -
Tower B3 Sqm - 0.080 0.00 49.00 0.00 42.86 0.00 -
0.00
250mm AAC Block Work -Nito Bond 0.00
Packing
Tower B1 Sqm - 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm - 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm - 0.110 0.00 48.00 0.00 42.86 0.00 -
0.00
200mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm - 0.073 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm - 0.073 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm - 0.073 0.00 48.00 0.00 42.86 0.00 -
0.00
100mm AAC Block Work -Nito Bond
0.00
Packing & Sill Band Concrete
Tower B1 Sqm - 0.082 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm - 0.082 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm - 0.082 0.00 48.00 0.00 42.86 0.00 -
0.00
200mm Solid Block work 0.00

Page 32 of 45
RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount

Tower B1 Sqm - 0.910 0.00 48.00 0.00 42.86 0.00 -


Tower B2 Sqm - 0.910 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm - 0.910 0.00 48.00 0.00 42.86 0.00 -

Tiling- Vitrified,Ceramic Tile


Flooring
Tower B1 Sqm 0.00 1.177 0.00 48.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 1.177 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 140.66 1.177 165.56 48.00 7947.00 42.86 7095.00 852.00
Tiling- Vitrified Tile
Skirting,Ceramic Tile Skirting &
Daddoing
Tower B1 Sqm 0.00 1.324 0.00 48.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.324 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 86.97 1.324 115.15 48.00 5527.00 42.86 4935.00 592.00

RAB 12 Cement Concrete M-20 -grade

100mm Lintel

Tower B1 RM - 0.253 0.00 48.00 0.00 42.86 0.00 0.00


Tower B2 RM - 0.253 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 RM - 0.253 0.00 48.00 0.00 42.86 0.00 0.00

200mm Lintel

Tower B1 RM - 0.434 0.00 48.00 0.00 42.86 0.00 0.00


Tower B2 RM - 0.434 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 RM - 0.434 0.00 48.00 0.00 42.86 0.00 0.00

Kitchen Platform

Tower B1 Sqm - 0.434 0.00 48.00 0.00 42.86 0.00 0.00


Tower B2 Sqm - 0.434 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 Sqm - 0.434 0.00 48.00 0.00 42.86 0.00 0.00
300mm AAC Block Work -Nito Bond
Packing
Tower B1 Sqm - 0.080 0.00 49.00 0.00 42.86 0.00 -
Tower B2 Sqm - 0.080 0.00 49.00 0.00 42.86 0.00 -
Tower B3 Sqm - 0.080 0.00 49.00 0.00 42.86 0.00 -
0.00
250mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm - 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm - 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm - 0.110 0.00 48.00 0.00 42.86 0.00 -
0.00
200mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm - 0.073 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm - 0.073 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm - 0.073 0.00 48.00 0.00 42.86 0.00 -
0.00
100mm AAC Block Work -Nito Bond 0.00
Packing & Sill Band Concrete
Tower B1 Sqm - 0.082 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm - 0.082 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm - 0.082 0.00 48.00 0.00 42.86 0.00 -
0.00
200mm Solid Block work 0.00
Tower B1 Sqm - 0.910 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm - 0.910 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm - 0.910 0.00 48.00 0.00 42.86 0.00 -

Tiling- Vitrified,Ceramic Tile


Flooring
Tower B1 Sqm 0.00 1.177 0.00 48.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.177 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 133.62 1.177 157.27 48.00 7549.00 42.86 6740.00 809.00
Tiling- Vitrified Tile
Skirting,Ceramic Tile Skirting &
Daddoing
Tower B1 Sqm 0.00 1.324 0.00 48.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.324 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 78.51 1.324 103.94 48.00 4989.00 42.86 4455.00 534.00

Total Amount 2,762.47 135,825.00 118,390.00 17,435.00

Page 33 of 45
100mm Lintel for 1RM 200mm Lintel for 1RM
Coefficient -for 1RM L B D Qty Coefficient -for 1RM L B D Qty
1.00 0.10 0.175 0.0175 0.138 1.00 0.20 0.15 0.0300

Cement Constant Per RM 0.138 Bags Cement Constant Per RM 0.236 Bags
M Sand Constant Per RM 0.253 cft M Sand Constant Per RM 0.434 cft

M 20 Grade Concrete M 20 Grade Concrete

1 - 1.5 - 3 1 - 1.5 - 3

Cement Constant 7.86 Bags Cement Constant 7.86 Bags


Cement in KG 393.00 Kg Cement in KG 393.00 Kg
Cement in Cum - 1 0.27 Cum Cement in Cum - 1 0.27 Cum
Sand in Cum - 1.5 times 0.41 Cum Sand in Cum - 1.5 times 0.41 Cum
Aggregate - 3 times 0.82 Cum Aggregate - 3 times 0.82 Cum
Rebar Mes. Sh 35 of 45
Chettinad Builders Private Limited

BBS of Lintel
Size of Steel Bar
Sl Cutting
Description Dia N O M No P M
No Length 8 Tor 10 Tor 12 Tor 16 Tor 20 Tor 25 Tor 32 Tor

1.00 100mm Lintel


Size of Beam 1,000 100 175

Main Rods
Bottum rod 950 10 1 2 0.950 0.00 1.90 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
Top rod 950 10 1 2 0.950 0.00 1.90 0.00 0.00 0.00 0.00 0.00

950 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Rings @ Ends C/C 150 50 125 950 - - - - - 8 1 6 0.414 2.62 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total RM 2.62 3.80 0.00 0.00 0.00 0.00 0.00


Unit Weight 0.395 0.617 0.890 1.580 2.470 3.850 6.310
Total Qty 0.003 MT 0.001 0.002 0.000 0.000 0.000 0.000 0.000
2.00 200mm Lintel
Size of Beam 1,000 200 150

Main Rods
Bottum rod 950 10 1 2 0.950 0.00 1.90 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
Top rod 950 10 1 2 0.950 0.00 1.90 0.00 0.00 0.00 0.00 0.00

950 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Rings @ Ends C/C 150 150 100 950 - - - - - 8 1 6 0.564 3.57 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total RM 3.57 3.80 0.00 0.00 0.00 0.00 0.00


Unit Weight 0.395 0.617 0.890 1.580 2.470 3.850 6.310
Total Qty 0.003 MT 0.001 0.002 0.000 0.000 0.000 0.000 0.000
Rebar Mes. Sh 36 of 45
Chettinad Builders Private Limited

BBS of KITCHEN PLATFORM


Size of Steel Bar
Sl Cutting
Description Dia N O M No P M
No Length 8 Tor 10 Tor 12 Tor 16 Tor 20 Tor 25 Tor 32 Tor

1 Kitchen Platform -Slab Rod 2600 600 1NOs 0.00 0.00 0.00 0.00 0.00 0.00 0.00

L span - C/C 250 635 8 1 10 0.635 6.57 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
S span- C/C 200 2585 8 1 3 2.585 8.21 0.00 0.00 0.00 0.00 0.00 0.00

Kitchen Platform -Slab Rod 2060 600 1NOs 0.00 0.00 0.00 0.00 0.00 0.00 0.00

L span - C/C 250 635 8 1 8 0.635 5.32 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
S span- C/C 200 2095 8 1 3 2.095 6.65 0.00 0.00 0.00 0.00 0.00 0.00
0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Wall Rod -3Nos 800 600 0.00 0.00 0.00 0.00 0.00 0.00 0.00
600mm Width 100 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vertical Rod - C/C 150 865 8 3 4 0.965 11.58 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00


Wall Distributor C/C 200 585 50 8 3 4 0.635 7.62 0.00 0.00 0.00 0.00 0.00 0.00
0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Wall Rod -2Nos 800 530 0.00 0.00 0.00 0.00 0.00 0.00 0.00
600mm Width 100 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vertical Rod - C/C 150 865 8 2 4 0.965 6.82 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00


Wall Distributor C/C 200 515 50 8 2 4 0.565 4.52 0.00 0.00 0.00 0.00 0.00 0.00
0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total RM 57.29 0.00 0.00 0.00 0.00 0.00 0.00


Unit Weight 0.395 0.617 0.890 1.580 2.470 3.850 6.310
Total Qty 0.023 MT 0.023 0.000 0.000 0.000 0.000 0.000 0.000
Total Surface Area of Kitchen Platform 4.924 Sqm
Steel Constant 0.005 MT 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Kitchen Platform -1sqm
Coefficient -for 1Sqm L B D Qty
1.00 1.00 0.03 0.0300

Cement Constant Per Sqm 0.236 Bags


M Sand Constant Per Sqm 0.434 Cft

M 20 Grade Concrete

1 - 1.5 - 3

Cement Constant 7.86 Bags


Cement in KG 393.00 Kg
Cement in Cum - 1 0.27 Cum
Sand in Cum - 1.5 times 0.41 Cum
Aggregate - 3 times 0.82 Cum
TODAY PROJECT
NAME OF THE BLOCK : Tower -B1
NAME OF THE WORK : Kitchen Platform
Flat 01 Flat 02 Flat 03 Flat 04 Flat 05 Flat 06
S.NO FLATS Description TOTAL
2BHK 2BHK 2BHK 2BHK 3BHK 3BHK
Wall-4Nos Wall-5Nos Wall-4Nos Wall-5Nos Wall-4Nos Wall-5Nos
Plan -C Plan -B Plan -C Plan -C' Plan -C Plan -A
1 11th Floor % of Completion 100% 100% 100% 100% 100% 100%
Total Qty 4.444 4.924 4.444 4.924 4.444 4.924 28.104
Executed Qty 4.444 4.924 4.44 4.92 4.44 4.92 28.104
2 12th Floor % of Completion 100% 100% 100% 100% 100% 100%
Total Qty 4.444 4.924 4.444 4.924 4.444 4.924 28.104
Executed Qty 4.444 4.924 4.44 4.92 4.44 4.92 28.104
3 13th Floor % of Completion 100% 100% 100% 100% 100% 100%
Total Qty 4.444 4.924 4.444 4.924 4.444 4.924 28.104
Executed Qty 4.444 4.924 4.44 4.92 4.44 4.92 28.104
4 14th Floor % of Completion 100% 100% 100% 100% 100% 100%
Total Qty 4.444 4.924 4.444 4.924 4.444 4.924 28.104
Executed Qty 4.444 4.924 4.44 4.92 4.44 4.92 28.104
5 15th Floor % of Completion 100% 100% 100% 100% 100% 100%
Total Qty 4.444 4.924 4.444 4.924 4.444 4.924 28.104
Executed Qty 4.444 4.924 4.44 4.92 4.44 4.92 28.104
6 16th Floor % of Completion 100% 100% 100% 100% 100% 100%
Total Qty 4.444 4.924 4.444 4.924 4.444 4.924 28.104
Executed Qty 4.444 4.924 4.44 4.92 4.44 4.92 28.104
7 17th Floor % of Completion 100% 100% 100% 100% 100% 100%
Total Qty 4.444 4.924 4.444 4.924 4.444 4.924 28.104
Executed Qty 4.444 4.924 4.44 4.92 4.44 4.92 28.104
8 17th Floor % of Completion 100%
Total Qty 4.924 4.924
Executed Qty 4.92 4.924
Total Qty 31.11 34.47 31.11 34.47 31.11 39.39 201.65
Executed Qty 31.11 34.47 31.11 34.47 31.11 39.39 201.65

2.2 Total Executed Qty in (sqm) 201.652


Claimed upto Last Bill 201.65
This Bill Qty 0.00
IPS flooring 50mm thick 1:2:4 cement concrete using aggregate of 10mm

For 1Sqm
Coefficient -for 1Sqm L B D Qty
1.00 1.00 0.05 0.0500

Cement Constant Per Sqm 0.301 Bags


M Sand Constant Per Sqm 0.738 cft

M 20 Grade Concrete

1 :; 2:; 4;:

Cement Constant 6.02 Bags


Cement in KG 301.00 Kg
Cement in Cum - 1 0.21 Cum
Sand in Cum - 2 times 0.42 Cum
Aggregate - 4 times 0.84 Cum
Plastering for External wall surfaces of 20mmthick( two coats), First coat of 12mm
thick with CM 1:6, and( second coat) top layer of 8mm thick of CM 1:3 according to
specification inculding necessary scaffolding, curing and hacking to the RCC surfaces,G.I
Mesh fixing(100 to150mm wide) etc., complete. The rate shall inculde cost of water
proofing compound, making grooves if any etc., if applicable .,as per the specifications &
relevant drawings, as per the direction of Architect / Engineer in Charge (.Lift dcuts,ots
and corridor wall )surfaces

Cement:
1st Coat - 12mm Thick C: M - 1 : 6
Cement Constant for 1Sqm 0.074 Bags
2nd Coat - 8mm Thick C: M - 1 : 3 0.084 Bags

Total Bags Consumed per Sqm 0.1580 Bags

P Sand :
1st Coat - 12mm Thick C: M - 1 : 6
0.544 Cft
2nd Coat - 8mm Thick C: M - 1 : 3 0.309 Cft

Total Bags Consumed per Sqm 0.854 Cft


CHETTINAD BUILDERS PRIVATE LIMITED
Proposed Civil Finishing Works in B1 Tower of our Residential project " TODAY"
Measurement Sheet
S.No Description Grid Nos Unit Nos Length( L) Breadth( B) Depth( D) Quantity Remarks

Providing and constructing 250mm thick Aerocon


1.2
block work (AAC-Autoclaved Aerated Concrete )

Ref - DRG NO. HTC-181A-W-407

250mm Wall for 2BHK Flat


Bed Room 250mm Wall Sqm 1 0.960 2.450 2.352 h- 2.95-0.5 =2.45

Sher wall change 250mm Wall Sqm 1 0.960 2.780 2.669 h- 2.95-0.5 =2.45

Total Quantity for one 2BHK Flat 5.021 Sqm

250mm Wall for 3 BHK Flat

Bed Room -3 & Bed Room -2 250mm Wall Sqm 1 0.960 2.450 2.352

Deduction of Window W4 -0.750mX 1.50m -1Nos 250mm Wall Sqm -1 0.710 1.500 -1.065

Shear wall change 250mm Wall Sqm 1 0.960 2.780 2.669 h- 2.95-0.5 =2.45
Toilet door D2 sqm 1 0.960 2.780 2.669
Deduction for door Sqm -1 0.750 2.100 -1.575
Lintel sqm -1 1.000 0.200 -0.200
Total Quantity for one 3BHK Flat 4.850 Sqm

Bottom Layer Mortar 1.420 0.250 - Cum


C; M 1 : 5
Add 25 % dry Mortar Volume Calculation - + - - Cum

Cement Volume (in Cum) - 6.000 - Cum


Cement Volume ( in KG) - 1,440 - Kg
Cement ( in Bags ) - 50.000 - Bags

M Sand - 5.000 - Cum


- Cft

Top Layer Chipps Packing 2.880 0.250 0.050 0.036 Cum

Cement Volume (in Bags ) 0.036 6.020 0.217 Bags

M Sand 0.036 0.418 0.015 Cum


0.531 Cft

M 15Grade Concrete Cement 0.217 Bags


Cement 0.045 Bags Per Sqm
1 ; 2 ;4
M Sand 0.531 Cft
Cement Constant 6.02 Bags M Sand 0.110 Cft Per Sqm
Cement in KG 301.00 Kg
Cement in Cum - 1 0.21 Cum
Sand in Cum - 2 times 0.42 Cum
Aggregate - 4imes 0.84 Cum
CHETTINAD BUILDERS PRIVATE LIMITED
Proposed Civil Finishing Works in B1 Tower of our Residential project " TODAY"
Measurement Sheet
S.No Description Grid Nos Unit Nos
Length(L)
Breadth (B) Depth(D) Quantity Remarks

Providing and constructing 200mm thick Aerocon block


1.3
work (AAC-Autoclaved Aerated Concrete )
Ref - DRG NO. HTC-181A-W-407
200mm Wall for 2BHK -Flat
Foyer Wall Sqm 1 1.180 2.780 3.280 1.115
Deduction of Door D1 -1.00X2.100m-1Nos Sqm -1 1.000 2.100 -2.100
Deduction of Cut Lintel Sqm -1 1.150 0.150 -0.173
kitchen Wall
Short wall Sqm 1 2.600 2.780 7.228
Short wall Sqm 1 2.500 2.450 6.125
Deduction of Window W2 -1.50mX 1.30m -1Nos Sqm -1 1.500 1.300 -1.950

Living & Dinning Area


Short Wall Sqm 0.5 3.610 2.780 5.018
Short Wall Sqm 1 3.560 2.450 8.722
Deduction of DW1 - 2.00mX2.40m -1Nos Sqm -1 2.000 2.400 -4.800
Deduction of W1 - 0.750mX1.50m -1Nos Sqm -1 0.750 1.500 -1.125

Bath-2 Sqm 1 2.355 2.450 5.770


Deduction of V1 - 0.60mX0.90m -1Nos Sqm -1 0.600 0.900 -0.540

Bed Room
Sqm 1 4.690 2.450 11.491
Deduction of Window W3 -1.060mX 1.50m -1Nos Sqm -1 1.060 1.500 -1.590
Deduction of Window W4 -1.500mX 1.50m -1Nos Sqm -1 1.500 1.500 -2.250

Master Bedroom
Long Wall Sqm 1 3.600 2.450 8.820 3.55
Deduction of Window W4 -1.500mX 1.50m -1Nos Sqm -1 1.500 1.500 -2.250
Short Wall Sqm 1 1.940 2.450 4.753
Deduction of W1 - 0.750mX1.50m -1Nos Sqm -1 0.750 1.500 -1.125

Bath-1
Short Wall Sqm 0.50 2.060 2.450 2.524
Long Wall Sqm 2 2.380 2.450 11.662
Deduction of V1 - 0.60mX0.90m -1Nos Sqm -1 0.600 0.900 -0.540

Total Quantity for one 2BHK Flat 56.950 Sqm

200mm Wall for 3 BHK -Flat

Foyer Wall Sqm 1 1.180 2.780 3.280 1.115


Deduction of Door D1 -1.00X2.100m-1Nos Sqm -1 1.000 2.100 -2.100
Deduction of Cut Lintel Sqm -1 1.150 0.150 -0.173
kitchen Wall
Short wall Sqm 1 2.600 2.780 7.228
Short wall Sqm 1 2.500 2.450 6.125 2.45
Deduction of Window W2 -1.50mX 1.30m -1Nos Sqm -1 1.500 1.300 -1.950

Living & Dinning Area


Short Wall Sqm 0.5 3.610 2.780 5.018
Short Wall Sqm 1 3.560 2.450 8.722 3.51
Deduction of DW1 - 2.00mX2.40m -1Nos Sqm -1 2.000 2.400 -4.800
Deduction of W1 - 0.750mX1.50m -1Nos Sqm -1 0.750 1.500 -1.125

Bath-2 Sqm 1 2.380 2.450 5.831 2.305


Deduction of V1 - 0.60mX0.90m -1Nos Sqm -1 0.600 0.900 -0.540

Bed Room -3 & Bed Room -2


Sqm 1 7.500 2.450 18.375 7.5
Deduction of Window W5 -0.710mX 1.50m -1Nos Sqm -1 0.710 1.500 -1.065
Deduction of Window W4 -1.500mX 1.50m -1Nos Sqm -1 1.500 1.500 -2.250
Deduction of Window W4 -1.500mX 1.50m -1Nos Sqm -1 1.500 1.500 -2.250

Master Bedroom Passage Wall Sqm 1 5.620 2.450 13.769


Deduction of W4 - 0.750mX1.50m -1Nos Sqm -1 0.750 1.500 -1.125

Master Bedroom
Long Wall Sqm 1 3.600 2.450 8.820 3.55
Deduction of DW1 - 2.00mX2.40m -1Nos Sqm -1 2.000 2.400 -4.800
Short Wall Sqm 1 1.940 2.450 4.753
Deduction of W4 - 0.750mX1.50m -1Nos Sqm -1 0.750 1.500 -1.125

Bath-1
Short Wall Sqm 0.50 2.060 2.450 2.524
Long Wall Sqm 2 2.380 2.450 11.662
Deduction of V1 - 0.60mX0.90m -1Nos Sqm -1 0.600 0.900 -0.540

Master Bed Room Balcony Wall Sqm 1 1.160 2.450 2.842


Total Quantity for one 3BHK Flat 75.106 Sqm

COMMON AREA

Flat-2 kitchen 200mm Wall with Shear Wall Sqm 1 1.620 2.450 3.969
Flat-4 kitchen 200mm Wall with Shear Wall Sqm 1 1.850 2.450 4.533
Flat-5 kitchen 200mm Wall with Shear Wall Sqm 1 1.850 2.450 4.533

FHC Shaft Sqm 1 1.620 2.470 4.001 1.57


TV /Tel Shaft Sqm 1 1.700 2.470 4.199 1.65

MeterBoard Main Raising Shaft & Garbage Room Sqm 1 3.475 2.450 8.514
Deduction of D3 -0.750mX 2.10m -1Nos Sqm -1 0.750 2.100 -1.575
Deduction of Cut Lintel Sqm -1 1.050 0.150 -0.158
Duct opening Sqm -1 0.750 1.200 -0.900
MeterBoard Main Raising Shaft Sqm 1 1.215 2.780 3.378

Fire Staircase Room Sqm 1 2.500 2.450 6.125


Deduction of Door D1 -1.00X2.100m-1Nos Sqm -1 1.000 2.100 -2.100
Deduction of Cut Lintel Sqm -1 1.150 0.150 -0.173
Fire Staircase Room -Waist Slab Area Sqm 1 2.500 2.280 5.700

Main Staircase Room Sqm 1 2.715 2.280 6.190


Deduction of Window -W6 -1.69m X1.50m -1Nos Sqm -1 1.690 1.500 -2.535

Total Quantity for Common Area 43.701 Sqm

Bottom Layer Mortar 76.655 0.200 - Cum


C; M 1 : 5
Add 25 % dry Mortar Volume Calculation - + - - Cum

Cement Volume (in Cum) - 6.000 - Cum


Cement Volume ( in KG) - 1,440 - Kg
Cement ( in Bags ) - 50.000 - Bags

M Sand - 5.000 - Cum


- Cft

Top Layer Chipps Packing 86.405 0.200 0.050 0.864 Cum

Cement Volume (in Bags ) 0.864 6.020 5.202 Bags

M Sand 0.864 0.418 0.361 Cum


12.755 Cft

M 15Grade Concrete Cement 5.202 Bags


Cement 0.030 Bags Per Sqm
1 ; 2 ;4
M Sand 12.755 Cft
Cement Constant 6.02 Bags M Sand 0.073 Cft Per Sqm
Cement in KG 301.00 Kg
Cement in Cum - 1 0.21 Cum
Sand in Cum - 2 times 0.42 Cum
Aggregate - 4imes 0.84 Cum
CHETTINAD BUILDERS PRIVATE LIMITED
Proposed Civil Finishing Works in B1 Tower of our Residential project " TODAY"
Measurement Sheet
RAB -01
S.No Description Grid Nos Unit Nos Length(L) Breadth(B) Depth(D) Quantity Remarks
Providing and constructing 100mm thick Aerocon block work (AAC-
1.4
Autoclaved Aerated Concrete )

DRG NO. HTC-181A-W-407

100mm Wall for 2BHK -Flat


Kitchen Wall
Long Wall 100mm Wall Sqm 1 2.760 2.780 7.673
Deduction of Open -0.90mX 2.10m -1Nos 100mm Wall Sqm -1 0.900 2.100 -1.890
Deduction of Cut Lintel 100mm Wall Sqm -1 1.200 0.200 -0.240
Partirion Wall 100mm Wall Sqm 1 0.900 2.780 2.502
Shaft Wall 100mm Wall Sqm 1 0.760 2.780 2.113
Deduction of MS Louver -0.76mX0.80m -1Nos 100mm Wall Sqm -1 0.760 0.800 -0.608

Bath-2
2.480 +1.720m Wall 100mm Wall Sqm 1 4.300 2.780 11.954 4.275
Deduction of D3 -0.750mX 2.10m -1Nos 100mm Wall Sqm -1 0.750 2.100 -1.575
Deduction of Cut Lintel 100mm Wall Sqm -1 1.050 0.200 -0.210

Bed Room 100mm Wall Sqm 1 2.870 2.780 7.979 2.82


Deduction of D2 -0.900mX 2.10m -1Nos 100mm Wall Sqm -1 0.900 2.100 -1.890
Deduction of Cut Lintel 100mm Wall Sqm -1 1.050 0.200 -0.210

Master Bedroom Passage Wall 100mm Wall Sqm 1 0.960 2.780 2.669
Deduction of D2 -0.900mX 2.10m -1Nos 100mm Wall Sqm -1 0.900 2.100 -1.890
Deduction of Cut Lintel 100mm Wall Sqm -1 1.200 0.200 -0.240

Bath-1
Short Wall 100mm Wall Sqm 1 1.660 2.450 4.067 1.61
Deduction of D3 -0.750mX 2.10m -1Nos 100mm Wall Sqm -1 0.750 2.100 -1.575
Deduction of Cut Lintel 100mm Wall Sqm -1 1.050 0.200 -0.210

Balcony Shaft 100mm Wall Sqm 1 0.860 2.780 2.391

Total Quantity for one 2BHK Flat 30.81 Sqm

100mm Wall for 3 BHK -Flat

Kitchen Wall
Long Wall 100mm Wall Sqm 1 2.760 2.780 7.673
Deduction of Open -0.90mX 2.10m -1Nos 100mm Wall Sqm -1 0.900 2.100 -1.890
Deduction of Cut Lintel 100mm Wall Sqm -1 1.200 0.200 -0.240
Partirion Wall 100mm Wall Sqm 1 0.900 2.780 2.502
Shaft Wall 100mm Wall Sqm 1 0.760 2.780 2.113
Deduction of MS Louver -0.76mX0.80m -1Nos 100mm Wall Sqm -1 0.760 0.800 -0.608

Bath-2
Toilet wall 100mm Wall Sqm 1 2.580 2.780 7.172 2.405

Bed Room -3 & Bed Room -2 100mm Wall Sqm 1 9.400 2.780 26.132
Deduction of D2 -0.900mX 2.10m -1Nos 100mm Wall Sqm -1 0.900 2.100 -1.890
Deduction of Cut Lintel 100mm Wall Sqm -1 1.050 0.200 -0.210
Deduction of D2 -0.900mX 2.10m -1Nos 100mm Wall Sqm -1 0.900 2.100 -1.890
Deduction of Cut Lintel 100mm Wall Sqm -1 1.050 0.200 -0.210

Master Bedroom Door Wall 100mm Wall Sqm 1 0.960 2.780 2.669
Deduction of D2 -0.900mX 2.10m -1Nos 100mm Wall Sqm -1 0.900 2.100 -1.890
Deduction of Cut Lintel 100mm Wall Sqm -1 1.200 0.200 -0.240

Bath-1
Short Wall 100mm Wall Sqm 1 1.660 2.450 4.067 1.61
Deduction of D3 -0.750mX 2.10m -1Nos 100mm Wall Sqm -1 0.750 2.100 -1.575
Deduction of Cut Lintel 100mm Wall Sqm -1 1.050 0.200 -0.210

Bed Room Balcony Shaft 100mm Wall Sqm 1 0.860 2.780 2.391

Master Bed Room Balcony Shaft 100mm Wall Sqm 1 0.550 2.780 1.529

Total Quantity for one 3BHK Flat 45.395 Sqm

Common Area
FHC Shaft 100mm Wall Sqm 1 1.620 2.470 4.001 1.57
Deduction of Open 100mm Wall Sqm -1 1.200 1.200 -1.440

TV /Tel Shaft 100mm Wall Sqm 1 1.700 2.470 4.199 1.65


Deduction of Open 100mm Wall Sqm -1 1.200 0.900 -1.080

metering board 100mm Wall Sqm 1 1.215 2.780 3.378


garbage chute sill level wall

Total Quantity for Common Area 9.058 Sqm

Kitchen Ledge Wall

Ledge Wall in Utility Area


Flat 1 ,Flat 3, Flat 4 & Flat 5 = 6Nos Sqm 6 0.760 2.450 11.172 JMR

Ledge Wall Below Kitchen Counter Slab


Flat 1 ,Flat 3 & Flat 5 = 3Nos Sqm 3 1.010 0.600 1.818 JMR
Flat 2 ,Flat 4 & Flat 6 = 3Nos Sqm 3 0.570 0.600 1.026 JMR

Total Quantity for Kitchen Ledge Wall 14.016 Sqm


Balcony Duct

For 2BHK Flat


Living Area Balcony
Wall -1 Flat -1 , 2 ,3 & 4 Sqm 1 0.510 2.750 1.403 JMR
Wall -2 Flat -1 , 2 ,3 & 4 Sqm 2 0.175 2.750 0.962 JMR

Total for 2BHK Flat 2.365 Sqm

For 3BHK Flat


Living Area Balcony
Wall -1 Flat - 5 & 6 Sqm 1 0.510 2.750 1.403 JMR
Wall -2 Flat - 5 & 6 Sqm 2 0.175 2.750 0.962 JMR

Master Bed Room Balcony


Wall -1 Flat - 5 & 6 Sqm 1 0.275 2.750 0.756 JMR
Wall -2 Flat - 5 & 6 Sqm 1 0.275 2.750 0.756 JMR

Total for 3BHK Flat 3.878 Sqm

Kitchen Shaft Block work

Front Wall Sqm 1 0.760 2.450 1.862 JMR


Deduction of Louevr Sqm -1 0.750 0.800 -0.600 JMR
Deduction of cut lintel Sqm -1 0.760 0.150 -0.114 JMR

Total Quantity for Kitchen Ledge Wall 1.148 Sqm

Bottom Layer Mortar 43.815 0.100 - Cum


C; M 1 : 5
Add 25 % dry Mortar Volume Calculation - + - - Cum

Cement Volume (in Cum) - 6.000 - Cum


Cement Volume ( in KG) - 1,440 - Kg
Cement ( in Bags ) - 50.000 - Bags

M Sand - 5.000 - Cum


- Cft

Top Layer Chipps Packing 52.365 0.100 0.050 0.262 Cum

Cement Volume (in Bags ) 0.262 6.020 1.576 Bags

M Sand 0.262 0.418 0.109 Cum


3.865 Cft

SILL Band 43.815 0.100 0.075 0.329 Cum

Cement Volume (in Bags ) 0.329 6.020 1.978 Bags

M Sand 0.329 0.418 0.137 Cum


4.851 Cft

M 15Grade Concrete Cement 3.554 Bags


Cement 0.033 Bags Per Sqm
1 ; 2 ;4
M Sand 8.716 Cft
Cement Constant 6.02 Bags M Sand 0.082 Cft Per Sqm
Cement in KG 301.00 Kg
Cement in Cum - 1 0.21 Cum
Sand in Cum - 2 times 0.42 Cum
Aggregate - 4imes 0.84 Cum