You are on page 1of 5

PROFESSIONAL PRACTICE 3 A part of the Supplemental Service of

an Architect wherein it is based on


The following are services covered for
the concept of expanded planning
FULLTIME SUPERVISION SERVICES, EXCEPT:
services to include other activities
• CONSULTATION necessary for the proper handling of
• FILING OF DOCUMENTS the numerous components considered in
the formulation of Master Development
• EVALUATION OF CONSTRUCTION WORK
Plan.
• QUALITY CONTROL
• INTERIOR DESIGN
• NONE OF THE ABOVE
• ACOUSTIC, COMMUNICATION AND
ELECTRONIC ENGINEERING
A part of the Supplemental Service of • PHYSICAL PLANNING
an Architect wherein the Architect
• COMPREHENSIVE PLANNING
together with his/her consultants, are
able to build an environment that • NONE OF THE ABOVE
answers to the sophisticated demands of
varied activities within an enclosed For Supplemental Services of an
space and designs all the structure and Architect under Physical Planning
all its utilities and to coordinate the Services Schedule of Fee the rate of
works of all allied design fees stipulated is based on the
professionals involved in the project. assumption that the land to be
developed is moderately flat. If the
land is rugged with steep terrain the
• INTERIOR DESIGN
fee shall be increased by
• ACOUSTIC, COMMUNICATION AND
• 10%
ELECTRONIC ENGINEERING
• 25%
• PHYSICAL PLANNING
• 30%
• COMPREHENSIVE PLANNING
• 5%
• NONE OF THE ABOVE
• NONE OF THE ABOVE

A Method of Compensation for Regular The following are the scope of works
Design Services of an Architect, for Physical Planning Services of an
wherein this method may be applied to Architect under the Supplemental
Government Projects since this project services, ЕХСЕРТ:
entails more paper work and time-
consuming efforts. • EXAMINES LAWS ORDINANCES RULES AND
REGULATIONS AFFECTING THE PROJECT

• PROFESSIONAL FEE PLUS EXPENSES • PREPARES BUDGETARY ESTIMATE OF COST


OF PHYSICAL DEVELOPMENT
• LUMP SUM OR FIXED FEE
• UNDERTAKES MODIFICATIONS, REVISIONS
• PER DIEM, HONORARIUM PLUS AND CHANGES AS MAY BE REQUIRED
REIMBURSABLE EXPENSES
• PREPARES CONCEPT DEVELOPMENT PLANS,
• MULTIPLE OF DIRECT PERSONNEL EXPENSES POLICIES, IMPLEMENTING STRATEGIES TO
• NONE OF THE ABOVE ARRIVE AT THE MASTER DEVELOPMENT
PLAN
• NONE OF THE ABOVE
The following are the scope of works • IDENTIFIES EXISTING LAND USE,
for Landscape Design Services of an RESOURCES, SOCIAL BEHAVIOR AND
Architect under the Supplemental INTERACTION
services, EXCEPT:
• UNDERTAKES ENVIRONMENTAL ANALYSIS,
• PREPARES THE GENERAL GROUND MODELING FEASIBILITY STUDIES, DEMOGRAPHIC
PLAN AND PLANTING LAYOUT ANALYSIS.
• CONDUCTS FINAL INSPECTION AND • EXAMINES EXISTING LAWS, ORDINANCES,
APPROVAL OF LANDSCAPING WORK POLITICAL/SOCIAL CONSTRAINTS
• PREPARES SCALED PRELIMINARY PLANS • NONE OF THE ABOVE
SHOWING PHYSICAL ALLOCATION OF
AREAS, ROADS AND PEDESTRIAN For Supplemental Services of an
ARTERIES, BASIC UTILITY LAYOUTS AND Architect under Interior Design
BUILDING ENVELOPES Services, Landscape Design Services
• PREPARES SCHEDULE OF SHRUBS AND and Acoustic Communication and
OTHER PLANTS Electronic Engineering Services in
• NONE OF THE ABOVE cases that the Client hire separately
the services of the Consultant, the
The following are the scope of works fee of the Architect for coordinating
for Acoustic Communication and the works of the Consultant and
Electronic Engineering Services of the relating his work with the design
Architect under the Supplemental concept of the Architect will be _____
Services, EXCEPT: of the “Cost of Work”.

• PREPARE THE DRAWINGS AND


SPECIFIGATIONS FOR ACOUSTIC DESIGNS, • 20%
AGOUSTICTREATMENT SOUND, CONTROL, • 15%
SOUND REINFORCEMENT, SOUND • 12%
INSULATION AND COMMUNICATION SYSTEM
• 10%
• PREPARE SPECIFICATIONS OF ELECTRONIC
EQUIPMENT • NONE OF THE ABOVE – 5%

• PREPARES SCALED PRELIMINARY PLANS The following are the scope of works
SHOWING PHYSICAL ALLOCATION OF for Interior Design Services of an
AREAS, ROADS AND PEDESTRIAN Architect under the Supplemental
ARTERIES, BASIC UTILITY LAYOUTS AND services, EXCEPT:
BUILDING ENVELOPES
• PREPARE THE DRAWINGS AND
• CHECK AND APPROVES THE SAMPLE OF SPEGIFICATIONS FOR ACOUSTIC DESIGNS.
MATERIALS ACOUSTIC TREATMENT, SOUND CONTROL,
• NONE OF THE ABOVE SOUND REINFORCEMENT, SOUND
INSULATION AND COMMUNICATION SYSTEM
The following are the scope of works • PRESCRIBES FURNITURE AND INTERIOR
for Comprehensive Planning Services of DESIGN FINISHES APPROPRIATE FOR
an Architect under the Supplemental DIFFERENT ACTIVITIES AND SPACES
services, EXCEPT:
• ASSISTS THE CLIENT IN CONDUCING BIDS
OR NEGOTIATIONS WITH FURNITURE
• PREPARES CONCEPT DEVELOPMENT PLANS FABRICATORS AND OTHER SUPPLIERS
AND REPORT FROM RELEVANT INFORMATION
GATHERED BY OTHER DISCIPLINES
• CONDUCTS FINAL INSPECTION AND • RECREATIONAL COMPONENT
APPROVAL OF FURNITURE AND OTHER • SOCIO-CULTURAL COMPONENT
ITEMS
• LEGAL COMPONENT
• NONE OF THE ABOVE
• TRANSPORT COMPONENT
For Supplemental Services of an • NONE OF THE ABOVE
Architect under Physical Planning
Services, the following are its main For Supplemental Services of an
components used in reference to a Architect under Comprehensive Planning
smaller scale the siting of buildings Services, the _____ is concerned with
and its Influence on the neighboring the management and use of land as well
areas to be affected, ЕХСЕРТ: as the conservation and upgrading of
• PHYSICAL COMPONENT the human environment.

• SOCIAL COMPONENT • PHYSICAL PLANNER

• ECONOMIC COMPONENT • ENVIRONMENTAL PLANNER

• SCIENCE OF MANAGEMENT AND RESOURCE • URBAN PLANNER

• NONE OF THE ABOVE • COMPREHENSIVE PLANNER


• NONE OF THE ABOVE
For Supplemental Services of an
Architect under Physical Planning For Supplemental Services of an
Services Schedule of Fee Type 1, the Architect under Physical Planning
Recommended Professional Fee for Services Schedule of Fee Type 2, the
Subdivision Planning for building Recommended Professional Fee for
sites such as Industrial Estates, Subdivision Planning for Housing on
Commercial Centers, Sports Complexes, properties within Metro-Manila,
Resorts, etc., and Site Planning of cities, Regional Centers and
any complex consisting of several Provincial Capitals with a lot area
structures within a contiguous site over 200 hectares shall be______.
and with a lot area of over 200 • P550,000 PLUS P2,000 PER HECTARE IN
hectares, shall be ______. EXCESS OF 200 HECTARES
• P 875,000 PLUS P 3,000 PER HECTARE • P550,000 PLUS P5,000 PER HECTARE IN
IN EXCESS OF 200 HECTARES EXCESS OF 200 HECTARES
• P 850,000 PLUS P 3,000 PER HECTARE • P300,000 PLUS P2,300 PER HECTARE IN
IN EXCESS OF 200 HECTARES EXCESS OF 200 HECTARES
• P350,000 PLUS P2,000 PER HECTARE IN
• P 850,000 PLUS P 3,500 PER HECTARE
EXCESS OF 200 HECTARES
IN EXCESS OF 200 HECTARES
• NONE OF THE ABOVE
• P 800,000 PLUS P 3,500 PER HECTARE
IN EXCESS OF 200 HECTARES A part of the Supplemental Service of
• NONE OF THE ABOVE an Architect wherein it is the art and
science of ordering the use of land
For Supplemental Services of an and siting of buildings and
Architect under Comprehensive Planning communication routes to secure the
Services, in the formulation of the maximum practicable degree of economy,
Master Development Plan, the following social amenities convenience and
components are to be considered, aesthetics.
EXCEPT: • INTERIOR DESIGN
• ACOUSTIC, COMMUNICATION AND properties located on other localities
ELECTRONIC ENGINEERING beside those under Type 2 with a lot
area of over 200 hectares, shall be
• COMPREHENSIVE PLANNING _____.
• PHYSICAL PLANNING
• NONE OF THE ABOVE • P 350,000 PLUS P 1,500 PER HECTARE
IN EXCESS OF 200 HECTARES
For Supplemental Services of an • P 350,000 PLUS P 1,000 PER HECTARE
Architect under Physical IN EXCESS OF 200 HECTARES
Planning Services Schedule of Fee Type
3, the Recommended Professional Fee • P 550,000 PLUS P 1,000 PER HECTARE
for Subdivision Planning for housing IN EXCESS OF 200 HECTARES
on properties located on other • P 550,000 PLUS P 1,500 PER HECTARE
localities beside those under Type 2 IN EXCESS OF 200 HECTARES
with a lot area of the first 100 • NONE OF THE ABOVE
hectares or less, shall be ____.
For Supplemental Services of an
• P 5,000 PER HECTARE Architect under
• P 4,000 PER HECTARE Landscape Design Services and
Acoustic, Communication and Electronic
• P 3,000 PER HECTARE Engineering Services, depending on the
• P 2,000 PER HECTARE magnitude and complexity of the work
• NONE OF THE ABOVE required by the project, the Architect
is paid_____ of the cost of the work.
For Supplemental Services of an • 5% - 10%
Architect under Physical Planning • 10% - 15%
Services Schedule of Fee Type 1, the
Recommended Professional Fee for • 10% - 20%
Subdivision Planning for building • 15% - 20%
sites such as Industrial Estates, • NONE OF THE ABOVE
Commercial Centers, Sports Complexes,
Resorts, etc., and Site Planning of A part of the Supplemental Service of
any complex consisting of several an Architect wherein the Architect is
structures within a contiguous site not merely concerned with the
and with a lot area of the first 50 structure he/she creates but the
hectares or less, shall be _____. surrounding spaces as well and he/she
• P 2,000 PER HECTARE studies the structure in relation with
• P 3,000 PER HECTARE the existing environment and then
consequently designs the surrounding
• P 4,000 PER HECTARE areas of the structure, so that both
• P 5,000 PER HECTARE act as one.
• NONE OF THE ABOVE • INTERIOR DESIGN
• ACOUSTIC, COMMUNICATION AND
For Supplemental Services of an ELECTRONIC ENGINEERING
Architect under Physical Planning
Services Schedule of Fee Type 3, the • LANDSCAPE DESIGN
Recommended Professional Fee for • PHYSICAL PLANNING
Subdivision Planning for housing on • NONE OF THE ABOVE
As the ______ of the project, he/she
is in a better position to
interpret his drawings and documents
and to assure conformity by the
Contractor. He can assign his staff to
undertake the Fulltime supervisory
work to perform the works as
enumerated in the Architect's
Guidelines.
• ARCHITECT IN-CHARGE OF CONSTRUCTION
(Aicc)
• ARCHITECT-OF-RECORD (AoR)
• PROJECT MANAGER (PM)
• CONSTRUCTION MANAGER (CM)
• CONTRACTOR