No. Comments 1. Total TVU 2. ROB Designed for 3. Skew Angle 4. Whether the feasibility has been carried out or not ? 5. Whether the encroachment free Right of Way (ROW) is available? 6. Proposed carriageway width of Bridge/ROB/RUB (including future planning if any). 7. Existing Right of way (EROW) in meters. 8. Proposed Right of way (PROW). Whether proposed ROB is within available ROW. 9. Whether any land acquisition involved? 10. Land demarcation done or not. 11. Whether work is approved in railway work programme. 12. Whether provision of RUB/LHS has been taken in case of ROB? 13. Size of LHS 14. Whether the provision of stair case has been taken in case of ROB? 15. Whether any utility shifting like HT Line/ LT Line is involved including raising for maintenance of requisite clearance? If yes, provision thereof. 16. Whether any forest clearance is involved? If yes, provision thereof. 17. Whether any utility shifting of sewerage/ water pipeline is involved? If yes, provision thereof. 18. Whether the provision for alternate route/diversion road has been taken? 19. Whether the design consultant has certified that the design is economical and a certificate has been incorporated on drawings? 20. Whether all the detailed structural drawings duly proof checked and structural safety certificate received from IIT/NIT/PEC? 21. Whether the detailed plans/GAD/NOC has been approved by the competent authority/Railway? 22. Whether any litigation is ongoing w.r.t. the proposed structure / road? 23. Cost born by state or 50: 50 share basis. Railway portion 24. Total length of R.O.B i/c railway portion 25. Railway boundary 26. Railway span 27. Vertical clearance 28. Total width of ROB in Railway Portion 29. Clear carriage way in Rly. Span 30. Type of Pier 31. Thickness of deck slab. 32. Wearing coat 33. Type of Bearing 34. Type of girder 35. Type of foundation 36. Dia of Pile 37. Depth of Pile PWD portion 38. Width of ROB in PWD portion 39. Clear carriage way 40. P.W.D via duct portion 41. Span arrangement 42. Type of wall 43. Maximum height of RE-wall/ Retaining wall 44. P.W.D Solid fill portion 45. Treatment under approach 46. Type of Girders 47. Thickness of Deck slab 48. Gradient/ Slope 49. FRL 50. RTL 51. Width of Service Lane 52. Crust detail of service road 53. Wearing coat 54. Diversion Plan