You are on page 1of 1

ANY DISCREPANCIES MUST BE REPORTED TO THE ARCHITECT IMMIDIATELY. EMBM PROJECTS....

0737284788
GENERAL
All work is to be done in accordance with the
Na onal Building Regula ons. All materials and GENERAL NOTES
workmanship are to comply with the relevant
S.A.B.S codes and or the specified interna onal
codes where applicable in the Architectural ● THIS DRAWING IS THE COPYRIGHT OF THE ARCHITECT.
specifica ons. ● DO NOT SCALE, REFER PNLY TO FIGURED DIMENSIONS.
● ALL DIMENSIONS AND LEVELS MUST BE CHECKED ON
The contractor shall in all aspects of the works SITE PRIOR TO SETTING OUT.
comply with the provisions of the Occupa onal ● ANY DISCREPANCIES MUST BE REPORTED TO THE
Health and Safety Act, 1993 (Act No 85 of 1993) ARCHITECT IMMIDIATELY.
● ALL BUILDING WORK TO CONFORM TO NATIONAL
and any regula ons promulgated in terms of
BUILDING REGULATIONS
that Act or Factories Machinery and Building
Works Act of 1941.

The contractor shall set up document and


maintain a quality assurance and quality control AREA SCHEDULE
system, in accordance with SANS 9001/ISO
9001, able to be checked to the sa sfac on of EXISTING FLOOR AREA .

the Architect, that all material and ADDITIONAL FLOOR AREA 382.05m2
workmanship, whatever their sources, meet the
requirements of the Specifica on. Should the TOTAL 382.05m2
Contractor or any of his sub-contractors be OUT-BUILDINGS: LAPA .
cer fied to the SANS 9000 family of standards
then monitor these works accordingly. GRAND TOTAL .
21 600
10 660
ERF AREA -
∑ This drawing is not to be scaled, figured 1 000 220 5 000 220 4 000 220 6 340 6 040 F.A.R .
dimensions to be used. 5 540 5 020 220 3 680 220 1 100 220 3 152 220 4 520
∑ All dimensions are in millimeters unless 220 3 000 220 2 100 220 8 920 1 100 220 3 152 1 528 220 4 692 1 148 COVERAGE TAKEN %
otherwise stated. COVERAGE ALLOWED %
∑ All dimensions and levels must be checked
on site by the contractor before pu ng W3
300mm Roof overhang
W9 ROOF LINE W4
work in hand.
220

220

300mm Roof overhang


∑ All work to be executed by competent B.I.C Shr

WC

2 000
persons qualified for the specific trade. EN-SUIT 3
Ceramic Tiles

D1
8,000 m2
GUEST BEDROOM

B
FOUNDATIONS

300mm Roof overhang


Carpet WHB

5 240
ROOF LINE

220
4 940

4 500

All founda ons, founda on walls, retaining 27,990 m2

D7
walls, sub soil stormwater drainage and soil
8.00⁰

6 660

7 260
compac on to Eng’s specs & approval.
220mm walls on min 600(w)x220(h) & 115mm B B B B ARCHITECT'S SIGNATURE
walls on min 450(w)x250(h)strip founda ons

4 000
W8
with 20mpa concrete.
220

D1 BEDROOM 4
1 000 Carpet
16,000 m2 ENGINEER'S SIGNATURE

1 500
SURFACE BED NOTES
0737284788

0737284788
D1
Internal surface bed 85mm 20mpa concrete on B.I.C
dpc & well compacted fill at 150mm layers.

220
D1
Slabs are not to be cast on in-situ material, CLIENT'S SIGNATURE
4 200

WHB

W8

Ceramic Tiles
allow to remove min. 300mm and re-compact in

WC
EN-SUIT 2

300mm Roof overhang


2 200
BEDROOM 3

W4
150mm layers external surface bed 85mm Carpet Ceramic Tiles
6 340

9,724 m2
6,935 m2

300mm Roof overhang


PASSAGE
20mpa concrete as above. 15,456 m2

B
REVISION DESCRIPTION DATE BY NO.
Shr

D1

ROOF LINE
B.I.C

220
4 920
WALL NOTES
ROOF LINE
8 840
220

19 680

6 900
Brickwork: Clay stock keyed to receive plaster

D1

9 883
B.I.C
8.00⁰

D1
finish.

2 500
W4
WC
BEDROOM 2 BATHROOM
220mm brick walls with brickforce every 4 A Carpet
15,456 m2
Ceramic Tiles
7,881 m2
A
Shr
4 200

courses and every courses of 6 over openings to WHB

220
Eng’s spec. & approval. PATIO 1 STOEP
Ceramic Tiles Ceramic Tiles
W8
2 280

11,446 m2 2,688 m2

1 760
SANITARY & DRAINAGE NOTES:

D3
8.00⁰

14 160
Plumber to a ain balanced hot & cold pressure

3 023
ROOF LINE W3 300mm Roof overhang
to ensure the op mum opera on of mixer and
220
220

D7

300mm Roof overhang


28 160

28 160
tap fi ngs. Shr IN NO EVENT SHALL EMBM PROJECTS (PTY) LTD, NOR ITS STAFF BE
B

DINING ROOM LIABLE TO ANYONE FOR SPECIAL, COLLATERAL, INCIDENTAL OR


Ceramic Tiles

Ceramic Tiles

Ceramic Tiles CONSEQUENTIAL DAMAGES IN CONNECTION WITH OR ARISING OUT OF


EDWARD MATLAILA....

EDWARD MATLAILA....
Soil and waste water 110mm uPVC pipe to fall 26,518 m2 THE USE OF THIS DRAWING. THIS DRAWING IS INTENTED AS A GENERAL
3 440
3 000
3 220

EN-SUIT 1
W4

WC

1:60m. REFERENCE SOURCE, ACCURACY CURRENCY, COMPLETENESS AND


9,000 m2

6,300 m2

LOUNGE

4 500
RELEVANCE FOR YOUR PURPOSE AND YOU SHALL OBTAIN ANY

Sink

W5
STUDY

Ceramic Tiles

300mm Roof overhang


28,230 m2 APPROPRIATE PROFESSIONAL ADVISE RELEVANT TO THE PARTICULAR

6 220
Provide C.E’s at every change of direc on. KITCHEN CIRCUMSTANCES TO THIS PROJECT

7 260
WHB Ceramic Tiles
Waste and SW pipe under the floor slab to be 26,608 m2
220

D1 D1
encased.

300mm Roof overhang


ROOF LINE
1 300
Ceramic Tiles
MAIN BEDROOM
B.I.C
ROOF LINE

Ceramic Tiles

All waste pipes to have 65mm re-seal traps and

220
2 780
2 780

D1
B.I.C
7,784 m2

be accessible over en re length for cleaning


5,243 m2
PASSAGE
2,724 m2
Carpet

PASSAGE

PANTRY

220 1 500
repairs. D4

W2
Ceramic Tiles
W7 1 300 300mm Roof overhang
220 830

5,970 m2
W6

12 760
3 440

16 580
PLUMBING & DRAINAGE KEYS
220

D1
2 640

W10 8.00⁰
installed to comply with
BEAM ABOVE

∑ Bath=Bath STORAGE

1 500
W2
Combination fire door

Power floated
∑ WC=Water Closet 5,970 m2
D2

fire regulations

300mm Roof overhang


220
220
Shr=Shower MAIN BEDROOM
COVERED D1
ENTRANCE FIRE WALL
∑ WHB=Wash Hands Basin Carpet
34,320 m2 BEAM ABOVE
D6
5 940
5 500

6 540
∑ SINK=Sink
5 940

300mm Roof overhang


∑ G=Gulley
∑ C.E=Cleaning Eye Firm: EMBM Projects Contacts

8 240
8.00⁰ Address: Cell:
DOUBLE GARAGE
Power floated

∑ I.E=Inspec on Eye
D5

6 000
6 000
ROOF LINE

No 7 Kittyhawk street 0737284788



36,000 m2

R.E=Rodding Eye
Rhodesfield Email:
∑ I.L=Invert Level Kempton Park Edward.matlaila19@gmail.com
220
220

W11 W1 W11 300mm Roof overhang


∑ OVP=Open Vent Pipe 1619
W10 A A
∑ MC=Municipal Connec on
ROOF LINE

∑ PVC=Poly Vinyl Chloride PROJECT


∑ uPVC=Unplas cized Poly Vinyl
220
220

D8
Chloride use window 10 with 1800 x2400
in place of W1 , W11 NEW BUILDING
Ramp to fall
Client : Anotida Tuna Mpofu
ELECTRICAL KEYS Address :
Single Light Switch Add window 1 on centre of garage 4 420 1 620
Window is available at home 5 512 1 528
Double Light Switch 2400x600 6 340 7 040

ROOF PLAN 1:100 DESCRIPTION


External Wall Light 2 020 220 2 800 220 980 220 4 180 4 740 1 780 220 4 000 220
720 220 5 300 220 4 400 4 300 220 6 000 220 Ground Plan and Roof Plan
Double Plug Switch 6 460 6 620 2 080 6 440
21 600

Single Plug Switch GROUND FLOOR 1:100


Weather tight ceiling mouted light ROOF NOTE:
SHEET METAL
Ceiling mounted light CHROMADEK ROOF SHEETING COLOUR CHARCOAL, ON
38x50mm SAP PURLINS @ 1200mm c/c, ON 38 x 114mm SAP
RAFTER. TRUSSESS SUPPORTED ON 38 x 114mm SAP WALL
Downlight PLATES, & TIED DOWN WITH GALVANIZED HOOP IRON WIRE
ANCHORS (MIN. 4x BRICK COURSES DOWN)
Flourescent Light DATE SCALE
R.C ROOF SLAB
RC ROOF SLAB AS PER ENGINEER TO BE SCREEDED (Min.
2021/05/24 A1 | 1:100
Stove Point 30mm THICK) TO FALL TO RAIN WATER OUTLET POINT. DRAWN BY CHECKED BY
Distribution Board
WATERPROOFING BY SPECIALIST
EDWARD .
MATLAILA
DRAWING NUMBER REV SHEET NO:
*PLEASE NOTE: ALL DRAWINGS ARE TO BE READ IN CONJUCTION WITH EACH OTHER. DIMENSIONS AND SPECIFICATIONS ARE TO BE CONFIRMED ON SITE AND WITH RELEVANT PROFESSIONALS BEFORE MANUFACTURE OR PRODUCITON. MOD1 01 OF 02

EMBM PROJECTS.... 0737284788