BABA FARID COLLEGE OF ENGINEERING & TECHNOLOGY, BATHINDA

Projects Description Performa


Name of Name of Mentor Name of Co-Mentor Students Co-ordinator Members Name of Related Industry (in
Project nearby Area)
Pardeep Kumar
Abhey Verma Chamkaur Singh
Bhupinder Singh
Super Cooler Dr. Harinder Singh Arshdeep Singh Air Cooler Manufacturing units

1 Objectives of Project:-
a___________ To reduce the consumtion of electric energy as compared to AC
b___________ To eliminate the consumption of water by using a closed heat exchanger system.
c. To provide a economic option to the economic weaker section to enjoy the cool air in scrotching summmers.
d.
2 Outcomes of Project:- (Research Publication/ Patent)
a___________ A patent can be filed as well as research paper can be published.
b___________ The modified deisgned air cooler may be installed in some of the offices and hostels of BFGI.
c___________________________________________________________________________________________
3 Cost demnaded along with detail description:-
S.no Item Name Cost
Proposed Vendors along with Address
Air Cooler 4000/- To be purchased from local market
Refrigerator compressor assembly 4000/- To be purchased from local market
Bombay Metals & Alloys, Gill Rd, opposite SBI Bank, Miller
Heat exchanger aluminum pipes 10,000/-
Ganj, Ludhiana, Punjab 141003

Metal sheet 1000/- To be purchased from local market

a Equipment (*) - (60% of total cost demanded):- Nil


b Field visit - (10% of total Cost):- Nil
Bombay Metals & Alloys, Gill Rd, opposite SBI Bank, Miller
c Consumable - (20% of total Cost):- 2000/- Ganj, Ludhiana, Punjab 141003

d Contingency - (10% of total Cost):- 1000/-


Total Cost= 22,000/-
* Kindly note that equipment demand must not be available in BFGI.

4 Duration of Project - Dec 21- Apr 22

5 Month of Completion of 1st Phase 15-Apr-24

6 Month of Completion of final Phase 30-Apr-24


7 Progress Chart:-
Months
Activity schedule

Activity 1 Purchasing the required material 1 April, 2024 to 5 April, 2024

Activity 2 Prearation of air cooler body as per design 6 April to 8 April, 2024

Activity 3 Disassmbly of refrigerator comressor unit 6 April to 8 April, 2024

Activity 4 Assembly of refirgerator unit with air cooler 9 April to 15 April, 2024

Activity 5 preparation of heat exchanger and assembly 16 April to 30 April, 2024

Report writing and


submission
Name of HOD :- Mr. Kovid
Name of Mentor :- Name of Research faculty:- Dr. Harinder Singh
Sharma

Signature Signature Signature

Decision of Screening committee as per project Evaluation.

a) Total cost to be disbursed:- __________________________________________________________________

b) Recommended Amount to be disbursed during 1st phase (1st Installment ) :-_____________________________

b) Recommended Amount to be disbursed during final phase (2nd Installment ) :-____________________________

(Dean R & D) HoD Project Engineer