KATHMANDU- TERAI/MADHESH FAST TRACK (EXPRESSWAY) ROAD PROJECT

Contract Package – 6

Ch.41+000 to Ch.49+818.82

CONCEPTUAL DESIGN DRAWINGS

SUBGRADE AND PAVEMENT

PROJECT NAME: CLIENT: CONTRACTOR:

Kathmandu Terai/Madesh Fast Track (ExpressWay) Kathmandu- Terai/Madhesh Fast Track (Expressway)
Road Project Road Project,
Ch.41+000 to Ch.49+818.82 Nepali Army, Government of Nepal

Issue Date: April 22, 2023


KATHMANDU
TYPICAL CROSS SECTION
≥500

Catch drain

1:V
ari
es
200
GL

2400
Platform drain 250 375 375 50 300 50 375 375 250 50

central median
Hard shoulder

Curb SHY

Curb SHY

Hard shoulder

Curb SHY
Driveway Driveway Driveway Driveway

1:V
Varies

arie
s
Detail "B"
Design elevation CL Design elevation
Berm Detail "A"
Detail "D"
2.5% 2.5%

1:1
Side ditch .5 100
Step to be cut
4% Berm

≥200

Detail "C"
Drain

Detail "D"
300 50
24.1
8.4 4.210
1.5
R=20 Non-woven geotextile

60
15

2.5% 20

Natural gravel
30

(2~4cm) 40 HDPE perforated drainage pipe


24.1 (Φ20cm)

Detail "A" Detail "B" Detail "C"


250 50
Driveway Hard shoulder 100 152 30
50
1:n

1:n 60

20
100+h Non-woven geotextile Gravelly Soil 25

5
15 70+h 15
60

1:
1
20

1:0.3
1:n
NOTE

70
Natural gravel
90+h
60+h

105
(2~4cm) 40 HDPE perforated drainage pipe
Surface T=5cm 1. All dimensions are in centimeter unless noted otherwise.
(Φ20cm)

20
2. The width of the excavated slope platform is generally

10
DMB T=15cm
10

Base T=20cm 1.5m, which can be widened appropriately according to


Sub-base T=35cm the geological conditions.

DESIGNED BY:
CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023
VERIFIED BY:
YOO S
E
N
H
NIG
NE
IEN
RG
ICO R P
ORA
O
K
T
O
IN
R
,E A Construction of Double Lane Dual Carriageway (CONTRACTOR)
GOVERNMENT OF NEPAL KORE A
X
P RE
S S
W AC
YO RP
ORA
O
K
T
OINR
,EA Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE PYU
N G
H WE A
N
G
N E
IENRG
IC
ONS
UL
T
A K
N
LO
T
DR
,EA RECOMMENDED BY:
A
N
S
IS
V
JOA
O
C
TIW
NT
HI Stabilization, Interchange, Toll Plaza and Allied TYPICAL CROSS SECTION
NEPALI ARMY shown (CONTRACTOR)
G A
M
N
RTIE
A
RNA
OTIN
D
AL
EGSIA
N
S SO
AC
T
IE
N
S
EN
P
P
E
A V
L
P
T
,D
A
.L
. Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL T
S
AIR
C
A
O N
S UL
TAN
N
P
E
T
VL
P,T
D
A
.L. APPROVED BY: SHEET No : 1/3
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
≥500

TYPICAL CROSS SECTION


(MEDIAN DRAINAGE SECTION)
Catch drain

1:V
ari
es
200
GL

2400
Platform drain 250 375 375 50 300 50 375 375 250 50

central median
Hard shoulder

Curb SHY

Curb SHY

Hard shoulder

Curb SHY
Driveway Driveway Driveway Driveway

1:V
Varies

arie
s
Design elevation CL Design elevation
Berm
Detail "A" N%

1:1
.5
Side ditch 100
Step to be cut
4% Berm

≥200
Detail "B" Cover (580X830)
Drain Detail "C"
Steel Plate installation
on the outside
(integrated cover) 830
Cover 40 6 6 Anchor (50X6X150) Detail"C"
C.T.C :500
20
75

75

580
(cover support)
70X75 5
65 80

Detail "A" S = 1:40 Concept of Detail "A"

75
750 500 0

Cover (580X830)
Detail"B" 50
0

CURB SHY

D200

)
0 ula tion
500n calc
D600 pend
o NOTE
150 450 150 (De
50 1. In addition to the typical section of the mark in centimeters,
750 0
others are measured in millimeters
2. Covers can be used in various types of products that satisfy
standards,specifications, and water collection efficiency.
DESIGNED BY:
CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023
VERIFIED BY:
YOO S
E
N
H
NIG
NE
IEN
RG
ICO R P
ORA
O
K
T
O
IN
R
,E A Construction of Double Lane Dual Carriageway (CONTRACTOR)
GOVERNMENT OF NEPAL KORE A
X
P RE
S S
W AC
YO RP
ORA
O
K
T
OINR
,EA Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE PYU
N G
H WE A
N
G
N E
IENRG
IC
ONS
UL
T
A K
N
LO
T
DR
,EA RECOMMENDED BY:
A
N
S
IS
V
JOA
O
C
TIW
NT
HI Stabilization, Interchange, Toll Plaza and Allied TYPICAL CROSS SECTION
NEPALI ARMY shown (CONTRACTOR)
G A
M
N
RTIE
A
RNA
OTIN
D
AL
EGSIA
N
S SO
AC
T
IE
N
S
EN
P
P
E
A V
L
P
T
,D
A
.L
. Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL T
S
AIR
C
A
O N
S UL
TAN
N
P
E
T
VL
P,T
D
A
.L. APPROVED BY: SHEET No : 2/3
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
TYPICAL CROSS SECTION
(INTERCHANGE SECTION) -Ramp A
1600
1500

50 250 375 50 150 50 375 250 50

central median
Curb SHY

Hard shoulder

Curb SHY

Curb SHY

Hard shoulder

Curb SHY
Driveway Driveway

CL

2.5% 2.5%

.5
1:1
100
1:1
.5
Berm

800
Drain GL
200
4%

1:1
.75 100

Berm

TYPICAL CROSS SECTION


(INTERCHANGE SECTION) - Ramp B, C, D, E Drain

875

775

50 250 375 150 50

Curb SHY

Hard shoulder

Hard shoulder

Curb SHY
Driveway

2.5%

100
.5
1:1
1:1
Berm .5

800
Drain GL
200
4%
100

1:1
.75
Berm

Drain
NOTE
1.All dimensions are in centimeter unless noted otherwise.

DESIGNED BY:
CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023
VERIFIED BY:
YOO S
E
N
H
NIG
NE
IEN
RG
ICO R P
ORA
O
K
T
O
IN
R
,E A Construction of Double Lane Dual Carriageway (CONTRACTOR)
GOVERNMENT OF NEPAL KORE A
X
P RE
S S
W AC
YO RP
ORA
O
K
T
OINR
,EA Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE PYU
N G
H WE A
N
G
N E
IENRG
IC
ONS
UL
T
A K
N
LO
T
DR
,EA RECOMMENDED BY:
A
N
S
IS
V
JOA
O
C
TIW
NT
HI Stabilization, Interchange, Toll Plaza and Allied TYPICAL CROSS SECTION
NEPALI ARMY shown (CONTRACTOR)
G A
M
N
RTIE
A
RNA
OTIN
D
AL
EGSIA
N
S SO
AC
T
IE
N
S
EN
P
P
E
A V
L
P
T
,D
A
.L
. Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL T
S
AIR
C
A
O N
S UL
TAN
N
P
E
T
VL
P,T
D
A
.L. APPROVED BY: SHEET No : 3/3
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
GENERAL FILL SUBGRADE

B/2 B/2

Protection through
spreading grass planting

To provide grass sodding for


1:1 100
protection in the arch skeleton .5
800

4%

centerline
.5
1:1

200
4%

To provide grass sodding for 4% Drain


protection in the arch skeleton

200
800

.75
1:1
200
To provide grass sodding for
protection in the arch skeleton 4%
4%

200

1:2

NOTE
1. All the dimensions in this drawing are expressed in centimeter.
2. This drawing is applicable to the general fill sections.
3. When the embankment slope is above 8.0 m high, the stepped slope shall be made, with the slope gradient 1:1.5
within 8.0 m below the subgrade margin. For the slope below 8.0 m high, slope gradient 1:1.75 is employed, with a
2.0 m wide platform provided at the grade change point.
4. For soil fill or mixed soil-rock fill embankment, when the slope is less than 3.0 m high, protection will be done with
grass sodding; When the slope is above 3.0 m but below 20.0 m high, protection will be done with arch skeleton;
When the slope is above 20 m high, a stable slope type shall be determined through analysis and calculation.

CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023

Construction of Double Lane Dual Carriageway (CONTRACTOR)


GOVERNMENT OF NEPAL
Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE
Stabilization, Interchange, Toll Plaza and Allied GENERAL SUBGRADE DESIGN
NEPALI ARMY shown (CONTRACTOR)
Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL SHEET No : 1/10
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
HALF-FILL HALF-CUT SUBGRADE

500

Catch drain

B/2 B/2

1:
m
1:1

Subgrade centerline
.5
4%

200

NOTE
1. All the dimensions in this drawing are expressed in centimeter.
2. This drawing is applicable to the section of half-fill half-cut subgrade.

CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023

Construction of Double Lane Dual Carriageway (CONTRACTOR)


GOVERNMENT OF NEPAL
Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE
Stabilization, Interchange, Toll Plaza and Allied GENERAL SUBGRADE DESIGN
NEPALI ARMY shown (CONTRACTOR)
Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL SHEET No : 2/10
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
≥500

Catch drain

Slope protection
EXCAVATION SUBGRADE

≤1200

1:
m
4
200

4%

Platform catch drain

1:m
3
800
Slope protection

200

4%

Platform catch drain

1:m
800

2
Slope protection

Subgrade centerline
200

4%

Slope protection

1:m
1
800
B/2 B/2

1:n
Berm Berm
50 50

4%
NOTE 4%

1. The dimensions in this drawing are expressed in centimeter, both m and n represent slope gradients.
Side ditch
2. The gradient of the excavation slope is determined based on the following principles: Side ditch
(1) For the slope of earth, the Quaternary eluvial layer or the fully weathered rock, the gradient is usually
1:1.0 to 1:1.25;
(2) For the slope of the strongly weathered rock, the gradient is usually 1:0.5 to 1:0.75;
(3) For the slope of the moderately weathered ~ slightly weathered rock, the gradient is 1:0.3 to 1:0.5;
(4) For the slope of the soft rock, such as sandstone or shale, a more gentle gradient is taken.
3. Principles for protection of excavation slopes:
(1) The protection type (skeleton, grass sodding) in one section of the slope shall be simple as far as
possible, and selected based on the slope gradient;
(2) When the slope gradient is 1:1, for the earth and the fully weathered rock, when the slope height is less
than 3 m, protection is done with grass sodding; When the slope height is above 3 m (or more than two
stages), protection is done with the window-type facing wall or arch skeleton.
(3) When the slope gradient is 1:0.75, protection is done with the arch skeleton;
(4) When the slope is less than two stages and the gradient of the lower stage is 1:0.5, no protection is
done or active protection is done pointedly based on the conditions of the slope.
(5) For the high slope (rock slope >30 m, or earth slope >20 m), a comprehensive slope protection
scheme shall be made based on the slope stability calculation.

CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023

YOOSHIN ENGINEERING CORPORATION, KOREA Construction of Double Lane Dual Carriageway


GOVERNMENT OF NEPAL KOREA EXPRESSWAY CORPORATION, KOREA
(CONTRACTOR)
Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE PYUNGHWA ENGINEERING CONSULTANT LTD, KOREA
JV IN ASSOCIATION WITH Stabilization, Interchange, Toll Plaza and Allied GENERAL SUBGRADE DESIGN
NEPALI ARMY shown (CONTRACTOR)
GARIMA INTERNATIONAL DESIGN ASSOCIATES NEPAL PVT.LTD., NEPAL Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL SITARA CONSULTANT PVT.LTD., NEPAL SHEET No : 3/9
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
SUBGRADE OF RETAINING WALL
B/2 B/2

centerline
STONE MASONRY WALL

gravity shoulder wall

B/2 B/2

1:1
.5~

centerline
1:1
.75

AH
SHOULDER WALL

Inclined embankment wall

NOTE
1. All the dimensions in this drawing are expressed in centimeter. B represents the subgrade width, and AH represents the fill height at the wall top.

CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023

Construction of Double Lane Dual Carriageway (CONTRACTOR)


GOVERNMENT OF NEPAL
Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE
Stabilization, Interchange, Toll Plaza and Allied GENERAL SUBGRADE DESIGN
NEPALI ARMY shown (CONTRACTOR)
Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL SHEET No : 4/10
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
DESIGN PLAN FOR SUBGRADE TREATMENT AT BRIDGE APPROACH (FILL)

L0

500
Bridge deck pavement
Transition slab at bridge
approach

Pavement structure

Bridge Subgrade

Embankment

H
Backfill the gravel soil with the degree
of compaction no less than 95% MDD 4%

1:i

Step to be cut

200

Ground line
200

DESIGN PLAN FOR SUBGRADE TREATMENT AT BRIDGE APPROACH (EXCAVATION)

Ground line

1000

500
Bridge deck pavement
Transition slab at
bridge approach

Pavement structure

Backfill the gravel soil after over-cut with the degree of

50
Bridge compaction no less than 95% MDD. Subgrade

NOTE
1. All the dimensions in this drawing are expressed in centimeter. H represents the height for treatment of the approach subgrade.
2. Slope rate i shall be determined according to the actual situation on site.
3. Transition sections shall be made at the junctions between the pavement and abutment, and between the
pavement and culvert abutment back, filled with gravel soil, with the degree of compaction no less than 95% MDD.
4. The excavation abutment shall be over cut to 50 cm below the pavement bottom, and replaced with gravel soil,
with the degree of compaction no less than 95% MDD.
5. The location which is hard to be compacted shall be compacted layer by layer with a small compaction machine so
as to ensure the degree of compaction.

CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023

Construction of Double Lane Dual Carriageway (CONTRACTOR)


GOVERNMENT OF NEPAL
Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE
Stabilization, Interchange, Toll Plaza and Allied GENERAL SUBGRADE DESIGN
NEPALI ARMY shown (CONTRACTOR)
Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL SHEET No : 5/10
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
DESIGN DRAWING OF BACKFILL TREATMENT FOR CULVERT ABUTMENT IN SOIL AREA (I)

Pavement structure

The same requirements as those for the corresponding


portion of the subgrade

50
Backfill the gravel soil with the degree of
Backfill the gravel soil with the degree of compaction compaction no less than 95% MDD
no less than 95% MDD

H
1:i 1
1 1:i
4% 4%
Step to be cut Step to be cut

150 150

Ground line
150 L 150

DESIGN DRAWING OF BACKFILL TREATMENT FOR CULVERT ABUTMENT IN SOIL AREA (II)

Pavement structure

The same requirements as those for the


corresponding portion of the subgrade

50
Backfill the gravel soil with the degree of
Backfill the gravel soil with the degree compaction no less than 95% MDD
of compaction no less than 95% MDD
H

H
1:i 1
1 1:i
4% 4% Step to be cut
Step to be cut
150 150

Ground line
150 L 150

NOTE
1. All the dimensions in this drawing are expressed in centimeter. H represents the height for treatment.
2. The drawing is suitable for backfill treatment for culvert abutment in soil area.
3. Slope rate i1shall be determined according to the actual situation on site.
4. Transition sections shall be made at the junctions between the pavement and
abutment, and between the pavement and culvert abutment back, filled with gravel
soil, with the degree of compaction no less than 95% MDD.
5. The location which is hard to be compacted shall be compacted layer by layer
with a small compaction machine so as to ensure the degree of compaction.

CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023

Construction of Double Lane Dual Carriageway (CONTRACTOR)


GOVERNMENT OF NEPAL
Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE
Stabilization, Interchange, Toll Plaza and Allied GENERAL SUBGRADE DESIGN
NEPALI ARMY shown (CONTRACTOR)
Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL SHEET No : 6/10
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
DESIGN DRAWING OF BACKFILL TREATMENT FOR CULVERT ABUTMENT IN ROCKY AREAS (III)

Pavement structure

The same requirements as those for the corresponding


portion of the subgrade

50
Backfill the gravel soil with the degree of
Backfill the gravel soil with the compaction no less than 95% MDD
degree of compaction no less than
95% MDD

1:
H

H
i2
i2

1:
Ground line
150 L 150

DESIGN DRAWING OF BACKFILL TREATMENT FOR CULVERT ABUTMENT IN ROCKY AREAS (IV)

Pavement structure

The same requirements as those for the


corresponding portion of the subgrade

50
Backfill the gravel soil with Backfill the gravel soil with the degree of
the degree of compaction compaction no less than 95% MDD
no less than 95% MDD
H

H
1:
i2

Ground line
150 L 150

NOTE
1. All the dimensions in this drawing are expressed in centimeter. H represents the height for treatment.
2. The drawing is suitable for backfill treatment for culvert abutment in rocky area.
3. Slope rate i2shall be determined according to the actual situation on site.
4. Transition sections shall be made at the junctions between the pavement and
abutment, and between the pavement and culvert abutment back, filled with gravel
soil, with the degree of compaction no less than 95% MDD.
5. The location which is hard to be compacted shall be compacted layer by layer
with a small compaction machine so as to ensure the degree of compaction.

CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023

Construction of Double Lane Dual Carriageway (CONTRACTOR)


GOVERNMENT OF NEPAL
Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE
Stabilization, Interchange, Toll Plaza and Allied GENERAL SUBGRADE DESIGN
NEPALI ARMY shown (CONTRACTOR)
Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL SHEET No : 7/10
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
CROSS SECTION OF TREATMENT FOR EARTH SUBGRADE
EXCAVATION AND FULLY-WEATHERED ROCK EXCAVATION

Ground line

B/2 B/2

n
Excavation

1:
1:
n
Pavement

50
subgrade

Backfill the gravel soil after cut

CROSS SECTION OF LOW-FILL SUBGRADE TREATMENT

B/2 B/2

Original ground
Pavement

1:1
.5
5

H<125
1. subgrade
1:
50

1
1:
1:
1

Backfill the gravel soil after cut


NOTE
1. All the dimensions in this drawing are expressed in centimeter. B represents the

subgrade width, and n represents the gradient of the excavation slope.

2. This is a design drawing of the low-fill shallow-cut subgrade.

3. For the low-fill subgrade with embankment height H less than 1.25m, over-cut to H

equals 1.25m, and compaction is carried out before backfilling, so as to ensure that

the degree of compaction is no less than 95% MDD from 0 to 50 cm below the

pavement base course.

CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023

Construction of Double Lane Dual Carriageway (CONTRACTOR)


GOVERNMENT OF NEPAL
Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE
Stabilization, Interchange, Toll Plaza and Allied GENERAL SUBGRADE DESIGN
NEPALI ARMY shown (CONTRACTOR)
Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL SHEET No : 8/10
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
SCHEMATIC DIAGRAM FOR MULTI-STEP STEEP SLOPE EMBANKMENT SLOPE

Pavement

20 200 Fill subgrade

.5

200
1:1

200
3%

20 200

200
.75
1:1

200
Geogrid

200 DETAIL OF ANCHOR REINFORCEMENT


20 200

10

1:2

200
200

70

30
NOTE
1. The geogrid is applicable to the fill slope of which the gradient is above 1:5. B represents the

subgrade width. The layers and spacing shall be determined based on the slope stability calculation.

2. The soil surface to be laid with geosynthetics shall be even and flat, free of any sharp and hard

projections such as gravel or block stone. For the embankment filler within 8 cm to the geosynthetics,

the maximum grain size shall be no more than 6 cm.

3. When the geogrid is laid, it shall be tensioned as far as possible, if necessary, fix the geogrid in the

fill soil surface with nails.

4. The geogrid is laid to the vicinity of the staggering line of the steps horizontally. The same degree

of compaction and requirements for subgrade soil fill apply.

CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023

Construction of Double Lane Dual Carriageway (CONTRACTOR)


GOVERNMENT OF NEPAL
Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE
Stabilization, Interchange, Toll Plaza and Allied GENERAL SUBGRADE DESIGN
NEPALI ARMY shown (CONTRACTOR)
Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL SHEET No : 9/10
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
DETAIL OF ANCHOR REINFORCEMENT DETAIL OF LONGITUDINAL BLIND DRAIN
SECTION VIEW A OF HALF-FILL HALF-CUT SUBGRADE DETAIL OF TRANSVERSE BLIND DRAIN
(EARTH EXCAVATION)
Cover inverted filter with geotextile Cover inverted filter with
B 120
10 at the inner side and on the top 120 geotextile on the top

Excavation and backfilling

1:
n

1:0
500 500 Geogrid

1:0
Excavation Road trough line

.5
60
.5

.5

60
.5

1:0

1:0
Transverse blind drain 70 Grit (pebble) or gravel Grit (pebble) or gravel

30
120
Cover the two sides and the base

60

60
1:1 60
.5 Cover the outside and the base with a 60 with three layers of a compound
compound geo-membrane geo-membrane
General fill zone

Longitudinal blind catch drain Bench cut


PROFILE
Original ground

Geogrid

CROSS SECTION B OF HALF-FILL HALF-CUT SUBGRADE 1500


Design longitudinal section
750 Pavement

WORK QUANTITY PER LINEAR METER

80
150
B

Fill Bench cut Cut-and-fill boundary after excavation

Excavation 200 Name Unit Quantity


1:
n

1500
Road trough line
2
Excavation and backfilling Geogrid Geogrid (two layers) m /m 2L
500 100
PLAN Steel anchor (earth, two
Transverse blind drain
layers)
120

kg 0.58
60

General fill zone


60

1:1
Blind catch m3 / m 0.54
.5 Blind drain gravel
drain
Longitudinal blind catch drain Reverse filtration
Bench cut
geotextile m 2/ m 1.87

Compound
Fill-excavation interface geo-membrane m 2/ m 1.27

PLAN OF HALF-FILL HALF-CUT SUBGRADE Blind drain gravel m 3/ m 0.54

B = subgrade width Blind drain


Cut-and-fill boundary after excavation Reverse filtration
geotextile m 2/ m 1.20
L = length to be treated with geogrid

Compound
geo-membrane m 2/ m 1.94
50 100
300

Geogrid
150 150

Blind drain
60 cm x 60 cm NOTE
One at the interval of 20 m
300

1. All the dimensions in this drawing are expressed in centimeter. B represents the subgrade
width. The treatment width shall be L=5 to 10 m based on the actual width of the fill zone.
2. This is a design schematic for treatment at the junction of the half-fill half-cut subgrade. This
300

drawing is applicable to the half-fill half-cut subgrade having steep natural transverse gradient
if the excavation zone is composed of soil. When the distance from the road trough bottom to
outer margin of the fill earth shoulder is more than B/2, treatment shall be done according to
300

Cross Section A; When the distance from the road trough bottom to outer margin of the fill
earth shoulder is less than B/2, treatment shall be done according to Cross Section B;
300

3. The 120 cm thick soil layer at the excavation zone under the geogrid shall be over
cut and backfilled (with middle and fine stone soil from excavation).
4. At the interfaces between transverse and longitudinal fill-cut, the original ground shall be cut
150

to the step shape, with step width no less than 2 m, tilting towards the inner side at gradient 3%.
5. When the geogrid is laid, the excavation side shall be anchored effectively with anchors made

Side ditch 50 it shall be backfilled.


100 60 cm x 60 cm blind catch drain

CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023

Construction of Double Lane Dual Carriageway (CONTRACTOR)


GOVERNMENT OF NEPAL
Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE
Stabilization, Interchange, Toll Plaza and Allied GENERAL SUBGRADE DESIGN
NEPALI ARMY shown (CONTRACTOR)
Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL SHEET No : 10/10
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
SHOULDER WALL
SUMMARY OF CROSS
50 SECTION DIMENSIONS AND
MAIN QUANTITY PER LINEAR
M25 concrete
i% METER OF SHOULDER WALL
4%

Shoulder wall Top width B1 Mortar rubble M25 concrete

50
height H
3 3
(m) (m) (m ) (m )
100≤H≤200

1 0.8 0.47 0.25

1.5 1.0 1.1 0.25


p

2.0 1.0 1.6 0.25

@5m Ø5 cm weep hole

1:5

B1
CRRM IN MM5
LIST OF OFFSET WIDTH
Geological conditions for the
foundation Offset width P (m)

Relatively intact hard rock 0.25~0.50

General hard rock 0.60~1.50

Soft rock 1.00~2.00

Soil property 1.50~2.50

NOTE
1. All the dimensions in this drawing are expressed in centimeter.

2. The shoulder wall is applicable to the half-fill half-cut section of small fill quantity at the steep slope area. When it is

hard to fill because the hillside stretches far, the filler used behind the shoulder wall shall be hard stone material, and

the foundation shall be set on the rock or hard coarse soil; Embedded depth of the foundation below the frost line is

equal to or bigger than 0.25 m but no more than 1 m.

3. M25 cast-in-place concrete was used at the top 50 cm of the wall; and Mortar rubble was used at the bottom

, pointed with M10 cement mortar, with the comprehensive strength of the stone material no less than 30 MPa.

4. On the wall body, a 2 cm wide settlement joint is provided at the interval of 10 to 15 m, filled with asphalt-soaked with

the depth no less than 15 cm by inserting from three sides such as inner, outer and top.

5. For B/2+W, B represents the width of a typical subgrade, and W represents the widening value of the subgrade.

DESIGNED BY:
CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023
VERIFIED BY:
YOO S
E
N
H
NIG
NE
IEN
RG
ICO R P
ORA
O
K
T
O
IN
R
,E A Construction of Double Lane Dual Carriageway (CONTRACTOR)
GOVERNMENT OF NEPAL KORE A
X
P RE
S S
W AC
YO RP
ORA
O
K
T
OINR
,EA Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE PYU
N G
H WE A
N
G
N E
IENRG
IC
ONS
UL
T
A K
N
LO
T
DR
,EA RECOMMENDED BY:
A
N
S
IS
V
JOA
O
C
TIW
NT
HI Stabilization, Interchange, Toll Plaza and Allied DESIGN OF RETAINING WALL
NEPALI ARMY shown (CONTRACTOR)
G A
M
N
RTIE
A
RNA
OTIN
D
AL
EGSIA
N
S SO
AC
T
IE
N
S
EN
P
P
E
A V
L
P
T
,D
A
.L
. Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL T
S
AIR
C
A
O N
S UL
TAN
N
P
E
T
VL
P,T
D
A
.L. APPROVED BY: SHEET No : 1/4
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
STONE MASONRY WALL EXPANSION JOINT DETAILS

C
L
20mm WIDE EXPANSION JOINT
ROAD SURFACE

Weep hole EXISTING GROUND LINE

CRRM WALL
10:1(V:H) CRRM WALL

5%
25cm THICK FILTER MATERIAL

GEO-TEXTILE(FILTER)

COMPACTED IMPERVIOUS FILL 50cm WIDTH OF GEOTEXTILE IS TO BE PLACED FOR FULL


HEIGHT ON INNER SIDE OF THE WALL.

1:10(V:H)

SUMMARY OF CROSS SECTION DIMENSIONS AND MAIN QUANTITY


PER LINEAR METER OF STONE MASONRY WALL

Wall height (H) Width of the wall toe Height of the wall toe Bearing capacity
(m) Top width Bottom width (m) (m) Volume of the masonry (kpa)
b (m) B(m) (m3)

NOTE
1. All dimensions are in cm except otherwise mentioned.
2. Safety blocks to be provided where the wall height is more than 3.0 m.
3. Expansion Joint is to be provided at a maximum distance of 10.0 m C/C .
4. CRRM means Coarsed Random Rubble Masonry.

The lowest row of the holes shall be 30 cm higher than the ground. And an inverted filter is provided after the holes.
6. For backfilling at the retaining wall back, filling materials with good permeability and the inner friction angle no less than

CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023

Construction of Double Lane Dual Carriageway (CONTRACTOR)


GOVERNMENT OF NEPAL
Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE
Stabilization, Interchange, Toll Plaza and Allied DESIGN OF RETAINING WALL
NEPALI ARMY shown (CONTRACTOR)
Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL SHEET No : 2/4
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
GRAVITY SHOULDER WALL A-A
Guard fence
A

Guard fence
B/2+W
50

Foundation of the concrete guard fence

20

50
1:0.4
Alignment centerline
200~300
Settlement joint Settlement joint

H1
Width: 2 cm Width: 2 cm 4%
Weep hole
B3

H
200~300
Weep hole

Inverted filter of crushed gravel

Ø16 steel mesh

H
4%

1:0.05
1:0.2
h
M20 rubble concrete

5
4%

30
30
A 1000~1500
Seepage-proofing geotextile
Ø20 steel mesh
Ø16 steel mesh bo1
bi2 bi1

ho1
bo2

hi1

ho2
NOTE

hi2
1:10
1. Except for the steel bar dimension unit is millimeter,other dimensions in this drawing are expressed in centimeter. B2

2. This drawing is applicable to the sections for which the slope gradient is limited outside the subgrade ;

3. The wall body is made of M20 rubble concrete, with the compressive strength of the stone material no less than 30 MPa, and the wall top is made of

M30 cast-in-situ concrete.

4. On the wall body, a 2 cm wide settlement joint is provided at the interval of 10 to 15 m, filled with asphalt-soaked with the depth no less than 15 cm by

inserting from three sides such as inner, outer and top;

5. Drain holes are provided along the wall at the interval of 2 to 3 m which are buried with a Ø10 cm PVC pipe in advance. The lowest row of the holes

shall be 30 cm higher than the ground. And an inverted filter is provided after the holes.

6. The 30 cm thick gravel inverted filter is provided on the wall back. Below the inverted filter, one layer of 50 cm wide impermeable geotextile is laid

along the alignment in the whole length.

7. For backfilling at the retaining wall back, filling materials with good permeability and the inner friction angle no less than 38° shall be used, and the

filling layer by layer can be done only after the strength of the masonry reaches 70%;

8. During construction, attention shall be paid to linking with the guard fence, and location of the prepared guard fence foundation;

9. During construction, the wall height or length may be adjusted properly when the topographical or geological conditions change.

10. For B/2+W, B represents the width of a typical subgrade, and W represents the widening value of the subgrade.

11.The bottom surface of the retaining wall foundation should be set at a place not less than 1.5m below the natural stable bearing layer. The base stress

of the retaining wall should meet the design requirements. If some sections cannot meet the design requirements, the foundation can be tamped or

expanded, and the bearing capacity test can be carried out to ensure the strength of the foundation.

12. When the height of retaining wall H≥8m, two layers of 2m wide Ø16 steel mesh shall be set at the weighing platform, which shall be laid along the

overall length of the weighing platform, and the reinforcing bars shall be disconnected at the deformation joint with a bi-directional spacing of 20cm.

DESIGNED BY:
CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023
VERIFIED BY:
YOO S
E
N
H
NIG
NE
IEN
RG
ICO R P
ORA
O
K
T
O
IN
R
,E A Construction of Double Lane Dual Carriageway (CONTRACTOR)
GOVERNMENT OF NEPAL KORE A
X
P RE
S S
W AC
YO RP
ORA
O
K
T
OINR
,EA Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE PYU
N G
H WE A
N
G
N E
IENRG
IC
ONS
UL
T
A K
N
LO
T
DR
,EA RECOMMENDED BY:
A
N
S
IS
V
JOA
O
C
TIW
NT
HI Stabilization, Interchange, Toll Plaza and Allied DESIGN OF RETAINING WALL
NEPALI ARMY shown (CONTRACTOR)
G A
M
N
RTIE
A
RNA
OTIN
D
AL
EGSIA
N
S SO
AC
T
IE
N
S
EN
P
P
E
A V
L
P
T
,D
A
.L
. Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL T
S
AIR
C
A
O N
S UL
TAN
N
P
E
T
VL
P,T
D
A
.L. APPROVED BY: SHEET No : 3/4
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
SUMMARY OF CROSS SECTION DIMENSIONS AND MAIN QUANTITY
PER LINEAR METER OF GRAVITY SHOULDER WALL

Work Quantity per Linear


Dimensions of retaining wall
Meter
Wall height Bearing
(H) capacity
Upper wall Width of the Width of the Height of the
Top width Bottom width
height weigher wall toe wall toe Volume of the masonry
platform (m) (m)
(m)
H1(m) B (m) B2 (m) B3 (m) bi1 bi2 bi3 bo1 bo2 bo3 hi1 hi2 hi3 ho1 ho2 ho3 3
(m ) (kpa)

2.5 1.0 0.5 1.12 0.5 / / / / / / / / / / / / 2.73 95

3.0 1.2 0.5 2.13 0.5 0.5 / / 0.5 / / 0.5 / / 0.5 / / 4.55 115

3.5 1.4 0.5 2.16 0.5 0.5 / / 0.5 / / 0.5 / / 0.5 / / 5.32 160

4.0 1.6 0.6 2.28 0.5 0.5 / / 0.5 / / 0.5 / / 0.5 / / 6.60 170

4.5 1.8 0.6 2.31 0.5 0.5 / / 0.5 / / 0.5 / / 0.5 / / 7.53 210

5.0 2.0 0.7 2.54 0.6 0.5 / / 0.5 / / 0.5 / / 0.5 / / 9.42 220

5.5 2.2 0.7 2.66 0.7 0.5 / / 0.5 / / 0.5 / / 0.5 / / 10.94 250

6.0 2.4 0.7 3.57 0.8 0.5 0.3 / 0.5 0.5 / 0.5 0.5 / 0.5 0.5 / 14.46 255

6.5 2.6 0.7 3.70 0.9 0.5 0.3 / 0.5 0.5 / 0.5 0.5 / 0.5 0.5 / 16.28 280

7.0 2.8 0.8 3.92 1.0 0.5 0.3 / 0.5 0.5 / 0.5 0.5 / 0.5 0.5 / 19.02 300

7.5 3.0 0.8 4.05 1.1 0.5 0.3 / 0.5 0.5 / 0.5 0.5 / 0.5 0.5 / 21.13 320

8.0 3.2 0.9 4.27 1.2 0.5 0.3 / 0.5 0.5 / 0.5 0.5 / 0.5 0.5 / 24.26 340

8.5 3.4 0.9 4.40 1.3 0.5 0.3 / 0.5 0.5 / 0.5 0.5 / 0.5 0.5 / 26.64 355

9.0 3.6 0.9 6.28 1.4 0.6 0.3 0.3 0.6 0.9 0.9 0.5 0.5 0.5 0.5 0.5 0.5 33.22 385

10.0 4.0 0.9 6.44 1.5 0.6 0.3 0.3 0.6 0.9 0.9 0.5 0.5 0.5 0.5 0.5 0.5 37.93 415

DESIGNED BY:
CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023
VERIFIED BY:
YOO S
E
N
H
NIG
NE
IEN
RG
ICO R P
ORA
O
K
T
O
IN
R
,E A Construction of Double Lane Dual Carriageway (CONTRACTOR)
GOVERNMENT OF NEPAL KORE A
X
P RE
S S
W AC
YO RP
ORA
O
K
T
OINR
,EA Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE PYU
N G
H WE A
N
G
N E
IENRG
IC
ONS
UL
T
A K
N
LO
T
DR
,EA RECOMMENDED BY:
A
N
S
IS
V
JOA
O
C
TIW
NT
HI Stabilization, Interchange, Toll Plaza and Allied DESIGN OF RETAINING WALL
NEPALI ARMY shown (CONTRACTOR)
G A
M
N
RTIE
A
RNA
OTIN
D
AL
EGSIA
N
S SO
AC
T
IE
N
S
EN
P
P
E
A V
L
P
T
,D
A
.L
. Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL T
S
AIR
C
A
O N
S UL
TAN
N
P
E
T
VL
P,T
D
A
.L. APPROVED BY: SHEET No : 4/4
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
CROSS SECTION OF PROTECTION WITH CROSS SECTION OF EXCAVATION SLOPES PROTECTED
GRASS SEED SPRAYING ON FILL SLOPE WITH SPRAYING GRASS SEED SODDING
Earth shoulder Side slope top

Grass seed spreading


Grass seed spraying

.5 1:
1:1 n

H<3m

H<3m
Berm
Drain
Stage for heaping debris

Side ditch

PLAN OF EXCAVATION SLOPES PROTECTED


PLAN OF PROTECTION WITH GRASS SEED SPRAYING ON FILL SLOPE WITH SPRAYING GRASS SEED SODDING

Stage for heaping debris


Earth shoulder
A A B B

Side slope top

Side ditch
Berm

Grass seed spreading


Drain

Grass seed spraying

WORK QUANTITY OF GRASS SODDING AND IRRIGATION(AT ONE SIDE) NOTE


1. This drawing shows the grass sodding protection on the side slope, and

Item Embankment slope Cutting slope all the dimensions are expressed in centimeter.

2. This drawing is applicable to slope protection for the fill section with H≤3

m and soil section with slope gradient less than 1:0.75, or fully weathered
Grass sodding,
2 1.803H+L 2
(1+n )H
irrigation (m )
excavation slope.

DESIGNED BY:
CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023
VERIFIED BY:
YOO S
E
N
H
NIG
NE
IEN
RG
ICO R P
ORA
O
K
T
O
IN
R
,E A Construction of Double Lane Dual Carriageway (CONTRACTOR)
GOVERNMENT OF NEPAL KORE A
X
P RE
S S
W AC
YO RP
ORA
O
K
T
OINR
,EA Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE PYU
N G
H WE A
N
G
N E
IENRG
IC
ONS
UL
T
A K
N
LO
T
DR
,EA RECOMMENDED BY:
A
N
S
IS
V
JOA
O
C
TIW
NT
HI Stabilization, Interchange, Toll Plaza and Allied ROAD SLOPE PROTECTION
NEPALI ARMY shown (CONTRACTOR)
G A
M
N
RTIE
A
RNA
OTIN
D
AL
EGSIA
N
S SO
AC
T
IE
N
S
EN
P
P
E
A V
L
P
T
,D
A
.L
. Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL T
S
AIR
C
A
O N
S UL
TAN
N
P
E
T
VL
P,T
D
A
.L. APPROVED BY: SHEET No : 1/7
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
NORMAL PROJECTION VIEW OF ARCH SKELETON
1:100 A-A
1:100

B-B C-C

A
2

44
To fill and compact soil 1:20 1:20
Shoulder
40

R1 2

75
wall
6 38 6

5
44 6

30
1:1
50 6 6 . 5

10

10
C
38 Arch ring
50

30

15
30
20
0

30

15
C
50
1.803h1

Rapids chute
250 50 50

200

40 40

30
1:0.1
B B

60
1:1
.75

30
46 50
Expansion
ARC EDGE STONE

30
To fill and compact soil
joint 20
0
1:20
50
50

Foundation
40

M25 precast concrete


Mortar rubble 100
120

40
Mortar rubble 3
STRAIGHT EDGE STONE

1:0.1
2
40

60
R106

R100
1:20
46

25
Arch ring
44

M25 precast concrete


49.5 6
6
Rapids chute
2.016h2

NOTE
38 38 Expansion joint 38
1. This drawing shows the arch skeleton protection at the fill section. All the dimensions in this
6 250 6 6 250 6 6 250 6 6 To fill and compact soil
drawing are expressed in centimeter.

2. This drawing is applicable to the side slope protection for the general fill subgrade section with
50

the fill height H 3 m.


40

Foundation
3. The chute on the skeleton and arch ring is made of Mortar rubble, of which the curbstone is made

Berm of M25 cement concrete. In addition, the grout for lining and pointing is M10 cement mortar.
160

Drain
A

CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023

Construction of Double Lane Dual Carriageway (CONTRACTOR)


GOVERNMENT OF NEPAL
Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE
Stabilization, Interchange, Toll Plaza and Allied ROAD SLOPE PROTECTION
NEPALI ARMY shown (CONTRACTOR)
Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL SHEET No : 2/7
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
SUMMARY OF WORK QUANTITY OF ARCH SKELETON SLOPE PROTECTION

Project name Unit Bill of quantities

3
Mortar rubble skeleton m / 100m 2 15.0
Portion under
the foundation 3
Curbstone of M25 precast concrete m / 100m 2 1.5

Excavation 3
m / 100m 2 22.1

3
To compact the fill earthwork m / 100m 2 10.3

Foundation Mortar rubble 3 0.258


portion
Excavation 3 0.35

NOTE
1. This drawing shows the arch skeleton protection at the fill section. All the dimensions in this

drawing are expressed in centimeter.

2. This drawing is applicable to the side slope protection for the general fill subgrade section with

the fill height H 3 m.

3. The chute on the skeleton and arch ring is made of Mortar rubble, of which the curbstone is

made of M25 cement concrete. In addition, the grout for lining and pointing is M10 cement mortar.

CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023

Construction of Double Lane Dual Carriageway (CONTRACTOR)


GOVERNMENT OF NEPAL
Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE
Stabilization, Interchange, Toll Plaza and Allied ROAD SLOPE PROTECTION
NEPALI ARMY shown (CONTRACTOR)
Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL SHEET No : 3/7
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
NORMAL PROJECTION VIEW OF ARCH SKELETON
1:100 A-A
1:100 B-B C-C
19 60 19 2 40
1:20 1:20

30
44
R10 To fill and compact soil

30
6 38 6

1:
44 6

n1

10

10
To be made of soil

50
bags by stacking or 50 6 6

30
planting soil

15
38 Arch ring

40
(rock)

20
0

15
C

50
50 50
2
h1 1+n1

Rapids chute
250

200

40 40

30
1:0.1
B B

60

30

1:
46

n2
Expansion joint To fill and compact soil
50

30
STRAIGHT EDGE STONE ARC EDGE STONE
50

20
40 40 30 40

1:20 1:20

0
Mortar rubble
Catch drain
M25 precast concrete

50
19 60 19 49.5
2 Mortar rubble

25

6
47.1

R106

R100
49.5 6 100
To be made of soil
bags by stacking or 40
M25 precast concrete
planting soil

1:0.1
(rock) Arch ring

60
44

46
6
Rapids chute
2
h2 1+n2

STEP DETAIL
1:40

38 Expansion joint
NOTE
38 38
1. This drawing shows the arch skeleton protection at the excavation section. All the dimensions
6 250 6 6 250 6 6 250 6 6 To fill and compact soil

30
60 in this drawing are expressed in centimeter.

2. This drawing is applicable to the cutting slope of which the excavation slope is H>3m and
50

30

25
composed of fully-weathered soft rock, but its slope gradient shall be no less than 1:0.75.
40

Foundation

Stage for heaping debris 3. The chute on the skeleton and arch ring is made of Mortar rubble, of which the curbstone is
70

25
made of M25 cement concrete. In addition, the grout for lining and pointing is M10 cement mortar.

Side ditch
A

CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023

Construction of Double Lane Dual Carriageway (CONTRACTOR)


GOVERNMENT OF NEPAL
Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE
Stabilization, Interchange, Toll Plaza and Allied ROAD SLOPE PROTECTION
NEPALI ARMY shown (CONTRACTOR)
Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL SHEET No : 4/7
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
SUMMARY OF UNIT WORK QUANTITY OF ARCH SKELETON SLOPE PROTECTION

Project name Unit Bill of quantities

Mortar rubble skeleton m3 / 100m 2 15.0


Portion under
the foundation 3 2
Curbstone of M25 precast concrete m / 100m 1.5

Planting on the soil slope or piling up of soil bags m3 / 100m 2 22.9

Excavation 3
m / 100m 2 22.1

To compact the fill earthwork m3 / 100m 2 10.3

3
Foundation Mortar rubble 0.258
portion
3
Excavation 0.35

SUMMARY OF WORK QUANTITY PER LINEAR METER OF STEP

3
Mortar rubble (m ) 0.124

3
Excavation (m ) 0.214

NOTE
1. This drawing shows the arch skeleton protection at the excavation section. All the dimensions in

this drawing are expressed in centimeter.

2. This drawing is applicable to the cutting slope of which the excavation slope is H>3m and

composed of fully-weathered soft rock, but its slope gradient shall be no less than 1:0.75.

3. The chute on the skeleton and arch ring is made of Mortar rubble, of which the curbstone is

made of M25 cement concrete. In addition, the grout for lining and pointing is M10 cement mortar.

CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023

Construction of Double Lane Dual Carriageway (CONTRACTOR)


GOVERNMENT OF NEPAL
Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE
Stabilization, Interchange, Toll Plaza and Allied ROAD SLOPE PROTECTION
NEPALI ARMY shown (CONTRACTOR)
Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL SHEET No : 5/7
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
DESIGN DRAWING OF WINDOW-TYPE FACING WALL

CROSS SECTION OF FACING WALL


PLAN OF WINDOW BODY ELEVATION VIEW OF FACING WALL
SECTION OF WINDOW BODY
Platform drain
(A--A) M20 trim concrete
b
Design side slope Each wall segment is 1210 long
(5 cm wide, 2.5 cm higher above the wall
face in the vicinity)
4%
5

30

5
12

125
R-
M20 trim concrete

H/3-20
(5 cm wide, 2.5 cm higher above Grass sodding
the wall face in the vicinity) with
three-dimensional
32 net
5
Window body

335
Grass sodding with
three-dimensional net To fill asphalt in the joint
A Waterproofing material

200
Planting soil 5 250 5

Wall side
Wall body
M20 trim concrete

Wall height H
5

H/3
Wall height H

Excavated side slope (5 cm wide, 2.5 cm


higher above the wall Grass sodding
face in the vicinity) with three-
dimensional net
1:n
1:n

1 Window body
2

260
400

Wall body

A Expansion joint (settlement joint)


masonry
a

H/3+20
Grass sodding with
three-dimensional net
Ear wall
110 250 120 250 120 250 110 2
200

20
80

40
1:5
B

NOTE
1. All the dimensions in this drawing are expressed in centimeter. H in the table is expressed in meter;

LIST OF PARAMETERS AND QUANTITY 2. This is a design drawing of the round window-type facing wall, and applicable to side slope protection of stable

excavation in strongly weathered rock.;

Gradient of Gradient of Top Bottom width Ear wall Mortar rubble (or M20 rubble Excavation earthwork M20 edge concrete Grass sodding with
Planting soil 3. The facing wall is segmented at the interval of 10 m, with the expansion joint set in the middle (2 cm wide
(cast-in-situ) three-dimensional net
the wall face the wall back width width concrete)
3 joints, filled with asphalt waterproof materials inside);
n1 n2 b(m) B(m) a(m) (m3/m) m3/m (m3/m) 2
m /m (m /m)

2 2
The facing wall is applicable to protection of the side slope having no obviously unfavorable rock structural face.
0.75 0.70 0.40 0.044H+0.386 1.00 0.025H +0.044H+3.600 0.025H +0.455H+3.600 0.029 H 0.504 H 0.234 H
4. For the quantity of the protections per linear meter given in this table, increase in quantity due to cutting of the
1.00 0.95 0.40 1.00
2
0.025H +0.063H+3.300
2
0.025H +0.455H+3.300 0.025 H 0.444 H 0..208 H
0.042H+0.370
slope platform, platform drain, stage for heaping debris and side slope due to irregular cutting have been taken

1.25 1.25 0.50 0.400 0.216H+3.000 0.500H+3.000 0.017 H 0.393 H 0.196 H into consideration;

0.55 0.423 0.279H+2.700 0.550H+2.700 0.017 H 0.349 H 0.200 H 5. The window of the facing wall shall be set based on the principle of good-looking. Two rows of windows shall
1.50 1.50
be set when the wall is 8 m high, and three rows when the wall is 10 m high;

CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023

Construction of Double Lane Dual Carriageway (CONTRACTOR)


GOVERNMENT OF NEPAL
Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE
Stabilization, Interchange, Toll Plaza and Allied ROAD SLOPE PROTECTION
NEPALI ARMY shown (CONTRACTOR)
Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL SHEET No : 6/7
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
CROSS SECTION OF MORTAR RUBBLE AT BRIDGE APPROACH AND BOTH SIDES OF CULVERT

Earth shoulder width

Pavement structure

WORK QUANTITY PER LINEAR METER


1:1
.5 Item
25 Sand gravel bedding Earthwork of foundation
DETAIL OF SHOULDER STONE Mortar rubble slope body Mortar rubble foundation course excavation
Mortar rubble
Slope gradient

H
Sand gravel bedding course
1:1.5 1.559
50 7.5
10
25

100
5
.7
1:0
Mortar rubble foundation 80
1:1
.5
5

57.5

NOTE
1. This drawing shows the mortar rubble slope protection at the bridge

approach as well as at both sides of the culvert;

2. Except that H is expressed in meter, all the other dimensions are

expressed in centimeter in this drawing.;

3. This is a design drawing of the side slope protection at the bridge approach

as well as at both sides of the culvert. Protection is made with mortar rubble;

4. The shoulder stone is precast with M20 concrete.

CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023

Construction of Double Lane Dual Carriageway (CONTRACTOR)


GOVERNMENT OF NEPAL
Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE
Stabilization, Interchange, Toll Plaza and Allied ROAD SLOPE PROTECTION
NEPALI ARMY shown (CONTRACTOR)
Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL SHEET No : 7/7
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
Catch drain PLAN OF DRAINAGE WORKS
River

h
tc
Di
al
Catch drain Rapids chute

ur
t
Na
Terrace

Rapids chute

Catch drain Drain


Rapids chute

Or
Terrace

Decentralized drainage for side slope

Side Ditch

Center Line

EXCAVATION DRAIN

Catch drain

1:
n3

Platform catch drain


1:
n2

Excavation platform
1:
n1

Side ditch
i%
NOTE
1. This drawing shows the operation of the drainage system;
Center Line

2. The drainage system is composed of the drains, side ditches and catch drains.

DESIGNED BY:
CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023
VERIFIED BY:
YOO S
E
N
H
NIG
NE
IEN
RG
ICO R P
ORA
O
K
T
O
IN
R
,E A Construction of Double Lane Dual Carriageway (CONTRACTOR)
GOVERNMENT OF NEPAL KORE A
X
P RE
S S
W AC
YO RP
ORA
O
K
T
OINR
,EA Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE PYU
N G
H WE A
N
G
N E
IENRG
IC
ONS
UL
T
A K
N
LO
T
DR
,EA THE DRAINAGE WORK OF RECOMMENDED BY:
A
N
S
IS
V
JOA
O
C
TIW
NT
HI Stabilization, Interchange, Toll Plaza and Allied
NEPALI ARMY SUBGRADE AND PAVEMENT shown (CONTRACTOR)
G A
M
N
RTIE
A
RNA
OTIN
D
AL
EGSIA
N
S SO
AC
T
IE
N
S
EN
P
P
E
A V
L
P
T
,D
A
.L
. Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL T
S
AIR
C
A
O N
S UL
TAN
N
P
E
T
VL
P,T
D
A
.L. APPROVED BY: SHEET No : 1 /9
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
DRAIN SIDE DITCH Excavation slope
1:50 1:50

Berm

50
152
Berm
15 15
30 20
1:m 2.5% 70
100 4%
25 21 60 21 25
1:

15
1

20
4% Ground line

5
4%

60+h
M15 concrete M25 concrete
50

1:0.

3
70

1:0.
Mortar rubble

15
M15 concrete Non-woven

60
20

10
10
Sand gravel cushion
Natural gravel
40
Sand gravel cushion (2~4cm) HDPE perforated drainage pipe

WORK QUANTITY PER LINEAR METER

Item Type I Type II


Quantity Type I Type II Platform drain Platform drain
Drain Side ditch
Catch drain Catch drain
Name

Mortar rubble (m ) 0.497 0.723 0.63 0.12 0.54

Excavation (m ) 1.596 1+h 1.49 0.99 0.80 NOTE


0.1 1. All the dimensions in this drawing are expressed in centimeter.
Sand gravel cushion (m ) 0.152 0.264 0.11 0.10
2. The side ditch is used at the excavation section as well as that requiring
M25 Cast-in-place Concrete (m ) 0.36+0.3h
side ditch deepening. H represents the depth for deepening.
M15 Cast-in-place Concrete (m ) 0.329
3. PVC pipe drain is set every 5 m, the drainage pipe is perforated around
Water-stop ridge (m ) 0.1 0.11 0.11
the water inlet and wrapped with permeable geotextile, the material area of

M10 cement mortar (m ) 0.045 each pipe is 0.01 .

CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023

Construction of Double Lane Dual Carriageway (CONTRACTOR)


GOVERNMENT OF NEPAL
Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE THE DRAINAGE WORK OF
Stabilization, Interchange, Toll Plaza and Allied
NEPALI ARMY SUBGRADE shown (CONTRACTOR)
Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL SHEET No : 2 /9
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
4%

Sand gravel cushion

NOTE
1. All the dimensions in this drawing are expressed in centimeter.

2. The type I catch drain is applicable to the soil excavation slope,

and the type II catch drain to rock excavation slope.

CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023

Construction of Double Lane Dual Carriageway (CONTRACTOR)


GOVERNMENT OF NEPAL
Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE THE DRAINAGE WORK OF
Stabilization, Interchange, Toll Plaza and Allied
NEPALI ARMY SUBGRADE shown (CONTRACTOR)
Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL SHEET No : 3 /9
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
SIDE DITCH PLAN OF COVER PLATE
REINFORCEMENT STRUCTURE REINFORCEMENT STRUCTURE PLAN OF COVER PLATE
7.5
7
84 50 50 50 50 50 50 50 50 50
2 2
10 10
1

15
Ø8@15cm

10
3+4×10+3
60+h
Ø12@15cm 2

50
250.5+h

84
10
15

2
4×19.5

15 70 15
3 3

SUMMARY OF DIMENSIONS OF COVER PLATES

Bar
M25
Concrete
Slab Bars Length per
Diameter Total length
width grade piece Weight
Pcs.
ELEVATION VIEW OF COVER PLATE SIDE VIEW OF COVER PLATE
3
REINFORCEMENT STRUCTURE REINFORCEMENT STRUCTURE K (cm) (mm) L (cm) N (m) (Kg) (m )

Ø8 106 5 5.30 2.1

2 50 Fe 415 0.063
3.5

3.5
1 Ø12 88 7 6.16 5.47
15

15
3.5

3.5
3 3
1
1
5 4×10 5

84 WORK QUANTITY PER LINEAR METER OF


50
SIDE DITCH REINFORCEMENT STRUCTURE

Length per
Bars Diameter piece Pcs. Total length Weight
grade

(mm) L (cm) N (m) (Kg)


5Ø8
2
7Ø12 106 Ø8 100 17+2*(h/0.15) 17+13h 6.72+5.14h
1
88 Fe 415
Ø12 250.5+h 7 17.54+0.07h 15.58+0.06h

NOTE
1. Except that the reinforcement diameter is expressed in millimeter,

all other dimensions are expressed in centimeter in this drawing.

DESIGNED BY:
CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023
VERIFIED BY:
YOO S
E
N
H
NIG
NE
IEN
RG
ICO R P
ORA
O
K
T
O
IN
R
,E A Construction of Double Lane Dual Carriageway (CONTRACTOR)
GOVERNMENT OF NEPAL KORE A
X
P RE
S S
W AC
YO RP
ORA
O
K
T
OINR
,EA Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE PYU
N G
H WE A
N
G
N E
IENRG
IC
ONS
UL
T
A K
N
LO
T
DR
,EA THE DRAINAGE WORK OF RECOMMENDED BY:
A
N
S
IS
V
JOA
O
C
TIW
NT
HI Stabilization, Interchange, Toll Plaza and Allied
NEPALI ARMY SUBGRADE AND PAVEMENT shown (CONTRACTOR)
G A
M
N
RTIE
A
RNA
OTIN
D
AL
EGSIA
N
S SO
AC
T
IE
N
S
EN
P
P
E
A V
L
P
T
,D
A
.L
. Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL T
S
AIR
C
A
O N
S UL
TAN
N
P
E
T
VL
P,T
D
A
.L. APPROVED BY: SHEET No : 4 /9
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
Ⅰ-Ⅰ Ⅱ-Ⅱ
ELEVATION VIEW OF RAPIDS CHUTE 1:50 1:50
1:50 152
30 60 30
Ⅰ Ⅱ
25 21 60 21 25

60
5
M15 concrete Mortar rubble

1:0.

3
70

70

1:0.

30
Mortar rubble

10
M15 concrete
20

20
R20
Sand gravel cushion

10
10

Sand gravel cushion BILL OF QUANTITIES

Portion of Trough portion Portion of water


Item water inlet
Ⅰ Ⅱ Quantity outlet Anti-skid platform
90
3 3 3 (m 3 /pcs)
L Name (m /place) (m /m) (m /place)
1:m

Mortar rubble 1.87 0.60 1.92 1/2*0.9*0.9/m*1.2

Excavation 3.34 0.96 2.4 1/2*0.9*0.9/m*1.2+0.11

90/m
Sand gravel cushion 0.33 0.12 0.34 0.11

Ⅲ-Ⅲ Anti-scouring
stone riprap
1.2
1:50 200 90

30 60 30 200
30 cm thick anti-scouring stone riprap
150 50
40


30


Mortar rubble

30
90/m
10

30
Sand gravel cushion

90

50
PLAN OF RAPIDS CHUTE Mortar rubble

1:50 10 cm thick sand gravel cushion

30 cm thick anti-scouring
Ⅳ-Ⅳ stone riprap
200
1:50
200

40
25

30
21

30
200
60
60

50
Mortar rubble
21

30
25

40
NOTE
1. All the dimensions in this drawing are expressed in centimeter.
150 100
2. This type of rapids chute is used to connect the drain with the natural channel.

Portion of water inlet Trough portion Portions of water outlet and stilling 3. One anti-skid platform is provided on the rapids chute at the interval of 2 m.

4. m represents the gradient of the subgrade side slope.

DESIGNED BY:
CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023
VERIFIED BY:
YOO S
E
N
H
NIG
NE
IEN
RG
ICO R P
ORA
O
K
T
O
IN
R
,E A Construction of Double Lane Dual Carriageway (CONTRACTOR)
GOVERNMENT OF NEPAL KORE A
X
P RE
S S
W AC
YO RP
ORA
O
K
T
OINR
,EA THE DRAINAGE WORK OF
Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE PYU
N G
H WE A
N
G
N E
IENRG
IC
ONS
UL
T
A K
N
LO
T
DR
,EA
SUBGRADE AND PAVEMENT RECOMMENDED BY:
A
N
S
IS
V
JOA
O
C
TIW
NT
HI Stabilization, Interchange, Toll Plaza and Allied
NEPALI ARMY shown (CONTRACTOR)
G A
M
N
RTIE
A
RNA
OTIN
D
AL
EGSIA
N
S SO
AC
T
IE
N
S
EN
P
P
E
A V
L
P
T
,D
A
.L
. Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL T
S
AIR
C
A
O N
S UL
TAN
N
P
E
T
VL
P,T
D
A
.L. APPROVED BY: SHEET No : 5 /9
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
Ⅰ-Ⅰ Ⅱ -Ⅱ
ELEVATION VIEW OF RAPIDS CHUTE
1:50 1:50
1:50
Ⅰ Ⅱ 30 50 50 50 30 30 50 30

50
1

1:
1:

50
1
Mortar rubble

30
50
10

30

10
10 30

Sand gravel cushion

R20
Mortar rubble
Sand gravel cushion

BILL OF QUANTITIES

Portion of Portion of water


90 Item water inlet Trough portion outlet Anti-skid platform
Ⅰ Ⅱ Quantity

Name (m 3 /place) (m3/m)


3
(m /place) (m 3 /pcs)
L
1:m

mortar rubble 1.65 0.57 1.9 1/2*0.9*0.9/m*1.1

Excavation 2.85 0.88 2.32 1/2*0.9*0.9/m*1.1+0.1

90/m
Sand gravel cushion 0.4 0.11 0.34 0.1

Ⅲ-Ⅲ Anti-scouring
stone riprap
1.2
200 90
1:50
200 30 cm thick anti-scouring stone riprap

30 50 30 150 50
40


90/m
30

Mortar rubble

30
10

Sand gravel cushion

50
90
PLAN OF RAPIDS CHUTE
1:50 10 cm thick sand gravel cushion Ⅳ Mortar rubble

Ⅳ-Ⅳ 30 cm thick anti-scouring


stone riprap
200
1:50
30

200

45

30
50

30

30
200
50

50

50
Mortar rubble
30
50

45
30

NOTE
1. All the dimensions in this drawing are expressed in centimeter.
150 100
2. This type of rapids chute is used to connect the catch drain with the natural channel.

Portion of water inlet Trough portion Portions of water outlet and stilling 3. One anti-skid platform is provided on the rapids chute at the interval of 2 m.

4. m represents the gradient of the subgrade side slope.

DESIGNED BY:
CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023
VERIFIED BY:
YOO S
E
N
H
NIG
NE
IEN
RG
ICO R P
ORA
O
K
T
O
IN
R
,E A Construction of Double Lane Dual Carriageway (CONTRACTOR)
GOVERNMENT OF NEPAL KORE A
X
P RE
S S
W AC
YO RP
ORA
O
K
T
OINR
,EA Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE PYU
N G
H WE A
N
G
N E
IENRG
IC
ONS
UL
T
A K
N
LO
T
DR
,EA THE DRAINAGE WORK OF RECOMMENDED BY:
A
N
S
IS
V
JOA
O
C
TIW
NT
HI Stabilization, Interchange, Toll Plaza and Allied
NEPALI ARMY SUBGRADE AND PAVEMENT shown (CONTRACTOR)
G A
M
N
RTIE
A
RNA
OTIN
D
AL
EGSIA
N
S SO
AC
T
IE
N
S
EN
P
P
E
A V
L
P
T
,D
A
.L
. Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL T
S
AIR
C
A
O N
S UL
TAN
N
P
E
T
VL
P,T
D
A
.L. APPROVED BY: SHEET No : 6 /9
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
ELEVATION VIEW OF RAPIDS CHUTE Ⅰ -Ⅰ Ⅱ -Ⅱ
1:50 1:50 1:50
Ⅰ Ⅱ
15 15 30 60 30
70

15

60
15

60+h
M25 concrete
60+h

30
Mortar rubble

15

10
10 15

Sand gravel cushion

10
R20
Sand gravel cushion

BILL OF QUANTITIES

Item Portion of Portion of water


Quantity water inlet Trough portion outlet Anti-skid platform
Ⅰ Ⅱ 90
3 (m 3 /pcs)
(m 3/m)
3
Name (m /place) (m /place)
L
1:
m
Mortar rubble 1.52+0.68h 0.60 1.92 1/2*0.9*0.9/m*1.2

Excavation 2.85+1.65h 0.96 2.4 1/2*0.9*0.9/m*1.2+0.11

90/m
Sand gravel cushion 0.29 0.12 0.34 0.11

Ⅲ -Ⅲ Anti-scouring stone
riprap
1.2

1:50 200 90

30 60 30 200
30 cm thick anti-scouring stone riprap
150 50
40


30


Mortar rubble

30
90/m
10

30
Sand gravel cushion

90

50

PLAN OF RAPIDS CHUTE Mortar rubble


10 cm thick sand gravel cushion
1:50
Ⅳ-Ⅳ 30 cm thick anti-scouring
stone riprap
200 1:50
200

40

30
30
15

30
200
70

60

50
Mortar rubble
15

30

40
NOTE
1. All the dimensions in this drawing are expressed in centimeter.
150 100
2. This type of rapid chutes is used to connect the side ditch with the natural channel.

3. One anti-skid platform is provided on the rapids chute at the interval of 2 m.


Portion of water inlet Trough portion Portions of water outlet and stilling
4. m represents the gradient of the subgrade side slope.

DESIGNED BY:
CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023
VERIFIED BY:
YOO S
E
N
H
NIG
NE
IEN
RG
ICO R P
ORA
O
K
T
O
IN
R
,E A Construction of Double Lane Dual Carriageway (CONTRACTOR)
GOVERNMENT OF NEPAL KORE A
X
P RE
S S
W AC
YO RP
ORA
O
K
T
OINR
,EA Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE PYU
N G
H WE A
N
G
N E
IENRG
IC
ONS
UL
T
A K
N
LO
T
DR
,EA THE DRAINAGE WORK OF RECOMMENDED BY:
A
N
S
IS
V
JOA
O
C
TIW
NT
HI Stabilization, Interchange, Toll Plaza and Allied
NEPALI ARMY SUBGRADE AND PAVEMENT shown (CONTRACTOR)
G A
M
N
RTIE
A
RNA
OTIN
D
AL
EGSIA
N
S SO
AC
T
IE
N
S
EN
P
P
E
A V
L
P
T
,D
A
.L
. Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL T
S
AIR
C
A
O N
S UL
TAN
N
P
E
T
VL
P,T
D
A
.L. APPROVED BY: SHEET No : 7 /9
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
Ⅱ-Ⅱ
ELEVATION VIEW OF RAPIDS CHUTE Ⅰ-Ⅰ 1:50
Ⅰ 1:50 1:50
30 40 30
40 30

40
50

40

30
40

5
Sand gravel cushion Mortar rubble

10
R20

BILL OF QUANTITIES

90 Item Portion of Portion of water


Trough portion outlet
Quantity water inlet Anti-skid platform
L
1:m 3 3 3 (m 3 /pcs)
Name (m /place) (m /m) (m /place)

Mortar rubble 1.04 0.54 1.2 1/2*0.9*0.9/m*1.2

Excavation 1.4 0.8 1.8 1/2*0.9*0.9/m*1+0.09

90/m
Ⅱ Sand gravel cushion 0.18 0.1 0.2 0.09
Ⅲ-Ⅲ
1:50
200 90

30 40 30 200
R5


50

15
30

Ⅱ 100
1

1:
Mortar rubble 1:

1
1:
25

1
90/m
10

Sand gravel cushion Stilling sill

90
Ⅲ Mortar rubble

PLAN OF RAPIDS CHUTE


10 cm thick sand gravel cushion
1:50
30

30
40

40
30

30
5

NOTE
1. All the dimensions in this drawing are expressed in centimeter.
150 100
2. This type of rapids chute is used to connect the platform drain
with the catch drain.
Portion of water inlet Trough portion Portion of water outlet
3. One anti-skid platform is provided on the rapids chute at the
interval of 2 m.

4. m represents the gradient of the subgrade side slope.

DESIGNED BY:
CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023
VERIFIED BY:
YOO S
E
N
H
NIG
NE
IEN
RG
ICO R P
ORA
O
K
T
O
IN
R
,E A Construction of Double Lane Dual Carriageway (CONTRACTOR)
GOVERNMENT OF NEPAL KORE A
X
P RE
S S
W AC
YO RP
ORA
O
K
T
OINR
,EA Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE PYU
N G
H WE A
N
G
N E
IENRG
IC
ONS
UL
T
A K
N
LO
T
DR
,EA THE DRAINAGE WORK OF RECOMMENDED BY:
A
N
S
IS
V
JOA
O
C
TIW
NT
HI Stabilization, Interchange, Toll Plaza and Allied
NEPALI ARMY SUBGRADE AND PAVEMENT shown (CONTRACTOR)
G A
M
N
RTIE
A
RNA
OTIN
D
AL
EGSIA
N
S SO
AC
T
IE
N
S
EN
P
P
E
A V
L
P
T
,D
A
.L
. Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL T
S
AIR
C
A
O N
S UL
TAN
N
P
E
T
VL
P,T
D
A
.L. APPROVED BY: SHEET No : 8 /9
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
Ⅰ -Ⅰ Ⅱ -Ⅱ
1:50 1:50
15 15
30 60 30
ELEVATION VIEW OF RAPIDS CHUTE 70

1:50

15

60
Ⅰ Ⅱ

60+h
M25 concrete

30
15
Mortar rubble
Sand gravel cushion
15

10
10
Sand gravel cushion
60+h
10 15

R20
BILL OF QUANTITIES

Item Portion of Portion of water


Ⅰ Trough portion
Quantity water inlet outlet Anti-skid platform
Ⅱ 90 3 3 (m 3 /pcs)
Name 3
(m /place) (m /m) (m /place)
L
1:m
Mortar rubble 1.52+0.68h 0.60 1.87 1/2*0.9*0.9/m*1.2

Excavation 2.85+1.65h 0.96 3.34 1/2*0.9*0.9/m*1.2+0.11

90/m
Sand gravel cushion 0.29 0.12 0.33 0.11
Ⅲ-Ⅲ

1:50

30 60 30 200 90 Ⅳ-Ⅳ
Ⅳ 1:50
40

100 150 152


30

Mortar rubble 25 21 60 21 25
10

5
60
Sand gravel cushion M15 concrete

90/m

1:0.

3
70

1:0.
Mortar rubble

3
M15 concrete

20
90

10
PLAN OF RAPIDS CHUTE Ⅳ
Mortar rubble
1:50 Sand gravel cushion
10 cm thick sand gravel cushion

25
30
15

21
60
70

60
NOTE

21
15

30

25
1. All the dimensions in this drawing are expressed in centimeter.

2. This type of rapids chute is used to connect side ditch with the
drain.

3. One anti-skid platform is provided on the rapids chute at the


150 100 100 150 interval of 2 m.

4. m represents the gradient of the subgrade side slope.


Portion of water inlet Trough portion Portion of water outlet

DESIGNED BY:
CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023
VERIFIED BY:
YOO S
E
N
H
NIG
NE
IEN
RG
ICO R P
ORA
O
K
T
O
IN
R
,E A Construction of Double Lane Dual Carriageway (CONTRACTOR)
GOVERNMENT OF NEPAL KORE A
X
P RE
S S
W AC
YO RP
ORA
O
K
T
OINR
,EA Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE PYU
N G
H WE A
N
G
N E
IENRG
IC
ONS
UL
T
A K
N
LO
T
DR
,EA THE DRAINAGE WORK OF RECOMMENDED BY:
A
N
S
IS
V
JOA
O
C
TIW
NT
HI Stabilization, Interchange, Toll Plaza and Allied
NEPALI ARMY SUBGRADE AND PAVEMENT shown (CONTRACTOR)
G A
M
N
RTIE
A
RNA
OTIN
D
AL
EGSIA
N
S SO
AC
T
IE
N
S
EN
P
P
E
A V
L
P
T
,D
A
.L
. Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL T
S
AIR
C
A
O N
S UL
TAN
N
P
E
T
VL
P,T
D
A
.L. APPROVED BY: SHEET No : 9 /9
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
STRUCTURAL DRAWING OF FLEXIBLE PAVEMENT LEGENDS

Pavement type Asphalt concrete pavement

Bituminous surface Dense bituminous macadam

Applicable
Driveway and hard shoulder
sections

Granular base Granular sub-base

5 cm Bituminous surface
(D=19 mm)

15 cm Dense bituminous macadam Tack coat Tack coat+ prime coat


(D=35mm)
Pavement structure

20 cm Granular base

35 cm Granular sub-base

75 cm

NOTE
1. Apply tack coat between the bituminous surface layer and dense bituminous macadam layer.
2. Apply prime coat on the granular base, and pave the tack coat .

DESIGNED BY:
CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023
VERIFIED BY:
YOO S
E
N
H
NIG
NE
IEN
RG
ICO R P
ORA
O
K
T
O
IN
R
,E A Construction of Double Lane Dual Carriageway (CONTRACTOR)
GOVERNMENT OF NEPAL KORE A
X
P RE
S S
W AC
YO RP
ORA
O
K
T
OINR
,EA Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE PYU
N G
H WE A
N
G
N E
IENRG
IC
ONS
UL
T
A K
N
LO
T
DR
,EA RECOMMENDED BY:
A
N
S
IS
V
JOA
O
C
TIW
NT
HI Stabilization, Interchange, Toll Plaza and Allied PAVEMENT STRUCTURE
NEPALI ARMY shown (CONTRACTOR)
G A
M
N
RTIE
A
RNA
OTIN
D
AL
EGSIA
N
S SO
AC
T
IE
N
S
EN
P
P
E
A V
L
P
T
,D
A
.L
. Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL T
S
AIR
C
A
O N
S UL
TAN
N
P
E
T
VL
P,T
D
A
.L. APPROVED BY: SHEET No : 1/4
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
STRUCTURAL VIEW OF PAVEMENT END (I) STRUCTURAL VIEW OF PAVEMENT END (II)

50

Driveway and hard shoulder Curb SHY


5cm cast-in-situ M20 concrete Driveway and hard shoulder
Side ditch Berm

15 70+b 15
5
15

5
1:1

15
Gravelly Soil .5
20

1:
1

20

60+h
35

35
5 cm Bituminous surface

5 cm Bituminous surface 50
15 cm Dense bituminous macadam

15
20 cm Granular base 15 cm Dense bituminous macadam

10
35 cm Granular sub-base 20 cm Granular base

60
35 cm Granular sub-base

40

NOTE
1. All the dimensions in this drawing are expressed in centimeter.
2. For more details of the drainage structure seeTHE DRAINAGE WORK OF SUBGRADE drawings.

DESIGNED BY:
CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023
VERIFIED BY:
YOO S
E
N
H
NIG
NE
IEN
RG
ICO R P
ORA
O
K
T
O
IN
R
,E A Construction of Double Lane Dual Carriageway (CONTRACTOR)
GOVERNMENT OF NEPAL KORE A
X
P RE
S S
W AC
YO RP
ORA
O
K
T
OINR
,EA Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE PYU
N G
H WE A
N
G
N E
IENRG
IC
ONS
UL
T
A K
N
LO
T
DR
,EA RECOMMENDED BY:
A
N
S
IS
V
JOA
O
C
TIW
NT
HI Stabilization, Interchange, Toll Plaza and Allied PAVEMENT STRUCTURE
NEPALI ARMY shown (CONTRACTOR)
G A
M
N
RTIE
A
RNA
OTIN
D
AL
EGSIA
N
S SO
AC
T
IE
N
S
EN
P
P
E
A V
L
P
T
,D
A
.L
. Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL T
S
AIR
C
A
O N
S UL
TAN
N
P
E
T
VL
P,T
D
A
.L. APPROVED BY: SHEET No : 2/4
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
LONGITUDINAL SECTION VIEW OF JUNCTION BETWEEN BRIDGE PLANE OF TIE RODS FOR PLANE OF TIE RODS FOR
APPROACH SLAB AND ASPHALT CONCRETE PAVEMENT LONGITUDINAL JOINTS TRANSVERSE JOINTS
1:20 1:20

500 550

450 100 100


80 70

10 10
Ø25Tie rod

40
Ø16Tie rod

60
L=70
L=80
10 Cement concrete slab
Cast-in-situ M30

40
60
Tie rod ( 25) cement concrete

10 cm Asphalt concrete Glass fiber geogrid
anti-cracking net 10
10 cm Asphalt concrete 5 cm Bituminous surface To be applied with To be applied with antirust paint

40
Abutment 25 cm Cement concrete

60
antirust paint
approach slab 15 cm Dense bituminous macadam
25 cm Cement concrete
1.5 1.5 approach slab
30 cm Granular base (WMM) 20 cm Granular base 10
30 cm Granular base (WMM) 35 cm Granular sub-base

1.5
Detail of Underpass

QUANTITY OF TIE ROD WORKS (1 PCS)

Ⅰ-Ⅰ Tie rod Diameter Length Spacing Pcs.


Total
length
Unit
weight Total weight

1:50 (m) mm cm cm Pcs. m Kg Kg


LAYOUT PLAN OF CONCRETE TRANSITION SLAB Tie rods for
16 80 60 16 12.8 1.578 20.198
longitudinal joints
Tie rods for
transverse joints 25 70 40 28 19.6 3.853 75.519

25 10
Asphalt concrete
Transverse underpass
of concrete transition
slabs Transition slab of cast-in-situ
450 100 Curb SHY M30 cement concrete

QUANTITY OF CONCRETE TRANSITION SLAB WORKS (1 PCS)

30
50

wet mix macadam base


350

Tie rods for transverse joints (φ25)


M30 concrete transition slab (5.5 m)
15+60*7+15
L=70 Item
Average slab
Slab width (m) thickness (m) Concrete (m 3)

Tie rods for longitudinal


30+26*40+30

Bridge transition section 11 0.225 13.61


jointsφ16
1200

1100

400

Bridge approach slab Asphalt concrete pavement


L=80

Cast-in-situ M30 cement concrete


350

NOTE
50

1. Except that the reinforcement diameter is expressed in millimeter in this drawing, all other dimensions are expressed in centimeter;
2. The surface of the concrete transition slab must be roughened, with the slot depth of 1.5 cm, so as to reinforce the asphalt face and concrete transition slab.
Curb SHY 3. The tie rods shall be provided in the middle of slab and adjusted properly when interference takes place between the tie rods for the transverse joints.
4. In the drawing, except that the quantity of the approach slabs is included in that of the bridges, other works, including the quantity of the
transition slabs, and that of the longitudinal and transverse tie rods, etc., is included in that of the pavement works.
5. In this drawing, an asphalt coating (0.1 mm thick) is applied within 100 mm to the center of the tie rod.
6. Each tie rod must be positioned correctly by setting parallel to the concrete surface, driveway axis or normal line, with derivation to the horizontal face, vertical
face or adjacent tie rod no more than 4°.

DESIGNED BY:
CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023
VERIFIED BY:
YOO S
E
N
H
NIG
NE
IEN
RG
ICO R P
ORA
O
K
T
O
IN
R
,E A Construction of Double Lane Dual Carriageway (CONTRACTOR)
GOVERNMENT OF NEPAL KORE A
X
P RE
S S
W AC
YO RP
ORA
O
K
T
OINR
,EA Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE PYU
N G
H WE A
N
G
N E
IENRG
IC
ONS
UL
T
A K
N
LO
T
DR
,EA RECOMMENDED BY:
A
N
S
IS
V
JOA
O
C
TIW
NT
HI Stabilization, Interchange, Toll Plaza and Allied PAVEMENT STRUCTURE
NEPALI ARMY shown (CONTRACTOR)
G A
M
N
RTIE
A
RNA
OTIN
D
AL
EGSIA
N
S SO
AC
T
IE
N
S
EN
P
P
E
A V
L
P
T
,D
A
.L
. Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL T
S
AIR
C
A
O N
S UL
TAN
N
P
E
T
VL
P,T
D
A
.L. APPROVED BY: SHEET No : 3/4
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)
SCHEMATIC VIEW OF CONNECTING STRUCTURE
BETWEEN ASPHALT CONCRETE PAVEMENT AND
CEMENT CONCRETE PAVEMENT LAYOUT OF TIE RODS FOR JOINTS
1:50

Asphalt concrete pavement Cement concrete pavement

Joint

200 200 Ø25 Tie rod Ø32 Dowel bar Cement concrete sleeper slab
Expansion joint
100 100

35
5

70
14
Cement concrete facing
Ø25 tie rod

35
15

28
14
70
200 cm long glass fiber geogrid b n*40 b
20

anti-cracking net Cast-in-situ cement concrete slab Cement stabilized 60

15
gravel base

Cement concrete pavement


35

5 cm Bituminous surface
400 Slab length
15 cm Dense bituminous macadam

20 cm Granular base

35 cm Granular sub-base

NOTE
1. Except that the reinforcement diameter is expressed in millimeter in this drawing, all other dimensions are expressed in centimeter.

2. The sleeper slab is made of cast-in-situ M30 concrete, roughened transversally on the surface, and sprayed with bonding layer asphalt.

3. Two layers of glass fiber anti-cracking net, which are 2 m wide each and provided respectively under the upper and lower surfacing layers.

4. Technical requirements for the glass fiber geogrid: Both of its meridional and latitudinal tensile strength shall be

no less than 60 kN/m each, with elongation rate less than 3%, gel content 20% to 40%, temperature resistance 100

to 280 ℃, and breadth 1.5 to 4 m, and elastic modulus 760 GPa, grid size 12 mm x 12 mm and weight per unit area 450 g / m2.

DESIGNED BY:
CLIENT DESIGN AND SUPERVISION CONSULTANT CONTRACTOR SUB PROJECT TITLE DRAWING TITLE SCALE REV.No
(CONTRACTOR) DATE : April-2023
VERIFIED BY:
YOO S
E
N
H
NIG
NE
IEN
RG
ICO R P
ORA
O
K
T
O
IN
R
,E A Construction of Double Lane Dual Carriageway (CONTRACTOR)
GOVERNMENT OF NEPAL KORE A
X
P RE
S S
W AC
YO RP
ORA
O
K
T
OINR
,EA Standard Expressway Road, Bridge, Slope As DWG No :
MINISTRY OF DEFENCE PYU
N G
H WE A
N
G
N E
IENRG
IC
ONS
UL
T
A K
N
LO
T
DR
,EA RECOMMENDED BY:
A
N
S
IS
V
JOA
O
C
TIW
NT
HI Stabilization, Interchange, Toll Plaza and Allied PAVEMENT STRUCTURE
NEPALI ARMY shown (CONTRACTOR)
G A
M
N
RTIE
A
RNA
OTIN
D
AL
EGSIA
N
S SO
AC
T
IE
N
S
EN
P
P
E
A V
L
P
T
,D
A
.L
. Works Ch-41+000 to Ch-49+818.82
KATHMANDU NEPAL T
S
AIR
C
A
O N
S UL
TAN
N
P
E
T
VL
P,T
D
A
.L. APPROVED BY: SHEET No : 4/4
I.D.: KTFT/ICB/WORKS/R&B/078/079/6
(CONTRACTOR)