Bauxite Grinding Package

Concrete Summery

Concrete Balance
Category of quantity as per Up to date work Concrete
Sl no Name Structure IFC Drawing No Rev. No
concrete released drawing done quantity quantity in
in Cum Cum

PCC 92.588 85.285 7.303


1 SUU-STATION BUILDING ZT2023.01-502-GA-CV-254 3
RCC 846.985 529.037 317.948

COLUMN FOUNDATION FOR BALL MILL PCC 24.732 6.230 18.502


2 BUILDING ALONG WITH STAIRCASE ZT 2023.01-502-GA-CV-240 1
(SHED FOUNDATION) RCC 201.066 65.303 135.763

PCC 46.316 30.766 15.550


3 SILO BUILDING ALONG WITH STAIRCASE & ZT2023.01-502-GA-CV-001 2
ELEVATOR SUPPORTING FOUNDATION
RCC 769.017 0.000 769.017