You are on page 1of 1

SC03

EL04
SC02

8
7
6 2
5 15300
10730
4620
1 4840
1 6650 5840
2 4080
CLIENT

WS01
3 4
WS02 10 73 16.13
WS03
VOID
10 73 16.13 VOID
N
WS04
E HORIZONTAL LIFELINE SYSTEM (HLL) VOID
WS05 AMAALA Poject Permitting Support and Coordination Office (APPSCO)

1800
VOID 8mm DIAMETER STAINLESS STEEL
VOID
VOID WIRE 74M, SUPPLIED WITH COMPATIBLE
MOBILE TRAVELLER. VOID
M
SYSTEM SECURED WITH STANDARD VOID
GALVANIZED STEEL POST FIXED

2000
VOID
INTO CONCRETE SLAB WITH FISCHER CUTOUT
4800

VOID
CUTOUT
VA CHEMICAL ANCHOR BOLT TOW
LL
EY LLE
Y
+4.250 L STAMP SIGNATURE
SL
VA 2500
OP
E1
% 2220
6300 E 1%
OP
6385 SL VAL
VOID LEY
D 1% LEAD CONSULTANT

RIDGE

3800
SL
OP O PE

1873
E1 SL

RIDGE
%
CUTOUT
VOID TOW
1450

+4.250 2500
4610 22 14 00
CABOPY ABOVE 2220
6451
6451 K
EL03

7
SKYLIGHT STAMP SIGNATURE

49 8
6000

CUTOUT EY VA
EY

LL
VALL

LLE
2505
2225

VA
LL

Y
VA
EY

ROF-02 SL
OP
E1
10 73 16.13 EL01

19400
%

% %
E1

E1 TOC
SLO

OP
OP

SL +3.950 AOR
PE 1%

SL

5300
SC01

6436
4889 07 71 23
RIDGE
STRUCTURE
C
2995
21700

CUTOUT RIDGE
22 14 00

7715
VALLEY SLOPE 1% EY
FIF06 LL
VA
ROF-02 TOC
% SIGNATURE
+3.955 VAL E1 STAMP
10 73 16.13 LEY SL
OP
J
EY

2267 08 44 13 SLOP
VOID
LL

E 1%
TOC

EY
VA

07 76 13

LL
+3.950

VA
WS07
%

2500 22 14 00
E1

9435 SIGNATURE / DESIGN ARCHITECT


OP

1%
6000

SL

3500
E
4023

OP
8120

2220
%

2500
SL
1

1533
PE

SL O
2225 LO
SL

2500 S
OP

PE
E1

1%
%

3540 2220
VA

H
LL

RIDGE
RIDGE
EY

CONSULTANT
VA

WS06
LL
E
Y

B
SL
OP
E

3000
1%

6497 VOID
VOID
3219

10 73 16.13

07 71 23 VOID

VAL
LEY
SLOP
E 1%

VOID VOID
VOID
VOID G 1.) Conditionally accepted subject to Design
4900

Calculation submission/approval.
VOID

VOID
VOID
VOID 3 2.) Ensure to coordinate with other KEE SAFETY LLC
VOID
contractors i.e. steel post, floor Dubai Investment Park, Near Green Community
P.O Box 18448 Dubai, United Arab Emirates - UAE
A Tel. No.: (+971) 4 - 8859066
drains/plinths locations/etc.
VOID
VOID www.keesafety.ae
VOID
VOID © 2019 Kee Safety LLC. All rights reserved.
VOID VOID VOID
VOID VOID
3.) Correction or comments made relative to KEY PLAN
F
VOID
VOID submittals during this review does not N

relieve the contractor from compliance with


VOID

the requirements of the drawings,


10 73 16.13
specifications and reports. This check is
1
only for review of general conformance with
the design concept of the project and Q
general compliance with the information
given in the contract documents. The GENERAL NOTES
1. ALL STRUCTURAL, MEP, CIVIL AND LANDSCAPING QUERIES ARE TO BE REFERRED

contractor is responsible for complying and


TO THE RELEVANT CONSULTANT DRAWINGS, SPECIFICATIONS AND DETAILS.
2. ALL DESIGN AND CONSTRUCTION TO COMPLY WITH APPLICABLE REGULATIONS AND
LOCAL AUTHORITY REQUIREMENTS

correlating all related standards of the 3. CONTRACTORS AND SUBCONTRACTORS ARE TO CHECK ALL DIMENSIONS AND
LEVELS ON THE BUILDING SITE BEFORE COMMENCING WITH ANY WORK

products, all quantities, dimensions,


4. ANY DISCREPANCY IN THE DRAWINGS, DIMENSIONS & SPECIFICATIONS ARE TO BE
BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO ANY WORK
BEING PUT IN HAND

selection, manufacturing, construction and


5. ONLY FIGURED DIMENSIONS TO BE FOLLOWED - SCALED DIMENSIONS OF

FALL ARREST SYSTEM LAYOUT DRAWINGS WILL NOT BE PERMITTED

1 coordinating his work with that of other


trades and performing his work as per the
REV. DATE REASON FOR ISSUE CHK
project requirements in a safe and PROJECT
ROSEWOOD RESORT
satisfactory manner. TRIPLE BAY, SAUDI ARABIA

KEELINE LEGEND:- BUILDING NAME


VILLA CLUSTER FAMILY TYPE C
EXTREMITY-
E1-P EXTREMITY-TENSIONER IP INTERMEDIATE BRACKET C90-P CORNER 90° E2-P SWAGE END WIRE ROPE -316GR. BUILDING NUMBER
FC
PLOT NUMBER
TB-08
DRAWING TITLE
KEELINE LAYOUT
LOWER ROOF LEVEL

MODEL FILE REFERENCE

DRAWN BY CHECKED BY APPROVED BY


VN MZ MZ
PROJECT NO. ISSUE DATE SCALE @ A1
PART NO. EXT-TEN PART NO. INT-STD PART NO. CNR90 PART NO. EXT-SW PART NO. ROPE8SS7X7
1TB02011 17-12-2023 1 : 100

DRAWING NUMBER REVISION

You might also like