Site Safety Declaration

Company: Abdul Mohsen Al Tamimi

Location: Rosewood Zone 1,2,3 & 4

Date: 31.03.2024

HSE Manager: Eleumar Carmona

Mob: 0532867957

Deputy HSE Manager: Hafiz Khan

Mob: 0559679296

Environmental Manager: Nasrum Minallah Malik

Mob: 0539591649

Supervision details from Construction staff:

Project Manager: Ahmad Atef

Mob:0595006551

Construction Manager: Ahmed El Saeed

Mob: 0582424269

QC Manager: Abbas Faroug

Mob: 0537938347

Logistic Manager Abdullah Alsayar

Mob: 0570939191

Site Engineer: Issa Geagea

Mob: 0570310207

Site Engineer: Mohammad Bader

Mob: 0546996535

Site Engineer: Yousef Melhem

Mob: 0570959658
Activity: Painting, Water proofing, Wall Chasing, Form works and steel fixing, Installation of fall arrest
system, Block works (patching)

On-site heavy Equipment:

Water Tanker = 3

Boom truck= 1

Trailer truck= 1

Wheel Loader = 2

Bob Cat=2

Tele Handler=4

Total Equipment on site: 13

Tools/Equipment at site

Block cutting Machine:

HOH :1

Zone 2(FR Villa):1

Chemical onsite: Bitumen, Hydro Ban

Top 3 hazards and risks:

• Use of Power tools

•Slip, trip and fall

• Dust

STARRT briefings: Yes

Approved MS/ RA: Yes

MS/RA on site and communicated thru briefing: Yes

Approved Permits in place: Yes

LOTO/Conf. space etc.) : N/A


Requirements from Permit: Complied

Summer Heat Stress Arrangement: To be provided

Rest Area W/AC: Rest shelters in prominent locations

Cool Drinking Water at all work areas: Provided

WBGT reading device: To be provided

Flag System In place: To be arrange (Temporary used the existing Flag System from the other contractor)

Work/rest rotation as required: Yes

First aid box onsite: Provided

First Aider Name:

1. Yousef Melhem

Contact No: 0570959658

2. Abdullah Ahmed

Contact No. 0570939191

3. Elavarsan Manjula

Contact No. 0536142930

4. Abdel Wahab

Contact No. 0567473409

Medical Nurse: Ahmed Rahama

Mob: 0530843037

PPE: Provided

PPE as per activity and good condition: Yes

I have been checked some areas and other area inspections ongoing and It has been found needs
further safety improvements, however, acceptable to commence work.

*Daily Site Manpower:

Managers : 6
Engineers : 3

Site Supervisor: 6

Safety Officer: 7

Surveyor: 4

Surveyor helper: 4

Scaffolding Inspector:1

Scaffolding Supervisor: 1

Scaffolding erector: 36

Storekeeper: 1

Driver/Operator: 13

Mason: 30

Plaster Mason: 44

Steel fixer: 7

Carpenter: 13

Welder: 6

Electrician: 1

Painter: 17

Applicator 10

Tile setter: 2

Helper: 40

Housekeeping: 24

Total: 275