Professional Documents
Culture Documents
Instructions:
IA II assessment would aim at analysing the critical aspects of students’ skills and analytical
abilities. It is expected from each group to complete the given study in the assigned time and
share their views with the class through a presentation.
The objective of Project Assignment
This Project work enables students to use and utilize their theoretical understanding of project
management in Identification, selection, planning, conducting, and addressing real-life
practical challenges through the project.
The project will be carried out in the following stages:
a) Objective: This activity not only encourages creative thinking but also helps students
practice their pitching skills.
b) Steps: Organize a "Shark Tank" style competition where students pitch their business ideas
to a panel of judges (professors, entrepreneurs, or investors). Class is required to break up
into groups comprising 5-6 students in each group.
a) Objective: This activity helps students critically assess the viability of their concepts.
b) Steps: Ask students to identify a business idea they are passionate about. Then, guide them
through a SWOT analysis (Strengths, Weaknesses, Opportunities, Threats) for their
chosen idea. Class is required to break up into groups comprising 5-6 students in each
group.
3. Problem-Solution Brainstorming
a) Objective: This activity can help students understand the importance of addressing real
market needs.
b) Steps: The class is required to break up into groups comprising 5 students in each group.
Group-wise students have to present a list of common business problems or challenges and
have students brainstorm innovative solutions.