Professional Documents
Culture Documents
Synopsis
Submitted by
Aditya Shah
200909031
Mechanical Engineering
adisidshah25@gmail.com
9322405511
February, 2024
1. Introduction:
The Wada plant at Blue Star is designed to eventually be Blue Star’s biggest
manufacturing facility. Modern manufacturing systems are being deployed
with the focus on quality systems through programmes like Lean
Manufacturing, Six Sigma, TPM and Kaizen.
They have undertaken a strategic initiative to elevate procurement efficiency
and refine supplier profiling in the B2B category for 3 models of air
conditioners being manufactured there. They are focused on optimizing
processes and strengthening supplier relationships.
This project aims to enhance operational performance, reduce costs, and
align procurement strategies with organizational goals. By adopting
advanced methodologies and fostering collaboration, it aspires to position
itself as a benchmark for industry best practices, contributing to the overall
competitiveness and resilience of Blue Star in the air conditioning and
refrigeration sector.
2. Objectives:
iv. To establish comprehensive supplier profiles for all the suppliers involved
in providing materials for each component of the models being
manufactured in the plant.
3. Methodology:
*The timelines mentioned above are tentative and may change depending on the any unforeseen circumstance and
the time remaining before the end of the internship.
Name of the Company Guide with contact no. and email address: