You are on page 1of 1

Assam Power Distribution Company Limited

Dear Applicant,
This is to inform you that feasibility approval on your request has been granted as per the following
details:
System Generated Sanction No. : NP/203956/2023/S308476
MNRE - NATIONAL PORTAL

Sanction date : 28-02-2024


Application Reference Number : NP/203956/2023
Application Submitted on : 10-11-2023
Name of Applicant : Jabed Ali
Category : Residential
Mobile : 9678771585
Email : imran9678771585@gmail.com
DisCom : Assam Power Distribution Company Limited
Electricity Connection No. : 010000011083
Requested Capacity (in kW) : 1.00
Sanctioned Capacity (in kW) : 1.00
Feasibility Approved By : Sub Division - Capital Electrical Sub-Division
Feasibility Approved on : 28-02-2024
Address of Premises for Installation :
Hatigaon, notboma,near mazar, water supply, pragati path , Guwahati
PIN Code :781038
District : Kamrup Metro
State : ASSAM

Remarks :
Approved

Feasibility approval has been granted on your project/site for 1.00 kW capacity. You may now go ahead for
installation of the rooftop solar system through any of the vendor registered/empanelled with the DISCOM ensuring
fulfilment of terms and conditions of the simplified procedure of Ministry. The applicant has to install the rooftop solar
system within the timeline prescribed in the SOP of Assam Power Distribution Company Limited , failing which the
approval will be cancelled and the applicant will have to submit fresh application thereafter.

From
Assam Power Distribution Company Limited

This is a computer generated format and does not require any signature

Disclaimer: This approval letter does not guarantee the release of Central Government subsidy. Subsidy will be
released only after successful commissioning and inspection of the installed system.

Generated from National Portal of Rooftop Solar - Ministry of New & Renewable Energy / Govt. of India Page 1/1
(National Informatic Centre)

You might also like