Dear Applicant,
This is to inform you that feasibility approval on your request has been granted as per the following
details:
System Generated Sanction No. : NP/203956/2023/S308476
MNRE - NATIONAL PORTAL
Remarks :
Approved
Feasibility approval has been granted on your project/site for 1.00 kW capacity. You may now go ahead for
installation of the rooftop solar system through any of the vendor registered/empanelled with the DISCOM ensuring
fulfilment of terms and conditions of the simplified procedure of Ministry. The applicant has to install the rooftop solar
system within the timeline prescribed in the SOP of Assam Power Distribution Company Limited , failing which the
approval will be cancelled and the applicant will have to submit fresh application thereafter.
From
Assam Power Distribution Company Limited
This is a computer generated format and does not require any signature
Disclaimer: This approval letter does not guarantee the release of Central Government subsidy. Subsidy will be
released only after successful commissioning and inspection of the installed system.
Generated from National Portal of Rooftop Solar - Ministry of New & Renewable Energy / Govt. of India Page 1/1