You are on page 1of 1

Ministry of New and Renewable Energy

Rooftop Solar Division

Application Acknowledgement

Dear Applicant,

Thank you for submitting application at National Portal for installation of rooftop solar system under
MNRE - NATIONAL PORTAL

simplified procedure of Rooftop Solar Programme Phase-II.

Your application details are as follows:


Application Reference Number : NP/694554/2024
Date & Time of submission : 08-03-2024 13:44:52
Name of Applicant : Mr Rakesh kumar
Mobile No. : 6392469092
Email ID : Kushwahaanita366@gmail.com
Electricity Connection No. : 33174576
Sanctioned Load (in kW) : 1.00
Proposed Capacity (in kWp) : 1.00
Existing Solar Capacity on site (in kWp) : 1.00
Address of Premises for Installation :
1523 Durga nagar new basti baktauri puwra nabusta kanpur
PIN Code :208021
District : Kanpur Nagar
State : UTTAR PRADESH

Your application has been submitted to the Kanpur Electric Supply Company Ltd. for feasibility approval. Do not start
the installation of rooftop plants until the feasibility approval is received.

I confirm that the registration is being done by me as an actual consumer and not by any vendor/other representative.
I am also aware that CFA/subsidy will not be provided to me in case the information submitted by me is found to be
false or not in accordance with the MNRE guidelines at any stage of the entire process.

Disclaimer: This is only an acknowledgement for the submitted application. Release of Central Government subsidy
will be only after successful commissioning and inspection of the installed system following due procedure laid down
by Ministry.

This is a system generated acknowledgement and does not require signature

Generated from National Portal of Rooftop Solar - Ministry of New & Renewable Energy / Govt. of India Page 1/1
(National Informatic Centre)

You might also like