You are on page 1of 1

Ministry of New and Renewable Energy

Rooftop Solar Division

Application Acknowledgement

Dear Applicant,

Thank you for submitting application at National Portal for installation of rooftop solar system under
MNRE - NATIONAL PORTAL

simplified procedure of Rooftop Solar Programme Phase-II.

Your application details are as follows:


Application Reference Number : NP/707858/2024
Date & Time of submission : 08-03-2024 22:33:11
Name of Applicant : NEELOFAR
Mobile No. : 9622914199
Email ID : muzafarah06@gmail.com
Electricity Connection No. : 0202020017958
Sanctioned Load (in kW) : 1.25
Proposed Capacity (in kWp) : 5.00
Existing Solar Capacity on site (in kWp) :
Address of Premises for Installation :
GULAB COLONY SD COLONY-BATAMALOO SRINAGAR-KASHMIR-CITY
PIN Code :190001
District : Srinagar
State : JAMMU and KASHMIR

Your application has been submitted to the Kashmir Power Distribution Company Ltd (KPDCL) for feasibility
approval. Do not start the installation of rooftop plants until the feasibility approval is received.

I confirm that the registration is being done by me as an actual consumer and not by any vendor/other representative.
I am also aware that CFA/subsidy will not be provided to me in case the information submitted by me is found to be
false or not in accordance with the MNRE guidelines at any stage of the entire process.

Disclaimer: This is only an acknowledgement for the submitted application. Release of Central Government subsidy
will be only after successful commissioning and inspection of the installed system following due procedure laid down
by Ministry.

This is a system generated acknowledgement and does not require signature

Generated from National Portal of Rooftop Solar - Ministry of New & Renewable Energy / Govt. of India Page 1/1
(National Informatic Centre)

You might also like