ECO TOURISM HUB WATER SUPPLY – WATER REQUIREMENT OF THE PROJECT IS –

PROPOSED PROJECT –
The proposed project site is strategically The total water
located near the seashore & falls under requirement for the
CRZ-III Category.
project is 28.11 KLD. The
Project site is located at Village Mochemad
water storage tank will be
in Vengurla Taluka, Sindhudurg District of
Maharashtra. provided at ground level,
The project site adjoins Arabian Sea, being i.e., UGT (Underground
approximately 300 m away from shoreline. water tank) of capacity
Site is approachable from Mochemad main 33732 Litres, along with a
road which is 6m wide. pump room, and OHT
SITE AREA – 7.38 ACRES, (Overhead water tank)
FSI – 0.33, Tower provision to supply
BUILTABLE AREA - 9859.4166 SQM water by gravity having
capacity of 22488 Litres.

UGT TANK CALCULATIONS 60% OHT TANK CALCULATIONS 40%


Provided are the sizes for UGT, OHT and fire
tank. Fire tank (NBC FIRE NORMS for lodging
room, below height of 15m and Rooms
between 15-35- 5000 litres) capacity terrace
tank should be provided.

FIRE FIGHTING –
Fire hydrants are provided at a
distance of 15m c/c. and at strategic
locations

NAME – TANMAYI DEEPAK S SAWANT


YEAR - 5TH YEAR, DIVISION – B
SECTION LEGEND
THROUGHT UGT,
showing domestic TOILET
and flushing tank
KITCHEN

WATER SUPPLY

OHT

UGT NAME – TANMAYI DEEPAK S SAWANT


YEAR - 5TH YEAR, DIVISION – B
WASTE WATER CALCULATION-
STP (SEWAGE TREATMENT PLANT) TECHNOLOGY –
Water source – During construction phase, water will be supplied by tanker Capacity – 25 KLD
and during operational phase, it will be supplied by municipal water supply Technology – MBBR (Moving bed biofilm Reactor)
and use of treated water supply. Features – It requires semi automatic operation, and minimum maintenance.
The total Fresh water requirement for the project is 28.11 KLD. i.e. domestic Treated water is used for Irrigation, Gardening and Flushing purpose.
supply is 16.87 KLD and flushing use is 11.23 KLD. Out of which 80% of The sewage plant of capacity 25 KLD is proposed to provide 22.25 KLD of
domestic water and 100% of flushing goes for treatment into the STP. 90% treated water for re-use.
of total waste water will be recycled and 10% will be sludge. Sludge would
be used as manure for landscaping. Process for MBBR technology –

WATER
REQUIREMENT

TOTAL WASTE
WATER GENERATED

SLUDGE MANAGEMENT –
Around 2.4 cu.m of sludge will be generated in the proposed project. The
STP DESIGN
CAPACITY
25 KLD sludge from the STP will be used as a manure in landscaping

The wastewater will be treated through Proposed Compact Sewage


Treatment Plant having capacity of 25 KLD. STP will provide water for
gardening and flushing purposes, and will be stored in treated water tanks.
NAME – TANMAYI DEEPAK S SAWANT
YEAR - 5TH YEAR, DIVISION – B
LEGEND
TREATED WATER REUSE – STP

GREY WATER PIPE


Treated water tank – 22.25 KLD
GULLY TRAP (30CM X 30CM)
Flushing use – 11.23 KLD
SEWER LINE

Gardening – 11.05 KLD INSPECTION CHAMBER

NAME – TANMAYI DEEPAK S SAWANT


YEAR - 5TH YEAR, DIVISION – B
STORM WATER DRAINAGE –

The storm water disposal system for the


premises will be self-sufficient to avoid any
collection/stagnation and flooding of water.
Storm water drainage gutters are provided
throughout the periphery of the site in
network of storm water drains, allowing the
storm water to drain out from the site by
providing 2 outfalls leading to the road side.
WATER CONSERVATION –
For horticulture a garden hydrant ring is
proposed.

LEGEND
RAINWATER HARVESTING TANK – OUTFALL
Total rainwater collected in litres is
3372472.742. STORM WATER GUTTER
The roof top rain water will be diverted from roof to the storage tank through PVC
pipes after passing through a filter media. STORM WATER DRAIN
The Rainwater Harvesting tank will
be provided nearby Admin CATCHMENT ROOF RAINWATER
RAIN WATER building and restaurant and water
HARVESTING from the tank will be pumped to RAINWATER TANK
the area of use.
CATCHMENT AREA –
The excess harvested water will be RAIN GARDEN
discharged in Storm water drains.

Harvesting rain water will be


utilised for floor washing, car
washing, gardening.

NAME – TANMAYI DEEPAK S SAWANT


YEAR - 5TH YEAR, DIVISION – B
POWER REQUIREMENT - Total Energy required for the proposed project is 698.5 KW.
LIGHT CALCULATIONS -

SOLAR ENERGY
LEGEND

SOLAR PANEL

TRANSFORMER ROOM

DG SET

Around 181 KW of energy is generated ARCHITECTURAL/CONSTRUCTION ENERGY


AIR CONDITIONING - Provision of 4 Split AC of 1.5 from solar panels. Solar panel provided on EFFICIENCY –
Ton in Conference and meeting rooms. Occupation and Admin building.
Optimising use of natural light and natural ventilation in
ENERGY EFFICIENCY – the project. Most of the total built-up is natural lit
Energy efficiency is achieved by provided during daytime and naturally ventilated.
LED lamps in rooms and Outdoor LED All the cottages are designed to maximize natural light
lamps in gardens, etc. and natural ventilation.
Solar water heaters will be provided in NAME – TANMAYI DEEPAK S SAWANT
cottages. YEAR - 5TH YEAR, DIVISION – B