1. Description
A. Operation 2 gives Corrosion Prevention and Control Program Inspections (Baseline Program) items
that are to be examined every 12 months. Refer to Section 2A-30-00, Corrosion Prevention and
Control Program, for additional information concerning repeat Corrosion Program Inspection intervals.
B. Inspection items are given in the order of the zone in which the inspection is to be completed.
Frequently, tasks give more information about each required inspection.
C. The right portion of each page gives space for the mechanic's and inspector's initials and remarks. A
copy of these pages can be used as a checklist when these inspections are completed.