You are on page 1of 5

PLUMBING NOTES MINIMUM FIXTURE BRANCH PIPE SIZE

1. IT IS NOT INTENDED THAT THE DRAWINGS SHALL SHOW EVERY PIPE FITTING, VALVE AND
APPURTENANCE, ALL SUCH ITEMS WHETHER SPECIFICALLY MENTIONED OR NOT, OR WATER SUPPLY SANITARY DRAINAGE
INDICATED ON THE DRAWINGS SHALL BE FURNISHED AND INSTALLED IF NECESSARY TO
FIXTURE TYPE
COMPLETE THE SYSTEM TO THE SATISFACTION OF THE OWNER. WATER CLOSET (FLUSH VALVE) 25 MM Ø (1") 100 MM Ø (4")

WATER CLOSET (FLUSH TANK) 20 MM Ø (1/2") 100 MM Ø (4")


2. ALL PLUMBING WORKS SHALL BE INSTALLED IN ACCORDANCE WITH THE PROVISION OF THE
NATIONAL PLUMBING CODE OF THE PHILIPPINES, THE REQUIREMENTS OF THE LOCAL URINAL (FLUSH VALVE) 20 MM Ø (3/4") 50 MM Ø (3")
PLUMBING INSPECTION OFFICE, PERTINENT PROVISIONS OF THE UNIFORM BUILDING CODE
AND UNIFORM PLUMBING CODE. LAVATORY 20 MM Ø (1/2") 50 MM Ø (3")

SHOWER 20 MM Ø (1/2") 50 MM Ø (3")


3. ALL PLUMBING INSTALLATION SHALL BE COORDINATED WITH OTHER TRADES. ANY REVISION
IN THE PIPING LAYOUT REQUIRED FOR PROPER EXECUTION OF OTHER TRADES SHALL BE WITH KITCHEN / PANTRY SINK 20 MM Ø (1/2") 50 MM Ø (3")
PRIOR APPROVAL OF THE ENGINEER.
SINK (FLUSHING RIM CLINIC) 20 MM Ø (1/2") 75 MM Ø (3")
4. HORIZONTAL SANITARY SEWER PIPING SHALL BE RUN IN PRACTICAL ALIGNMENT AT A SERVICE / SLOP SINK 20 MM Ø (1/2") 75 MM Ø (3")
MINIMUM SLOPE OF 1% FOR PIPES 100MMØ AND LARGER AND 2& FOR 75MMØ AND SMALLER.

5. ALL VENT PIPES SHALL BE FREE FROM DROPS OR SAGS AND SHALL BE SLOPED OR GRADED
AS TO DRIP BACK BY GRAVITY TO THE DRAINAGE PIPE IT SERVES.

6. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT SITE, THAT IS, THE ACTUAL IGLESIA NI KRISTO

PIPE SIZES, LOCATIONS, DEPTHS, TOP & INVERT ELEVATIONS OF ALL EXISTING PIPES AND
SCHOOL FOR MINISTERS

RELATED STRUCTURES. THE CONTRACTOR SHALL PROVIDE THE NECESSARY EXCAVATIONS, CENTRAL AVENUE
CENTRAL AVENUE
CENTRAL AVENUE

BACKFILLING & SURFACE RESTORATION OF THE AFFECTED AREAS IN THE LAYING OF LEGEND, SYMBOLS & ABBREVIATION CONCENTRIX

SEWER & WATER SUPPLY LINES. UP TECHNOHUB


BUILDING M
UP AYALA TECHNOHUB UP AYALA TECHNOHUB

VSTR VENT STACK THRU ROOF ARBORETUM


FOREST
BUILDING N BUILDING O

PNRI ADMINISTRATION,
SVTR STACK VENT THRU ROOF REGULATORY & TRAINING
BUILDING

7. THE WATER DISTRIBUTION LINE SHALL HAVE A MINIMUM COVER OF 750MM. PROVIDE SS SOIL STACK
UP TECHNOHUB
BUILDING L

CONCRETE ENCASEMENT FOR LESS THAN 750MM PIPE COVER VS VENT STACK PHILIPPINE NUCLEAR
REASERCH INSTITUTE SITE
ASIAN INSTITUTE
OF TOURISM

MANULIFE
BUSINESS
FD FLOOR DRAIN PROCESSING
SERVICES

8. CONCRETE THRUST BLOCKS SHALL BE PROVIDED IN ACCORDANCE WITH THE STANDARD FCO FLOOR CLEAN OUT FCO MICROTEL BY WYNDHAM
AV
EN
UE
UP TECHNOHUB H
LT
EA
LAV LAVATORY W

DETAIL DRAWINGS AT ALL BENDS, TEES, VALVES, REDUCERS & PLUGS EXCEPT WHERE WC WATER CLOSET
CO
MM
ON

UE

WELDED JOINTS ARE SHOWN OR SPECIFIED. SHO SHOWER HSBC ELECTRONIC DATA
PROCESSING W
EA
LT
H
AV
EN

ON
MM
DP` DRAIN PORT CO
CONCENTRIX
BUILDING D

9. PROVIDE VALVE BOX FOR EACH EMBEDDED GATE VALVE AC AIR CHAMBER MANULIFE BUSINESS
PROCESSING SERVICES

DS DOWNSPOUT
GV GATE VALVE POINTWEST
UE

10. ALL DIMENSIONS & PIPE SIZES ARE IN MILLIMETERS UNLESS OTHERWISE SHOWN. EWH ELECTRIC WATER HEATER EWH
UP AYALA
TECHNOHUB
BUILDING I
UP AYALA
TECHNOHUB
BUILDING J
INNOVATIONS
CORP.

EA
LT
H
AV
EN

MAGSAYSAY AVE.
NW
UP AYALA TECHNOHUB M MO
E CO
RD ROOF DRAIN H
AV
ENU
COMMISSION ON BONIFACIO HALL
LT

11. ALL PIPE SIZES SHOWN ON PLAN WERE SIZED ACCORDING TO THEIR INSIDE DIAMETER EA HUMAN RIGHTS
CB CATCH BASIN UP AYALA
TECHNOHUB MM
ON
W

CENTRAL PARK CO R.P. DE GUZMAN


RED REDUCER
UP AYALA IBM BUILDING E
TECHNOHUB

1 LOCATION MAP
P-1 NOT TO SCALE

PROJECT TITLE: REVIEWED BY: CONCURRED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENTS: DESIGNED BY: SHEET NO.
N.C.S.
Department of Science and Technology
Philippine Nuclear Research Institute GENERAL NOTES
DESIGN DEV'T: E.A.D.R.
LOCATION MAP
E. A. RAMIREZ CONSTRUCTION, INC. Innovating Nuclear Medicine Research and Services: FIXTURE BRANCH
P-1
DRAWING PRODUCTION: E.A.D.R.
DESIGNER DEVELOPER BUILDER Ed Angelo D. Ramirez Development of Emerging PET Radiopharmaceuticals PIPE SIZE
PROJECT MANAGER for Early Cancer Staging and Assessment of Biological LEGENDS & SYMBOLS ACAD BY: M.M.J.D.G.
Location : EARCON Bldg., 31 Commonwealth Ave. Ext., Brgy. Sta. Monica, Quezon City 1117
Tels. +63 9259169 Telefax. +63 2779125 Functions in Cancer Cells (C.Y. 2021) (Phase 2) PAGE NO. OF TOTAL NO.
Engr. Rosalino B. Rejas Engr. Arturo F. Salih Engr. Andrew C. Barrida Engr. Renato T. Bañaga Adelina DM. Bulos Preciosa Corazon B. Pabroa, Ph. D. Vallerie Ann I. Samson, Ph. D. Carlo A. Arcilla, Ph. D. CHECKED BY: OF PAGES
LOCATION: PNRI Compound, Commonwealth Avenue, Diliman, Quezon City
SENIOR SCIENCE RESEARCH SPECIALIST SENIOR SCIENCE RESEARCH SPECIALIST ENGINEER II ESS HEAD END-USER/ ITS HEAD NSD CHIEF OIC, DEPUTY DIRECTOR DIRECTOR

PROJECT NUMBER: 15 19 OF
1 1' 1" 2 3 4 5 6 6' 7 8 9 10 10' 11 12 13 13' 14

65500
8500
500 1400 2350 4250 6000 4600 6000 2400 2400 5500 5000 7100 2400 2600 6850 6150 1500 1100

1250 1200
10% SLOPE
RAMP DOWN

A"
2450

2450
FCO FCO FCO FCO FCO
FCO FCO FCO
FCO FCO FCO FCO TO SEPTIC
TANK

A DP` SINK
FCO FCO
1900

FD

6050
FCO DP`
A'

4750
FD

50 mmØ VP
FD
2800

SINK 75 mmØ VP 75 mmØ VP


FCO SINK TO SEPTIC
FD FD TANK

SINK SINK

B
50 mmØ VP

FD
WC
FCO
3000

75 mmØ VP
FD
LAV 50 mmØ VP 50 mmØ VP
FCO
SINK

C FCO

50 mmØ VP

4350
50 mmØ VP
SINK
2800

75 mmØ VP FCO
25450

25450
50 mmØ VP
SLAB LINE

FCO SINK SINK


D'
700

CYCLOTRON LINE
D

23000
75 mmØ VP
UP
3200

CONSTRUCTION JOINT
50 mmØ VP 50 mmØ VP

E SLAB LINE

UR
SINK

SINK
2000

1000

3.7% SLOPE
ELEV. +1200
DP`
FCO

CYCLOTRON LINE
RAMP
9.0% SLOPE
FD DP`

12500
LANDING
FD LAV FD
ELEV. +0400
WC SINK DP`
850

75 mmØ VP

E' WC
FD LAV
15.7% SLOPE
11.8% SLOPE

UP FD
FCO
FCO FCO

F UP
FCO

FD
SLAB LINE

UP

Mid-Landing
UP to Mezzanine

G SLAB LINE

1300
1250 2400
3650 2225

9000
8250 6250 10550 5325 18000
4600 6000 2350 2400 5500 5000 12100 6850 6150
65500

WALL LEGENDS LEGENDS


150mm thk. CHB W/ 10mmØ DEF. REBAR @ 0.60 O.C. B.W.
RADIOACTIVE

150
WP WASTE PIPE RWP
WASTE PIPE
200mm thk. REINFORCED CONCRETE WALL (Phase 1)

200
SVTR SOIL VENT
WL WATER LINE
THRU ROOF

1 GROUND FLOOR SEWER LINE LAYOUT


P-2 SCALE 1:100m

PROJECT TITLE: REVIEWED BY: CONCURRED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENTS: DESIGNED BY: SHEET NO.
N.C.S.
Department of Science and Technology
Philippine Nuclear Research Institute GROUND FLOOR DESIGN DEV'T: E.A.D.R.
E. A. RAMIREZ CONSTRUCTION, INC. Innovating Nuclear Medicine Research and Services: SEWER LINE LAYOUT
DRAWING PRODUCTION: P-2
Development of Emerging PET Radiopharmaceuticals E.A.D.R.
DESIGNER DEVELOPER BUILDER Ed Angelo D. Ramirez
PROJECT MANAGER for Early Cancer Staging and Assessment of Biological ACAD BY: M.M.J.D.G.
Location : EARCON Bldg., 31 Commonwealth Ave. Ext., Brgy. Sta. Monica, Quezon City 1117
Tels. +63 9259169 Telefax. +63 2779125 Functions in Cancer Cells (C.Y. 2021) (Phase 2) PAGE NO. OF TOTAL NO.
Engr. Rosalino B. Rejas Engr. Arturo F. Salih Engr. Andrew C. Barrida Engr. Renato T. Bañaga Adelina DM. Bulos Preciosa Corazon B. Pabroa, Ph. D. Vallerie Ann I. Samson, Ph. D. Carlo A. Arcilla, Ph. D. CHECKED BY: OF PAGES
LOCATION: PNRI Compound, Commonwealth Avenue, Diliman, Quezon City
SENIOR SCIENCE RESEARCH SPECIALIST SENIOR SCIENCE RESEARCH SPECIALIST ENGINEER II ESS HEAD END-USER/ ITS HEAD NSD CHIEF OIC, DEPUTY DIRECTOR DIRECTOR

PROJECT NUMBER: 16 19 OF
1 1' 1" 2 3 4 5 6 6' 7 8 9 10 10' 11 12 13 13' 14

65500
8500
500 1400 2350 4250 6000 4600 6000 2400 2400 5500 5000 7100 2400 2600 6850 6150 1500 1100

1250 1200
A"
2450

2450
WC FD LAV SINK FD
HOT
SINK
TOILET 4
A FCO
FD HOT LAB 2
1900

FD

6050
75 mmØ VP

50 mmØ VP
A' 50 mmØ VP
FCO

75 mmØ VP
HOT

4750
WC FD
50 mmØ VP

TOILET 3
LAV LAV WC FDLAV
FD
2800

FD FCO
FCO FD HOT LAB 1
FCO HOT
WC
FD UR TOILET 2

B UR WC LAV
50 mmØ VP

FD SINK
FD
FCO FD
3000

FCO HOT
WC
FD LAV TOILET 1
WC
FD LAV

C UP

4350
2800
25450

25450
D'
700

CYCLOTRON LINE
D

23000
75 mmØ VP
DOWN
3200

CONSTRUCTION JOINT
E
2000

FCO

CYCLOTRON LINE

12500
SINK 50 mmØ VP
850

E' FCO
FD FCO
FD
WC
PANTRY
75 mmØ VP

EXPERT'S ROOM FD
WC FD LAV

F FD
WC FD LAV
75 mmØ VP
75 mmØ VP
LAV

FCO
UR
LAV DOWN
FACILITY MANAGER'S FD
OFFICE
FCO WC
FD

1300
1250 2400
3650 2225

9000
8250 6250 10550 5325 18000
4600 6000 2350 2400 5500 5000 12100 6850 6150
65500

WALL LEGENDS LEGENDS


150mm thk. CHB W/ 10mmØ DEF. REBAR @ 0.60 O.C. B.W.
RADIOACTIVE

150
WP WASTE PIPE RWP
WASTE PIPE
200mm thk. REINFORCED CONCRETE WALL (Phase 1)

200
SVTR SOIL VENT
WL WATER LINE
THRU ROOF

1 SECOND FLOOR SEWER LINE LAYOUT


P-3 SCALE 1:100m

PROJECT TITLE: REVIEWED BY: CONCURRED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENTS: DESIGNED BY: SHEET NO.
N.C.S.
Department of Science and Technology
Philippine Nuclear Research Institute SECOND FLOOR DESIGN DEV'T: E.A.D.R.
E. A. RAMIREZ CONSTRUCTION, INC. Innovating Nuclear Medicine Research and Services: SEWER LINE LAYOUT
DRAWING PRODUCTION: P-3
Development of Emerging PET Radiopharmaceuticals E.A.D.R.
DESIGNER DEVELOPER BUILDER Ed Angelo D. Ramirez
PROJECT MANAGER for Early Cancer Staging and Assessment of Biological ACAD BY: M.M.J.D.G.
Location : EARCON Bldg., 31 Commonwealth Ave. Ext., Brgy. Sta. Monica, Quezon City 1117
Tels. +63 9259169 Telefax. +63 2779125 Functions in Cancer Cells (C.Y. 2021) (Phase 2) PAGE NO. OF TOTAL NO.
Engr. Rosalino B. Rejas Engr. Arturo F. Salih Engr. Andrew C. Barrida Engr. Renato T. Bañaga Adelina DM. Bulos Preciosa Corazon B. Pabroa, Ph. D. Vallerie Ann I. Samson, Ph. D. Carlo A. Arcilla, Ph. D. CHECKED BY: OF PAGES
LOCATION: PNRI Compound, Commonwealth Avenue, Diliman, Quezon City
SENIOR SCIENCE RESEARCH SPECIALIST SENIOR SCIENCE RESEARCH SPECIALIST ENGINEER II ESS HEAD END-USER/ ITS HEAD NSD CHIEF OIC, DEPUTY DIRECTOR DIRECTOR

PROJECT NUMBER: 17 19 OF
1 1' 1" 2 3 4 5 6 6' 7 8 9 10 10' 11 12 13 13' 14

65500
8500
500 1400 2350 4250 6000 4600 6000 2400 2400 5500 5000 7100 2400 2600 6850 6150 1500 1100

1250 1200
10% SLOPE
RAMP DOWN

A"
2450

2450
A
1900

6050
TO WATER

A' METER

4750
BUILDING WATER
2800

SYSTEM

B WC
TOILET
3000

LAV

4350
2800

GRADE D GOWNING
25450

25450
SLAB LINE

SINK
D'
700

CYCLOTRON LINE
D

23000
UP
3200

PERSONNEL

CONSTRUCTION JOINT
MONITORING
& WASHING
SINK
E SLAB LINE
2000

UR
1000

ELEV. +1200 3.7% SLOPE

TOILET
(Male) GOWNING

CYCLOTRON LINE
RAMP
9.0% SLOPE ROOM

12500
LANDING
ELEV. +0400
WC LAV
850

E' 15.7% SLOPE


WC LAV SINK
11.8% SLOPE

UP TOILET
(Female)

F UP SLAB LINE

UP

Mid-Landing
UP to Mezzanine

G SLAB LINE

1300
1250 2400
3650 2225

9000
8250 6250 10550 5325 18000
4600 6000 2350 2400 5500 5000 12100 6850 6150
65500

WALL LEGENDS LEGENDS


150mm thk. CHB W/ 10mmØ DEF. REBAR @ 0.60 O.C. B.W.
RADIOACTIVE

150
WP WASTE PIPE RWP
WASTE PIPE
200mm thk. REINFORCED CONCRETE WALL (Phase 1)

200
SVTR SOIL VENT
WL WATER LINE
THRU ROOF

1 GROUND FLOOR WATER LINE LAYOUT


P-4 SCALE 1:100m

PROJECT TITLE: REVIEWED BY: CONCURRED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENTS: DESIGNED BY: SHEET NO.
N.C.S.
Department of Science and Technology
Philippine Nuclear Research Institute GROUND FLOOR DESIGN DEV'T: E.A.D.R.
E. A. RAMIREZ CONSTRUCTION, INC. Innovating Nuclear Medicine Research and Services: WATER LINE LAYOUT
P-4
DRAWING PRODUCTION: E.A.D.R.
DESIGNER DEVELOPER BUILDER Ed Angelo D. Ramirez Development of Emerging PET Radiopharmaceuticals
PROJECT MANAGER for Early Cancer Staging and Assessment of Biological ACAD BY: M.M.J.D.G.
Location : EARCON Bldg., 31 Commonwealth Ave. Ext., Brgy. Sta. Monica, Quezon City 1117
Tels. +63 9259169 Telefax. +63 2779125 Functions in Cancer Cells (C.Y. 2021) (Phase 2) PAGE NO. OF TOTAL NO.
Engr. Rosalino B. Rejas Engr. Arturo F. Salih Engr. Andrew C. Barrida Engr. Renato T. Bañaga Adelina DM. Bulos Preciosa Corazon B. Pabroa, Ph. D. Vallerie Ann I. Samson, Ph. D. Carlo A. Arcilla, Ph. D. CHECKED BY: OF PAGES
LOCATION: PNRI Compound, Commonwealth Avenue, Diliman, Quezon City
SENIOR SCIENCE RESEARCH SPECIALIST SENIOR SCIENCE RESEARCH SPECIALIST ENGINEER II ESS HEAD END-USER/ ITS HEAD NSD CHIEF OIC, DEPUTY DIRECTOR DIRECTOR

PROJECT NUMBER: 18 19 OF
1 1' 1" 2 3 4 5 6 6' 7 8 9 10 10' 11 12 13 13' 14

65500
8500
500 1400 2350 4250 6000 4600 6000 2400 2400 5500 5000 7100 2400 2600 6850 6150 1500 1100

X DS DS DS DS DS DS DS DS DS DS

1250 1200
A"
2450

2450
GV
SINK
WC LAV JANITORIAL

A HOT HOT LAB 2


TOILET 4
1900

DS DS

6050
HOT
TOILET 3
A'

4750
GV GV WC LAV
WC LAV LAV GV
2800

CONSULTANT'S
WC TOILET
HOT LAB 1
TOILET (F) HOT
UR TOILET 2

B UR
TOILET (M)
WC LAV
GV
SINK GV

HOT
3000

WC LAV TOILET 1

GV
WC LAV
GV

C UP

4350
2800
25450

25450
D'
700

CYCLOTRON LINE
D

23000
DOWN
3200

CONSTRUCTION JOINT
E
2000

CYCLOTRON LINE

12500
SINK
850

E' TOILET WC
PANTRY

EXPERT'S ROOM
WC LAV
GV LAV
F WC LAV GV
GV

UR GV

LAV DOWN
FACILITY MANAGER'S
OFFICE
WC

1300
1250 2400
3650 2225

9000
8250 6250 10550 5325 18000
4600 6000 2350 2400 5500 5000 12100 6850 6150
65500

WALL LEGENDS LEGENDS


150mm thk. CHB W/ 10mmØ DEF. REBAR @ 0.60 O.C. B.W.
RADIOACTIVE

150
WP WASTE PIPE RWP
WASTE PIPE
200mm thk. REINFORCED CONCRETE WALL (Phase 1)

200
SVTR SOIL VENT
WL WATER LINE
THRU ROOF

1 SECOND FLOOR WATER LINE LAYOUT


P-5 SCALE 1:100m

PROJECT TITLE: REVIEWED BY: CONCURRED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENTS: DESIGNED BY: SHEET NO.
N.C.S.
Department of Science and Technology
Philippine Nuclear Research Institute SECOND FLOOR DESIGN DEV'T: E.A.D.R.
E. A. RAMIREZ CONSTRUCTION, INC. Innovating Nuclear Medicine Research and Services: WATER LINE LAYOUT
P-5
DRAWING PRODUCTION: E.A.D.R.
DESIGNER DEVELOPER BUILDER Ed Angelo D. Ramirez Development of Emerging PET Radiopharmaceuticals
PROJECT MANAGER for Early Cancer Staging and Assessment of Biological ACAD BY: M.M.J.D.G.
Location : EARCON Bldg., 31 Commonwealth Ave. Ext., Brgy. Sta. Monica, Quezon City 1117
Tels. +63 9259169 Telefax. +63 2779125 Functions in Cancer Cells (C.Y. 2021) (Phase 2) PAGE NO. OF TOTAL NO.
Engr. Rosalino B. Rejas Engr. Arturo F. Salih Engr. Andrew C. Barrida Engr. Renato T. Bañaga Adelina DM. Bulos Preciosa Corazon B. Pabroa, Ph. D. Vallerie Ann I. Samson, Ph. D. Carlo A. Arcilla, Ph. D. CHECKED BY: OF PAGES
LOCATION: PNRI Compound, Commonwealth Avenue, Diliman, Quezon City
SENIOR SCIENCE RESEARCH SPECIALIST SENIOR SCIENCE RESEARCH SPECIALIST ENGINEER II ESS HEAD END-USER/ ITS HEAD NSD CHIEF OIC, DEPUTY DIRECTOR DIRECTOR

PROJECT NUMBER: 19 19 OF