1. IT IS NOT INTENDED THAT THE DRAWINGS SHALL SHOW EVERY PIPE FITTING, VALVE AND
APPURTENANCE, ALL SUCH ITEMS WHETHER SPECIFICALLY MENTIONED OR NOT, OR WATER SUPPLY SANITARY DRAINAGE
INDICATED ON THE DRAWINGS SHALL BE FURNISHED AND INSTALLED IF NECESSARY TO
FIXTURE TYPE
COMPLETE THE SYSTEM TO THE SATISFACTION OF THE OWNER. WATER CLOSET (FLUSH VALVE) 25 MM Ø (1") 100 MM Ø (4")
5. ALL VENT PIPES SHALL BE FREE FROM DROPS OR SAGS AND SHALL BE SLOPED OR GRADED
AS TO DRIP BACK BY GRAVITY TO THE DRAINAGE PIPE IT SERVES.
6. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT SITE, THAT IS, THE ACTUAL IGLESIA NI KRISTO
PIPE SIZES, LOCATIONS, DEPTHS, TOP & INVERT ELEVATIONS OF ALL EXISTING PIPES AND
SCHOOL FOR MINISTERS
RELATED STRUCTURES. THE CONTRACTOR SHALL PROVIDE THE NECESSARY EXCAVATIONS, CENTRAL AVENUE
CENTRAL AVENUE
CENTRAL AVENUE
BACKFILLING & SURFACE RESTORATION OF THE AFFECTED AREAS IN THE LAYING OF LEGEND, SYMBOLS & ABBREVIATION CONCENTRIX
PNRI ADMINISTRATION,
SVTR STACK VENT THRU ROOF REGULATORY & TRAINING
BUILDING
7. THE WATER DISTRIBUTION LINE SHALL HAVE A MINIMUM COVER OF 750MM. PROVIDE SS SOIL STACK
UP TECHNOHUB
BUILDING L
CONCRETE ENCASEMENT FOR LESS THAN 750MM PIPE COVER VS VENT STACK PHILIPPINE NUCLEAR
REASERCH INSTITUTE SITE
ASIAN INSTITUTE
OF TOURISM
MANULIFE
BUSINESS
FD FLOOR DRAIN PROCESSING
SERVICES
8. CONCRETE THRUST BLOCKS SHALL BE PROVIDED IN ACCORDANCE WITH THE STANDARD FCO FLOOR CLEAN OUT FCO MICROTEL BY WYNDHAM
AV
EN
UE
UP TECHNOHUB H
LT
EA
LAV LAVATORY W
DETAIL DRAWINGS AT ALL BENDS, TEES, VALVES, REDUCERS & PLUGS EXCEPT WHERE WC WATER CLOSET
CO
MM
ON
UE
WELDED JOINTS ARE SHOWN OR SPECIFIED. SHO SHOWER HSBC ELECTRONIC DATA
PROCESSING W
EA
LT
H
AV
EN
ON
MM
DP` DRAIN PORT CO
CONCENTRIX
BUILDING D
9. PROVIDE VALVE BOX FOR EACH EMBEDDED GATE VALVE AC AIR CHAMBER MANULIFE BUSINESS
PROCESSING SERVICES
DS DOWNSPOUT
GV GATE VALVE POINTWEST
UE
10. ALL DIMENSIONS & PIPE SIZES ARE IN MILLIMETERS UNLESS OTHERWISE SHOWN. EWH ELECTRIC WATER HEATER EWH
UP AYALA
TECHNOHUB
BUILDING I
UP AYALA
TECHNOHUB
BUILDING J
INNOVATIONS
CORP.
EA
LT
H
AV
EN
MAGSAYSAY AVE.
NW
UP AYALA TECHNOHUB M MO
E CO
RD ROOF DRAIN H
AV
ENU
COMMISSION ON BONIFACIO HALL
LT
11. ALL PIPE SIZES SHOWN ON PLAN WERE SIZED ACCORDING TO THEIR INSIDE DIAMETER EA HUMAN RIGHTS
CB CATCH BASIN UP AYALA
TECHNOHUB MM
ON
W
1 LOCATION MAP
P-1 NOT TO SCALE
PROJECT TITLE: REVIEWED BY: CONCURRED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENTS: DESIGNED BY: SHEET NO.
N.C.S.
Department of Science and Technology
Philippine Nuclear Research Institute GENERAL NOTES
DESIGN DEV'T: E.A.D.R.
LOCATION MAP
E. A. RAMIREZ CONSTRUCTION, INC. Innovating Nuclear Medicine Research and Services: FIXTURE BRANCH
P-1
DRAWING PRODUCTION: E.A.D.R.
DESIGNER DEVELOPER BUILDER Ed Angelo D. Ramirez Development of Emerging PET Radiopharmaceuticals PIPE SIZE
PROJECT MANAGER for Early Cancer Staging and Assessment of Biological LEGENDS & SYMBOLS ACAD BY: M.M.J.D.G.
Location : EARCON Bldg., 31 Commonwealth Ave. Ext., Brgy. Sta. Monica, Quezon City 1117
Tels. +63 9259169 Telefax. +63 2779125 Functions in Cancer Cells (C.Y. 2021) (Phase 2) PAGE NO. OF TOTAL NO.
Engr. Rosalino B. Rejas Engr. Arturo F. Salih Engr. Andrew C. Barrida Engr. Renato T. Bañaga Adelina DM. Bulos Preciosa Corazon B. Pabroa, Ph. D. Vallerie Ann I. Samson, Ph. D. Carlo A. Arcilla, Ph. D. CHECKED BY: OF PAGES
LOCATION: PNRI Compound, Commonwealth Avenue, Diliman, Quezon City
SENIOR SCIENCE RESEARCH SPECIALIST SENIOR SCIENCE RESEARCH SPECIALIST ENGINEER II ESS HEAD END-USER/ ITS HEAD NSD CHIEF OIC, DEPUTY DIRECTOR DIRECTOR
PROJECT NUMBER: 15 19 OF
1 1' 1" 2 3 4 5 6 6' 7 8 9 10 10' 11 12 13 13' 14
65500
8500
500 1400 2350 4250 6000 4600 6000 2400 2400 5500 5000 7100 2400 2600 6850 6150 1500 1100
1250 1200
10% SLOPE
RAMP DOWN
A"
2450
2450
FCO FCO FCO FCO FCO
FCO FCO FCO
FCO FCO FCO FCO TO SEPTIC
TANK
A DP` SINK
FCO FCO
1900
FD
6050
FCO DP`
A'
4750
FD
50 mmØ VP
FD
2800
SINK SINK
B
50 mmØ VP
FD
WC
FCO
3000
75 mmØ VP
FD
LAV 50 mmØ VP 50 mmØ VP
FCO
SINK
C FCO
50 mmØ VP
4350
50 mmØ VP
SINK
2800
75 mmØ VP FCO
25450
25450
50 mmØ VP
SLAB LINE
CYCLOTRON LINE
D
23000
75 mmØ VP
UP
3200
CONSTRUCTION JOINT
50 mmØ VP 50 mmØ VP
E SLAB LINE
UR
SINK
SINK
2000
1000
3.7% SLOPE
ELEV. +1200
DP`
FCO
CYCLOTRON LINE
RAMP
9.0% SLOPE
FD DP`
12500
LANDING
FD LAV FD
ELEV. +0400
WC SINK DP`
850
75 mmØ VP
E' WC
FD LAV
15.7% SLOPE
11.8% SLOPE
UP FD
FCO
FCO FCO
F UP
FCO
FD
SLAB LINE
UP
Mid-Landing
UP to Mezzanine
G SLAB LINE
1300
1250 2400
3650 2225
9000
8250 6250 10550 5325 18000
4600 6000 2350 2400 5500 5000 12100 6850 6150
65500
150
WP WASTE PIPE RWP
WASTE PIPE
200mm thk. REINFORCED CONCRETE WALL (Phase 1)
200
SVTR SOIL VENT
WL WATER LINE
THRU ROOF
PROJECT TITLE: REVIEWED BY: CONCURRED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENTS: DESIGNED BY: SHEET NO.
N.C.S.
Department of Science and Technology
Philippine Nuclear Research Institute GROUND FLOOR DESIGN DEV'T: E.A.D.R.
E. A. RAMIREZ CONSTRUCTION, INC. Innovating Nuclear Medicine Research and Services: SEWER LINE LAYOUT
DRAWING PRODUCTION: P-2
Development of Emerging PET Radiopharmaceuticals E.A.D.R.
DESIGNER DEVELOPER BUILDER Ed Angelo D. Ramirez
PROJECT MANAGER for Early Cancer Staging and Assessment of Biological ACAD BY: M.M.J.D.G.
Location : EARCON Bldg., 31 Commonwealth Ave. Ext., Brgy. Sta. Monica, Quezon City 1117
Tels. +63 9259169 Telefax. +63 2779125 Functions in Cancer Cells (C.Y. 2021) (Phase 2) PAGE NO. OF TOTAL NO.
Engr. Rosalino B. Rejas Engr. Arturo F. Salih Engr. Andrew C. Barrida Engr. Renato T. Bañaga Adelina DM. Bulos Preciosa Corazon B. Pabroa, Ph. D. Vallerie Ann I. Samson, Ph. D. Carlo A. Arcilla, Ph. D. CHECKED BY: OF PAGES
LOCATION: PNRI Compound, Commonwealth Avenue, Diliman, Quezon City
SENIOR SCIENCE RESEARCH SPECIALIST SENIOR SCIENCE RESEARCH SPECIALIST ENGINEER II ESS HEAD END-USER/ ITS HEAD NSD CHIEF OIC, DEPUTY DIRECTOR DIRECTOR
PROJECT NUMBER: 16 19 OF
1 1' 1" 2 3 4 5 6 6' 7 8 9 10 10' 11 12 13 13' 14
65500
8500
500 1400 2350 4250 6000 4600 6000 2400 2400 5500 5000 7100 2400 2600 6850 6150 1500 1100
1250 1200
A"
2450
2450
WC FD LAV SINK FD
HOT
SINK
TOILET 4
A FCO
FD HOT LAB 2
1900
FD
6050
75 mmØ VP
50 mmØ VP
A' 50 mmØ VP
FCO
75 mmØ VP
HOT
4750
WC FD
50 mmØ VP
TOILET 3
LAV LAV WC FDLAV
FD
2800
FD FCO
FCO FD HOT LAB 1
FCO HOT
WC
FD UR TOILET 2
B UR WC LAV
50 mmØ VP
FD SINK
FD
FCO FD
3000
FCO HOT
WC
FD LAV TOILET 1
WC
FD LAV
C UP
4350
2800
25450
25450
D'
700
CYCLOTRON LINE
D
23000
75 mmØ VP
DOWN
3200
CONSTRUCTION JOINT
E
2000
FCO
CYCLOTRON LINE
12500
SINK 50 mmØ VP
850
E' FCO
FD FCO
FD
WC
PANTRY
75 mmØ VP
EXPERT'S ROOM FD
WC FD LAV
F FD
WC FD LAV
75 mmØ VP
75 mmØ VP
LAV
FCO
UR
LAV DOWN
FACILITY MANAGER'S FD
OFFICE
FCO WC
FD
1300
1250 2400
3650 2225
9000
8250 6250 10550 5325 18000
4600 6000 2350 2400 5500 5000 12100 6850 6150
65500
150
WP WASTE PIPE RWP
WASTE PIPE
200mm thk. REINFORCED CONCRETE WALL (Phase 1)
200
SVTR SOIL VENT
WL WATER LINE
THRU ROOF
PROJECT TITLE: REVIEWED BY: CONCURRED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENTS: DESIGNED BY: SHEET NO.
N.C.S.
Department of Science and Technology
Philippine Nuclear Research Institute SECOND FLOOR DESIGN DEV'T: E.A.D.R.
E. A. RAMIREZ CONSTRUCTION, INC. Innovating Nuclear Medicine Research and Services: SEWER LINE LAYOUT
DRAWING PRODUCTION: P-3
Development of Emerging PET Radiopharmaceuticals E.A.D.R.
DESIGNER DEVELOPER BUILDER Ed Angelo D. Ramirez
PROJECT MANAGER for Early Cancer Staging and Assessment of Biological ACAD BY: M.M.J.D.G.
Location : EARCON Bldg., 31 Commonwealth Ave. Ext., Brgy. Sta. Monica, Quezon City 1117
Tels. +63 9259169 Telefax. +63 2779125 Functions in Cancer Cells (C.Y. 2021) (Phase 2) PAGE NO. OF TOTAL NO.
Engr. Rosalino B. Rejas Engr. Arturo F. Salih Engr. Andrew C. Barrida Engr. Renato T. Bañaga Adelina DM. Bulos Preciosa Corazon B. Pabroa, Ph. D. Vallerie Ann I. Samson, Ph. D. Carlo A. Arcilla, Ph. D. CHECKED BY: OF PAGES
LOCATION: PNRI Compound, Commonwealth Avenue, Diliman, Quezon City
SENIOR SCIENCE RESEARCH SPECIALIST SENIOR SCIENCE RESEARCH SPECIALIST ENGINEER II ESS HEAD END-USER/ ITS HEAD NSD CHIEF OIC, DEPUTY DIRECTOR DIRECTOR
PROJECT NUMBER: 17 19 OF
1 1' 1" 2 3 4 5 6 6' 7 8 9 10 10' 11 12 13 13' 14
65500
8500
500 1400 2350 4250 6000 4600 6000 2400 2400 5500 5000 7100 2400 2600 6850 6150 1500 1100
1250 1200
10% SLOPE
RAMP DOWN
A"
2450
2450
A
1900
6050
TO WATER
A' METER
4750
BUILDING WATER
2800
SYSTEM
B WC
TOILET
3000
LAV
4350
2800
GRADE D GOWNING
25450
25450
SLAB LINE
SINK
D'
700
CYCLOTRON LINE
D
23000
UP
3200
PERSONNEL
CONSTRUCTION JOINT
MONITORING
& WASHING
SINK
E SLAB LINE
2000
UR
1000
TOILET
(Male) GOWNING
CYCLOTRON LINE
RAMP
9.0% SLOPE ROOM
12500
LANDING
ELEV. +0400
WC LAV
850
UP TOILET
(Female)
F UP SLAB LINE
UP
Mid-Landing
UP to Mezzanine
G SLAB LINE
1300
1250 2400
3650 2225
9000
8250 6250 10550 5325 18000
4600 6000 2350 2400 5500 5000 12100 6850 6150
65500
150
WP WASTE PIPE RWP
WASTE PIPE
200mm thk. REINFORCED CONCRETE WALL (Phase 1)
200
SVTR SOIL VENT
WL WATER LINE
THRU ROOF
PROJECT TITLE: REVIEWED BY: CONCURRED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENTS: DESIGNED BY: SHEET NO.
N.C.S.
Department of Science and Technology
Philippine Nuclear Research Institute GROUND FLOOR DESIGN DEV'T: E.A.D.R.
E. A. RAMIREZ CONSTRUCTION, INC. Innovating Nuclear Medicine Research and Services: WATER LINE LAYOUT
P-4
DRAWING PRODUCTION: E.A.D.R.
DESIGNER DEVELOPER BUILDER Ed Angelo D. Ramirez Development of Emerging PET Radiopharmaceuticals
PROJECT MANAGER for Early Cancer Staging and Assessment of Biological ACAD BY: M.M.J.D.G.
Location : EARCON Bldg., 31 Commonwealth Ave. Ext., Brgy. Sta. Monica, Quezon City 1117
Tels. +63 9259169 Telefax. +63 2779125 Functions in Cancer Cells (C.Y. 2021) (Phase 2) PAGE NO. OF TOTAL NO.
Engr. Rosalino B. Rejas Engr. Arturo F. Salih Engr. Andrew C. Barrida Engr. Renato T. Bañaga Adelina DM. Bulos Preciosa Corazon B. Pabroa, Ph. D. Vallerie Ann I. Samson, Ph. D. Carlo A. Arcilla, Ph. D. CHECKED BY: OF PAGES
LOCATION: PNRI Compound, Commonwealth Avenue, Diliman, Quezon City
SENIOR SCIENCE RESEARCH SPECIALIST SENIOR SCIENCE RESEARCH SPECIALIST ENGINEER II ESS HEAD END-USER/ ITS HEAD NSD CHIEF OIC, DEPUTY DIRECTOR DIRECTOR
PROJECT NUMBER: 18 19 OF
1 1' 1" 2 3 4 5 6 6' 7 8 9 10 10' 11 12 13 13' 14
65500
8500
500 1400 2350 4250 6000 4600 6000 2400 2400 5500 5000 7100 2400 2600 6850 6150 1500 1100
X DS DS DS DS DS DS DS DS DS DS
1250 1200
A"
2450
2450
GV
SINK
WC LAV JANITORIAL
DS DS
6050
HOT
TOILET 3
A'
4750
GV GV WC LAV
WC LAV LAV GV
2800
CONSULTANT'S
WC TOILET
HOT LAB 1
TOILET (F) HOT
UR TOILET 2
B UR
TOILET (M)
WC LAV
GV
SINK GV
HOT
3000
WC LAV TOILET 1
GV
WC LAV
GV
C UP
4350
2800
25450
25450
D'
700
CYCLOTRON LINE
D
23000
DOWN
3200
CONSTRUCTION JOINT
E
2000
CYCLOTRON LINE
12500
SINK
850
E' TOILET WC
PANTRY
EXPERT'S ROOM
WC LAV
GV LAV
F WC LAV GV
GV
UR GV
LAV DOWN
FACILITY MANAGER'S
OFFICE
WC
1300
1250 2400
3650 2225
9000
8250 6250 10550 5325 18000
4600 6000 2350 2400 5500 5000 12100 6850 6150
65500
150
WP WASTE PIPE RWP
WASTE PIPE
200mm thk. REINFORCED CONCRETE WALL (Phase 1)
200
SVTR SOIL VENT
WL WATER LINE
THRU ROOF
PROJECT TITLE: REVIEWED BY: CONCURRED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENTS: DESIGNED BY: SHEET NO.
N.C.S.
Department of Science and Technology
Philippine Nuclear Research Institute SECOND FLOOR DESIGN DEV'T: E.A.D.R.
E. A. RAMIREZ CONSTRUCTION, INC. Innovating Nuclear Medicine Research and Services: WATER LINE LAYOUT
P-5
DRAWING PRODUCTION: E.A.D.R.
DESIGNER DEVELOPER BUILDER Ed Angelo D. Ramirez Development of Emerging PET Radiopharmaceuticals
PROJECT MANAGER for Early Cancer Staging and Assessment of Biological ACAD BY: M.M.J.D.G.
Location : EARCON Bldg., 31 Commonwealth Ave. Ext., Brgy. Sta. Monica, Quezon City 1117
Tels. +63 9259169 Telefax. +63 2779125 Functions in Cancer Cells (C.Y. 2021) (Phase 2) PAGE NO. OF TOTAL NO.
Engr. Rosalino B. Rejas Engr. Arturo F. Salih Engr. Andrew C. Barrida Engr. Renato T. Bañaga Adelina DM. Bulos Preciosa Corazon B. Pabroa, Ph. D. Vallerie Ann I. Samson, Ph. D. Carlo A. Arcilla, Ph. D. CHECKED BY: OF PAGES
LOCATION: PNRI Compound, Commonwealth Avenue, Diliman, Quezon City
SENIOR SCIENCE RESEARCH SPECIALIST SENIOR SCIENCE RESEARCH SPECIALIST ENGINEER II ESS HEAD END-USER/ ITS HEAD NSD CHIEF OIC, DEPUTY DIRECTOR DIRECTOR
PROJECT NUMBER: 19 19 OF