Professional Documents
Culture Documents
TITLE DESCRIPTION
PROJECT/JOB NO. GUDANG JK
PROJECT/JOB NAME GUDANG JK
CLIENT NAME PT. DJATI PERKASA GLOBAL INDUSTRI
SITE NAME PASURUAN
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME GUDANG JK
LOAD COMBINATION GROUP
1. GENERAL
1.1 CODE & STANDARD
1.2 MATERIALS & UNIT WEIGHT
1.3 SUBSOIL CONDITION & SAFETY FACTORS
1.4 LOAD COMBINATION
2. DRAWING
2.1 LOCATION PLAN & DETAIL SKETCH
3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
3.2 PIER DATA
3.3 LOAD CASE
3.4 LOAD COMBINATION
4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION
5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
5.2 REQUIRED REINFORCEMENT
5.3 ONE WAY SHEAR FORCE
5.4 TWO WAY SHEAR FORCE
5.5 PILE PUNCHING SHEAR FORCE
1. GENERAL
1.1 CODE & STANDARD
Items Description
Design Code American Concrete Institute (ACI 318) [Metric]
Horizontal Force for Wind AMERICAN SOCIETY OF CIVIL ENGINEERS [ASCE 7-05]
Horizontal Force for Seismic AMERICAN SOCIETY CIVIL ENGINEERS [ASCE 7-05]
Unit System Input : MKS, Output : MKS, Calculation Unit : IMPERIAL
- Pile Capacity
Items Value
Pile Name STRAUSS 30CM
Footing List F1, F4, F7, F10, F13, F16, F19, F22, F25, F28, F31, F34, F37, F3,
Diameter 300 mm
Length 6m
Thick 300 mm
Shape Circle
Capacity ( Ha , Ua , Va ) 2 , 10 , 27.5 tonf
23000
23000
13 37
F37 38
F38 39
F39
6000
12 34 35 36
F34 F35 F36
6000
11 31 32 33 NOTES
F31 F32 F33
10 28 29 30
F28 F29 F30
6000
09 25 26 27
F25 F26 F27
6000
08 22 23 24
F22 F23 F24
6000
07 19 20 21
F19 F20 F21
6000
GUDANG JK PROJECT
06 16 17 18
F16 F17 F18
6000
05 13 14 15
F13 F14 F15
6000
GUDANG JK
03 7F7 8F8 9F9
SQUAD CHECK
6000
AS SHOWN GUDANG JK
2.2 DETAIL SKETCH
OUTPUT UNIT : mm
REFERENCE DWGS
NO. DWG NO. DWG TITLE
800 CL FOOTING
400 TOP BOTTOM
TYP.
50
400
D16@150
D16@150
400x2
800
NOTES
* PILE
1-¥õ300 STRAUSS 30CM
* OUTPUT UNIT : mm
400x2 D16@150
D16@150
GUDANG JK PROJECT
400
50 50
D10
D16
400
50
D10 F1 ~ F37
500
SQUAD CHECK
12-D16
PEDESTAL
50
OUTPUT UNIT : mm
REFERENCE DWGS
NO. DWG NO. DWG TITLE
800 CL FOOTING
400 TOP BOTTOM
TYP.
50
400
D16@150
D16@150
400x2
800
NOTES
* PILE
1-¥õ300 STRAUSS 30CM
* OUTPUT UNIT : mm
400x2 D16@150
D16@150
GUDANG JK PROJECT
400
50 50
25
TYP.
3400
@150
D16
400
D10 F3 ~ F39
SQUAD CHECK
12-D16
75
PEDESTAL
500
50 50
SECTION
SCALE JOB NO. MICROFILM NO.
OUTPUT UNIT : mm
REFERENCE DWGS
NO. DWG NO. DWG TITLE
1500 CL FOOTING
750 TOP BOTTOM
TYP.
50
400
D16@150
D16@150
400x2
800
NOTES
* PILE
375 375 D16@150 2-¥õ300 STRAUSS 30CM
750 D16@150 * OUTPUT UNIT : mm
GUDANG JK PROJECT
400
50 50
25
TYP.
3400
@150
D16
400
D10 F2 ~ F38
SQUAD CHECK
12-D16
75
PEDESTAL
500
50 50
SECTION
SCALE JOB NO. MICROFILM NO.
400
500
The Origin coordinate
The Center of Gravity & Pile (0,0) mm
Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
3 3
F1 All Direct 0.320 m 0.000 m 0.154 tonf
( mm ) Ft. Name F4
Ft. Type ISO
2
800 Area 0.640 m
Ft. Thickness 500.00 mm
3
Ft. Volume 0.320 m
Ft. Weight 0.768 tonf
Soil Height 0.00 mm
400 400
3
Soil Volume 0.000 m
Soil Weight 0.000 tonf
800
400
500
Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
3 3
F19 All Direct 0.320 m 0.000 m 0.154 tonf
400
500
The Origin coordinate
The Center of Gravity & Pile (0,0) mm
Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
3 3
F34 All Direct 0.320 m 0.000 m 0.154 tonf
( mm ) Ft. Name F3
Ft. Type ISO
2
800 Area 0.640 m
Ft. Thickness 500.00 mm
3
Ft. Volume 0.320 m
Ft. Weight 0.768 tonf
Soil Height 0.00 mm
400 400
3
Soil Volume 0.000 m
Soil Weight 0.000 tonf
800
3400
Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
3 3
F3 All Direct 0.320 m 0.000 m 1.306 tonf
3400
The Origin coordinate
500
The Center of Gravity & Pile (0,0) mm
Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
3 3
F6 All Direct 0.320 m 0.000 m 1.306 tonf
3400
Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
3 3
F36 All Direct 0.320 m 0.000 m 1.306 tonf
3400
The Origin coordinate
500
The Center of Gravity & Pile (0,0) mm
Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
3 3
F39 All Direct 0.320 m 0.000 m 1.306 tonf
( mm ) Ft. Name F2
Ft. Type ISO
2
Area 1.200 m
Ft. Thickness 500.00 mm
3
Ft. Volume 0.600 m
1500
Ft. Weight 1.440 tonf
Soil Height 0.00 mm
3
Soil Volume 0.000 m
400 400
Soil Weight 0.000 tonf
800
( mm ) Ft. Name F5
Ft. Type ISO
2
Area 1.200 m
Ft. Thickness 500.00 mm
3
Ft. Volume 0.600 m
1500
Ft. Weight 1.440 tonf
Soil Height 0.00 mm
3
Soil Volume 0.000 m
400 400
Soil Weight 0.000 tonf
800
3400
Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
3 3
F5 All Direct 0.600 m 0.000 m 1.306 tonf
3400
The Origin coordinate
500
The Center of Gravity & Pile (0,0) mm
Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
3 3
F20 All Direct 0.600 m 0.000 m 1.306 tonf
3400
Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
3 3
F38 All Direct 0.600 m 0.000 m 1.306 tonf
3.4.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
p : PileType
Group 1 - PC1-A
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
Ft.Name L.Comb. SFx SFy SFz SMx SMy C.G. of Loads
F1 p 01 0.753 0.148 -2.539 -0.133 0.678 400.0 , 400.0
F4 p 01 0.851 0.152 -3.007 -0.137 0.766 400.0 , 400.0
F19 p 01 0.909 0.151 -3.069 -0.136 0.818 400.0 , 400.0
F34 p 01 0.851 0.151 -3.007 -0.136 0.766 400.0 , 400.0
F37 p 01 0.753 0.147 -2.539 -0.132 0.678 400.0 , 400.0