You are on page 1of 1

16 15 14 13 12 11 10 9 8 7 6 5 4 3

3 Sheet of 4
L

150 150

150
150 THK C32/40 CONCRETE WITH
CONSTRUCTION DRAWING
1 LAYER OF BRC E13 ALL ROUND
CWMCE PTE LTD
28/03/24
DATE OF ISSUE
TOP OF EXISTING SLEEPER

150
PROPOSED FW PIPES
SHD 6.990 m

6mm THICK OF NEOPRENE ON NOTES :


J
TOP OF EXISTING SLEEPER 1. Levels are based on Singapore Height Datum SHD = 0.000m
PROPOSED FW PIPES SHD 5.097 m

SHD 3.750m SHD 3.750m SHD 3.750m


3D VIEW 2. 75 3. 09 3. 09

2. 57
3.41 3. 22 2. 64 2. 81 2. 85
3. 05
3. 08
2. 71
2. 85 2.61

2. 61
3. 72
2. 73 3. 26
2. 61
2. 81 3. 03 2. 61
3. 83
3. 04 3. 58

2. 63
3. 29 3. 24 3. 26 3. 04
2. 83 3. 39 3. 00
3. 27 2. 77 3. 04
2. 93
2. 90 3. 16
EB EB 3. 32 3. 11
3. 72
2. 99 3. 44 2. 85 3. 39

4. 00
3. 34 3. 15 3. 94

2. 91
3. 11 3. 52 3. 39

2. 65
3.09 3. 03

2. 76
2. 96 3. 25 3. 18 3.17 3. 07 4. 03 3. 90
3. 02 3. 19 3. 44 3. 27 3. 85 3. 41
3. 14
3. 01 3. 18
3. 32 3. 34 3. 42
3. 07 3.39 3.34 3. 30 3. 24 3. 90 3. 21

2. 89
3. 13 3. 15 3. 44 3.16 3. 81
3. 08 3. 84 3. 51 3. 46 3.43 3. 39 3. 39 3. 99
4. 03
3. 90 3. 91 3. 93 3. 32 3. 78
TP 3. 81

3. 06
3. 32 3. 44 3. 98

2. 99
3. 99
3. 29 3.45 3. 46
3. 96 3. 47 3. 42
3. 50 3. 98
3. 41
3. 37 3. 53 3. 49 4. 01
3. 51 3. 90 3. 49 3. 69 3. 53 3. 52
3. 49 3. 45 3. 80
3. 80 3. 88
3. 59 3. 44

2. 94
3. 45

4. 00
3. 66 3. 55 3. 37 3. 61 3. 64 3. 60 3. 56 3. 55
3. 45 3. 60 3. 62 3. 38 3. 90
3. 30 3. 26 3. 29 3. 41 3. 99

14. 00sof

2. 94
3. 20 3. 45 3. 40 3. 35 3. 64 3. 60 3. 88
3. 27
3. 30
3. 36
3. 39
3. 24
3.39
3. 37
3.36 3. 48 3. 31 3. 32 3. 30 3. 32
3. 54
3. 65 3.58
3. 60 CJ 3. 92
3. 31 3. 19 3. 82 3. 27 3. 33 3. 40 4. 01

4. 11

3. 02
3. 17 3. 99

14. 01sof
3. 82 3. 35

13.97sof
4. 08 4. 08 3. 90

3. 15
3. 57 4. 07 4. 07

2. 87

4. 09
3. 43

4. 11
14. 00sof
3. 22 3. 30 3.77
CJ 3. 85 3. 98

13. 96sof
3. 72 3. 68
3. 31 3. 81
3. 87

3. 20
3. 73 3. 73

4. 11
3.67
0. 608i nv
CJ 3. 64 4. 00

GV
3. 97

3. 00
3. 66 3. 98
3. 67 3.69 3.67

3. 11

2. 95
3. 76 3. 85
3. 79 3.78
3. 70 3. 85

7. 69sof

MH (PUB)
3. 91 3.71

7. 72sof

3. 65
GV 3.30

3.58

3.51
3.60

3.45
3.52

3.64
GUARD

3. 63
3.56
3.42
HOUSE
3.52

3.44

50in v
2. 8
3.62
X-2 50
3.34

3.73
PW
DO TANK PAC KA GE
FH- 1

3.67
TK-100

3.74
3.31
3.42

DUAL MEDIA FILTERS

3.61
WATER TANK 3.50

FH- 2 DIA.=14000

3.71
PN 119.855 3.77

6.0m WIDE ROAD


3.68

3.72
3.75
4.07

3.69

PE 133.693
3.73
58in v
3. 7 3. 2
48in v
3.65
3.82

5.0m WIDE ROAD


3.72

3.81
ELEVAION AT GRIDS P17 ELEVAION AT GRIDS P1 TO P16 PIPE ENCASEMENT DETAILS

RO (JEWEL) PLANT
3.81
3.71 3.68

TK-205 PN 108.855

3.58
3.86 3.65
3.97 3.82

3.84
WATER TANK

PUMP HOUSE
3.77

3.64
3.76

FIRE WATER
DIA. = 21500

3.74
3.81
TOOL
3.73 3.54

STORE BH2
DN

i v
31 n
3. 7
3.86

SHED OVER CHEMICAL DOSIN G AREA


I

3.67

3.74
3.70
3.57

Scale 1 : 100 Scale 1 : 100 Scale 1 : 20


3.72 3.55
3.47
2. 2
67in v

MAINTE NANCE
WORKSHOP

HR
HG I W PL A N T 3.66

P-220/225/230/235
TK-200
3.67

PN 84.355
3.66

3.74

BOUNDARY FENCE
3.72

EXIT
3.67 3.65

3.67
EXI T
3.72
A3 WATER TANK
3
3.65

5.0m WIDE ROAD


3.47

DIA. = 21500 3.53

E FE 3.57

PE 242.961
3.62

3.76

20in v
A2 MC C &

DN

3. 3
3.71
TRANSFORMERS

EXIT

3.62
C ONTROL ROOM YARD
3.58

3.59
EXI T
3.46

3.57

3.50
1 2 3 4 5 6 7 A1

3.72

3.59
A 3.46

3.82
3.58

FH- 8 FH- 7 TA P

3.34

3.37
3. 71
EXTG 3.64 3.61 3.65

SOI L

3.43
PN 6 6. 60 5
SUMP
B 3.45
3.51
3.58
3.62 3.57

12
0. 9
41 n
i v 2.4
5
i4n
v 2. 66in v 2. 5
73in v 61 n
2. 2 i v
3.48

3.1 8
3.76 3.74 3.75 FH -1 1 3.23
3.26 3.36 3.46 3.53

3.56
3.58 3.60

3.79 3.78 3.63


3.56

3. 73
3.81 3.60 3.63

3.86
1 2 3 4 5 6 7 8 11 12 13 14 15 16 17 18 19 20 21 21a 22
3.51

3.75
3.81
3.55 3.69
3.65

FH- 3 F HR B1
3.62

3.62
3.59

3.91
3.62

9 10

3.90
PN 52.410

GUARD

1.8mW PIPE SLEEPER


HOUSE-1
B2

3.94

3.74
STAC K SUB STATION NO.1

7.0m WIDE ROAD


HAZEL PLANT

7.0m WIDE ROAD


B3

EXI T
23 24

WEIGH BRIDGE
4
E FE

THIS DRAWING
EX I T E EX I T

EXI T
V-685/680 1
BH1 FE E EX I T AC
FE FH -1 0
HR

EXI T
FE EX I T FE

SUBSTATION
22KV/LV

7.0m WIDE ROAD


FH- 9

WASHING
7.0m WIDE ROAD B AY

FH- 5 FH- 6
FH- 4

H
PB PB
2313 2314 11 P17 P15 P14 P13 P12 P11 P10 P9 P8 P7 P6 P5

PROPOSED FW PIPES

SHD 3.750m
4 28/03/24 SSH KKY KKY PIPE ENCASEMENT DETAILS AMENDED.
G 3 11/03/24 SSH KKY KKY AMENDMENT TO APPD SCDF BP01 SUBM.
2 06/02/24 SSH KKY KKY ISSUED FOR BCA(BP01) COMPLIANCE.
1 26/01/24 SSH KKY KKY ISSUED FOR BCA(BP01) SUBMISSION.
0 15/01/24 MAY KKY KKY ISSUED FOR CONSTRUCTION.

DEVELOPED ELEVATION OF PIPE SUPPORTS H


G
14/11/23
26/09/23
SSH
SSH
KKY
KKY
KKY
KKY
NEA(BP) & SCDF(BP) SUBMISSION.
ISSUED FOR URA COMPLIANCE,
Scale 1 : 200 F 25/08/23 SSH KKY KKY URA PLANNING SUBMISSION.
E 03/08/23 SSH KKY KKY COMPLIED WITH JTC COMMENTS.
D 03/07/23 SSH KKY KKY COMPLIED WITH JTC COMMENTS.
C 22/05/23 SSH KKY KKY COMPLIED WITH CBPD DC COMMENTS.
B 17/05/23 SSH KKY KKY JTC PLAN CONSENT ; NEA; PUB & NPARKS DC.
A 12/05/23 SSH KKY KKY ISSUED FOR CLIENT'S APPROVAL

F PB PB REV. DATE DRAWN


DESIGN /
CHECKED
APPROVED DESCRIPTION

PB PB PB 2318
PB 2317 GENERAL NOTES REFER TO DWG NO:
2314 2315 2316
2313

3.60

3.64

PROPOSED 16" FW PIPES & VALVE TO BE


E PROTECTED WITH 30mm THK PYGOGEL XTF & FINISH 3.42

WITH 0.4mm THK SUS CLADDING (1 HR FIRE RATING) P4 P3 P2 P1


3.52
PROPOSED BURIED FW PIPE TO BE PROTECTED WITH 3.44

150 THK CONCRETE BEDDING & HAUNCHING


QUALIFIED PERSON'S ENDORSEMENT:
X-250 P5 A B C D S
I ON
AL E
N G
PW S

FE

IN
DO TANK P17 3

P RO

EE
PROPOSED PIPE SUPPORT (TYP) PACKAGE CIVIL

R
FH-1 PROPOSED FW PIPES

P15 P14 TK-100 CHAN WAI MUN


D
WATER TANK APPROVED S
1436
I N E
P6 FIREWATER 2 G A POR
P13 DIA.=14000 APPROVED PUMP HOUSE

PN 119.855
DRIVEWAY
3.77 ENGINEERS: CWMCE Pte Ltd
EXTENSION
P12 Consulting Civil & Structural Engineers
BLK 164 BUKIT MERAH CENTRAL #03-3623 SINGAPORE 150164
3.72

3.75 TEL: 62737227 EMAIL: cwmce@singnet.com.sg


4.07
1
PE 133.693

MAIN CONTRACTORS:
P16 3.578inv

3.82
3.428inv

3.65
5.0m WIDE ROAD

APPROVED
DIESEL AGITECH INNOVATIONS PTE LTD
C P11 TANKS SHED 3, Soon Lee Street, #06-14, Pioneer Junction Singapore 627606

P10 P7 OWNER:
Sembcorp Industries Ltd
3.71 3.68
sembcorp 51, SAKRA AVENUE, JURONG ISLAND
TK-205 PN 108.855 SINGAPORE 627894
P8 LAND OWNER:
3.97
3.86
3.82
JTC CORPORATION
THE JTC SUMMIT, 8 JURONG TOWN HALL ROAD, SINGAPORE 609434

WATER TANK 3.77


PUMP HOUSE

3.76 PROJECT/AREA:
FIRE WATER

PROPOSED ADDITIONS AND ALTERATIONS INVOLVING


DIA. = 21500 P9
3.74

B TWO 2.5kL DIESEL TANKS AND A FIREWATER PUMP

CWMCE PROJECT REFERENCE : 01246


HOUSE TO THE EXISTING SUT SERAYA PLANT ON LOT
01736A MK 34 AT 51 JURONG ISLAND HIGHWAY
BH2 [WESTERN ISLANDS PLANNING AREA].
3.371inv

DRAWING TITLE:

PIPE SUPPORTS LAYOUT & ELEVATIONS


N

SCALE DRAWING NO. SHEET REVISION


As
16 15 14 13 12 11 10 9 8 7 6 5 4 3 indicated
SUT2-SY2-A12-1-013 1 OF 1 4