No.

Submission Checksheet (MSA) Status Comments

1 Relevant page(s) of contract Specification, BoQ and Drawing NA

2 Specification compliance statement, endorsed by vendor/supplier NA

3 Company profile, valid trade license(s), list of relevant past projects

4 Catalogue (subject product to be clearly highlighted)

5 Valid ISO certificate NA

6 Valid product certificate issued by relevant authorities (e.g. SPAN…etc) NA

7 Product testing/documents NA

8 Material datasheet NA

9 Safety datasheet NA

10 Technical datasheet NA

11 Product specification

12 Product drawings NA

13 List of spare parts (if applicable)

14 Applicator’s method statement (where applicable)

15 Sample(s) provided? (as applicable) NA

16 Other enclosure (if any) NA

Checked by : Reviewed by :

Nur Nadia Zakaria Syerifaizal Hj. Mustapha


QAQC Engineer QAQC Manager
RASAU INTAKE AND PUMP STATION
INTAKE PLANT
PENGURUSAN AIR SELANGOR
SDN BHD
MATERIAL SUBMISSION FOR APPROVAL

MATERIAL SUBMISSION FOR

FORMWORK
(EFCO (MALAYSIA) SDN. BHD.)

Reference No : RWTP-GB-CNS-MSA-000167

Revision : 00

Date : 17th April 2024

Action Name Designation Signature

Approved by Khor Thiam Chay Project Director

Approved by Tan Jin Soon Lead Consultant

Joshua Entol Construction


Reviewed by
Manager

Reviewed by Syerifaizal QAQC Manager

Prepared by Mujana Project Engineer

RWTP-GB-C&S-MSA-000167-00
RASAU INTAKE AND PUMP STATION
INTAKE PLANT
PENGURUSAN AIR SELANGOR
SDN BHD
MATERIAL SUBMISSION FOR APPROVAL

CONTENT

Appendix 1 - EFCO Malaysia - Company Profile


Appendix 2 – WALL FORMING SYSTEM
Appendix 3 – HANDSET FORMING SYSTEM
Appendix 4 – GANG FORMING SYSTEM

RWTP-GB-C&S-MSA-000167-00
RASAU INTAKE AND PUMP STATION
INTAKE PLANT
PENGURUSAN AIR SELANGOR
SDN BHD
MATERIAL SUBMISSION FOR APPROVAL

Appendix 1 - EFCO Malaysia - Company Profile

RWTP-GB-C&S-MSA-000167-00
EFCO (MALAYSIA) SDN. BHD.
OFFICE:
Suites B-3A-05 & 06, Level 3A, Block B, Sky Park One City,
Jalan USJ 25/1, 47650 Subang Jaya, Selangor Darul Ehsan, Malaysia T:+603-5022 3328 F:+603-5022 3329

JOHOR BAHRU OFFICE & WAREHOUSE:

PLO 454, Zone 10, Jalan Keluli, Kawasan Perindustrian Pasir Gudang,
Pasir Gudang,81700, Johor Darul Takzim, Malaysia T: +607 256 4366 F: +607-256 5366

EFCO SINGAPORE PTE. LTD.


SINGAPORE OFFICE:
1, Scotts Road #24-10 Shaw Centre, 228208 Singapore
Who We Are
More than just a slogan
Providing our customers the
“best value and lowest in-place concrete costs”
has been a way of life at EFCO since 1934.

“It’s not just the cost of the form, but the cost of the
form plus the cost of using that equal the true cost
of concrete.” W.A. Jennings, EFCO’s Founder
EFCO Core Values:
• Q-uality
– Solutions, Product, Drawings, Field Service

• I -ntegrity
– We will not compromise our values in dealings with
our customers, employees, stockholders.

• I -nnovation
– Our innovative systems build everyday solutions.

• S-uper Service
– Engineering, Distribution and Field Service
Quality begins
with a well
thought out,
accurate quote
letter offering
the right
solution.

Quality Erection Drawings and


Field Service.
Quality in Product
Design and Manufacturing
We will not compromise our values in dealings
with our customers, employees, stockholders.
HP 2400

ADJUST-A-TRUSS

PLATE GIRDER
HAND-E-FORM
EFCO-CUNNINGHAM

E-Z DECK
EFCO LITE
SS JUMP SYSYEM
Result:
Innovative
systems build
everyday
REDI-RADIUS
solutions.
SUPER STUD SPECIAL
Engineering

Field Service
Equipment Availability
Field Supervisors

EFCO’s team of trained Field


Supervisors is available to
speed up your crew’s learning
curve by providing direction
through the initial assembly
and cycling of EFCO forms.
Engineering EFCO engineering will
provide AutoCAD generated
erection drawings and
step-by-step procedures.
WHERE ARE WE…
EFCO has District and Sales Offices located throughout North
America and around the world.

• Home Office
& Manufacturing
Des Moines, Iowa
Europe
• North America District Offices
District Offices Wellingborough, England
Seattle, Washington Bakewell, England
Fresno, California
Los Angeles, California
Salt Lake City, Utah
Dallas, Texas
Africa
Chicago, Illinois Asia
District Offices
Columbus, Ohio District Offices
Ghana
Nashville, Tennessee Manila, Philippines
Atlanta, Georgia Cebu, Philippines
Orlando, Florida Davao, Phillippines
Pittsburgh, Pennsylvania South America Kuala Lumpur, Malaysia
Washington D.C. District Offices Johor, Malaysia
Marlboro, New Jersey Caracas, Venezuela Singapore
New England Santiago, Chile Bangkok, Thailand
Georgetown, Ontario, Canada Buenos Aires, Argentina Ho Chi Min City, Vietnam
Calgary, Alberta, Canada Lima, Peru
Portland, Oregon Indaiatuba, Brazil
Mexico City, Mexico
EFCO has three manufacturing facilities with the capacity to
support all of your project needs.

EFCO Manufacturing Facilities


Des Moines, Iowa, USA
Georgetown, Ontario, Canada
Valencia, Venezuela
EFCO (M) SDN. BHD.

BUILDING YOUR FUTURE WITH EFCO….


EFCO (Malaysia) Sdn Bhd
• Established since year 1997 in Kuala Lumpur, Malaysia.
• Wholly owned by EFCO Corporation, USA.
• As at today, EFCO Malaysia has more than 60 staffs with two (2)
operations in Selangor and Johor Bahru
• This team, led by professional District Manager, run by Territory
Managers, is backed by an engineering group that is second to none in
the forming industry.
• Also included in the EFCO team are Field Supervisors who are
dedicated to the instruction and training of contractors' crews in the
most efficient assembly and cycling procedures.
• This helps to ensure that the Best Value & Lowest In-Place Concrete
Costs are achieved.
EFCO (M) Sdn Bhd
EFCO Lowest In Place Concrete Cost Solutions:

Vertical Solution: Horizontal Solution


• EFCO Hand E Form • EFCO Hand E Shore
• EFCO E Lite Column • EFCO Pro 4
• EFCO E lite Wall • EFCO EZ Deck
• EFCO Super Stud
• EFCO E Beam
• EFCO Plate Girder
EFCO (M) SDN. BHD.
PROJECT LISTING
LOCAL & OVERSEAS
Austin Height
Johor Bharu, Johor, Malaysia
HOME BUILDING System

5 Blocks Apartments
Selangor, Malaysia
HOME BUILDING System

KLIA A380 Gear Pitt


KLIS Sepang
HEF WALL System
INTI International University
Subang Jaya, Selangor
Pro4 Table Form System

Star Residence
Kuala Lumpur
HOME BUILDING System

Ramunia Office
Pasir Gudang, JB, Malaysia
Pro 4 Table Form System
4G10 &11 Putra Jaya
Putra Jaya, Malaysia
E lite Column System

MARDI Agriculture Exhibition Hall


Serdang Selangor
E lite Column System

Puchong Retaining Wall


Puchong, Selangor
E- Lite Wall System
New Hamsphere Condo
Kuala Lumpur, Malaysia
HAND-E-FORM System

Printing Plant
Rawang, Selangor
E lite Wall System

4 blocks 5 storey Apartment


Selanyang, Selangor
HAND-E-FORM & PRO-4 System
5000 Units Low Cost House
Thailand
HAND-E-FORM System

4000 Units House


Angola
HOME BUILDING System

14 blocks 5 storey Apartment


FT Labuan, Malaysia
HOME BUILDING System
DOHA Highway
DOHA
Hand E Form with Super Stud System

Terengganu Stadium
Terengganu, Malaysia
MPG System

2 Blocks 16 Storey
Selangor, Malaysia
HOME BUILDING System
Army Camp Wall
Selangor , Malaysia
HAND-E-FORM; HAND-E-SHORE System

PJ Trade Centre ( 4 blocks 25 storey)


Selangor, Malaysia
HAND-E-FORM, Life Core & PRO-4 System

CFS Computer Centre.


Cyber Jaya, Malaysia
EZ Deck System
Bukit Jalil National Stadium Retaining
Wall
Kuala Lumpur, Malaysia.
HAND-E-FORM System

F&N Factory
Shah Alam, Malaysia.
HAND-E-SHORE & HEF System

Pile Cape for Bus Terminal


Selangor, Malaysia
HAND-E-FORM System
... and the list continues
• Low Cost Cluster House, Malacca • Retaining Wall for 135M/R, JB
• Water Tank Forming, Shah Alam • 496 Units Walking Up Flat, Tuaran-Sabah
• Star Residence, Jln Tun Razak • 140 Units Double Storey Link House,
• Bangsar Shopping Complex, Jinjang
Bangsar • Borneo Highland Resort , Kuching-
Sarawak
• UAC Building, Mutiara Damansara
• Unimas New Campus, Kota Samarahan,
• Printing Plant, Sabak Bernam Sarawak
• INTI College, Subang Jaya • 180 Units Bangalow , Aman Perdana
• Putrajaya Convention Centre, • Pylon for Putrajaya Monorail / Bridge ,
Putrajaya Putrajaya
• MS Elevator Lift Tower, Seberang • Monorail Station, Kuala Lumpur
Prai • Bridge Abutment, Kuala Lumpur
• Cyberjaya Underpass, Cyberjaya
• Double Storey Cluster House,
• Sewerage Treatment Plant, Langkawi
Kluang – JB
• Sport Training Centre, Bukit Jalil
• Drainage , Rawang • Pandan Hospital, Johor
• Terengganu Stadium, Terengganu • Sprint Expressway, Kerinchi Interlink
• Box Culvet for Proton City, Ipoh • Complex Prison Cell, Perlis
• Sewage Treatment Plant, JB
... and the list continues
• Ceramic Factory, Pasir • 4 Level Car Park, Sri Hartamas
Gudang – Johor • 176 Unit Semi D House, Moun’t
• Raw Water Intake & Pumping Austin – Johor
Station, Bintulu – Sarawak • A-380 Mas Hanger, Mas Complex
• Sony factory, Shah Alam – KLIA
• Basement Car park , • 528 Unit Police Quarters – Kota
Putrajaya Kinabalu Sabah
• Nestle factory, Rembau – N. • Smart Tunnel – Cheras
Sembilan • Petronas Compress Room –
• PJ Trade Centre, Damansara Segamat
Perdana • Aquawalk Marine Tank – Aquaria
• University Petronas, Tronoh - KLCC
Perak • NPE Bridge 7 & 8, Jln Klang
• Limbang Prison, Limbang – Lama
Sarawak • SACC Exhibition Hall, Shah
• Plus Highway Cross Over Alam
Bridge, Sabak Bernam
... and the list continues
• Rainbow Tower, Dubai – UAE • 1,385 Unit Double Storey House,
Padung Pan – Thailand

• Pearl Saigon - 36 Storey


Apartment, Ho Chi Minh City – • Retaining Wall, Brunei
Vietnam
• 2.4M Height Retaining Wall,
• 2,101 Unit Double Storey Brunei
Houses, Bangkok – Thailand
• Qatar Primary Routes, Dukhan
• Presidential Suite, Lusaka – Highway – Doha, Qatar
Zambia
• Meena Plaza, Dubai – UAE
• 4,500 Unit Single Storey
House, Angola - Africa
VP Asia Region Sales & Service
Werner Wellmanns
Mobile No : (012) 311 7484
E-Mail Address: Werner.Wellmanns@fcoforms.com

Regional Finance Manager – Asia & Europe


Jeannie Loh
Mobile No : (012) 683 4268
E-Mail Address: Jeannie.Loh@efcoforms.com

District Manager (Malaysia, Singapore & Taiwan)


Jack Wan T-Y
Mobile No : (012) 382 7268
E-Mail Address: Jack.Wan@efcoforms.com
Senior Territory Manager (Malaysia) Territory Manager (Malaysia)
Jackie Chan Ben Chen
Mobile No : (012) 336-4268 Mobile No : (012) 690-5268
E-Mail Address: Jackie.Chan@efcoforms.com E-Mail Address: Ben.Chen@efcoforms.com

Territory Manager (Malaysia, Singapore, Taiwan) Territory Manager (Malaysia)


Stephen Koon Alvin Wong
Mobile No: (012) 376-7268 Mobile No : (012) 750-9268
E-Mail Address: Stephen.Koon@efcoforms.com E-Mail Address: Alvin.Wong@efcoforms.com

Territory Manager (Singapore) Territory Manager (Malaysia)


Matthias Ng Wong Jun Fei
Mobile No : (65) 9754 2118 Mobile No : (012) 321-7268
E-Mail Address: Matthias.Ng@efcoforms.com E-Mail Address: JunFei.Wong@efcoforms.com
Warehouse Plant Manager District Engineer
Kevin Khor
Mohd Chairul Reesha
Mobile: (012) 371-5268
Mobile No : (012) 603-5268
E-Mail Address: Kevin.Khor@efcoforms.com
E-Mail Address: Chairul.Reesha@efcoforms.com

Field Supervisor Field Supervisor


Foo Ming Huang
Johnson Chai
Mobile No : (012) 292-7268
Mobile No: (012) 268-7268
E-Mail Address: HuangMing.Foo@efcoforms.com
E-Mail Address: Johnson.Chai@efcoforms.com

Senior District Sales Administrator


Amy Tan
Tel : (+603) 5022 3328
Mobile No : (012) 383-3617
E-Mail Address: Amy.Tan@efcoforms.com
RASAU INTAKE AND PUMP STATION
INTAKE PLANT
PENGURUSAN AIR SELANGOR
SDN BHD
MATERIAL SUBMISSION FOR APPROVAL

Appendix 2 – WALL FORMING SYSTEM

RWTP-GB-C&S-MSA-000100-00
EFC-1234M E-BEAM & SUPER STUD System
English Metric

E-BEAM & SUPER STUD


® ®

WALL FORMING SYSTEM

LIGHTWEIGHT WALL FORMING


E-BEAM & SUPER STUD
 WALL FORMING SYSTEM

The EFCO E-BEAM® & SUPER STUD® wall forming of the corners. Typically, the most time consuming
system is a lower cost alternative to traditional and costly element of forming any structure will
formwork and offers an excellent list of features involve the corners. Any experienced crew can build
that are unmatched in the industry. The system is an inside corner using lumber, however, they are
lightweight for use with smaller cranes, versatile generally not fabricated to be cycled along with the
and very flexible and with up to a 133 kN per tie load main wall forming gang panels. The outside corners
capacity. The system minimizes the amount of ties are a more complicated situation. Ties are located
required when compared to panelized systems of far apart, and it becomes more difficult to secure the
similar weight. formwork within the wall thickness requiring a sturdy
form to span from the nearest tie to the outside
The E-BEAM & SUPER STUD wall forming system uses corner. EFCO has designed both an inside and outside
standard EFCO accessories, and when needed can corner solution that provides strength and eliminates
be used with all other EFCO wall systems such as the risk of costly blow-out situations. Furthermore,
PLATE GIRDER ® and EFCO LITE®. A major advantage of the corner can be cycled with the wall gang.
using the E-BEAM & SUPER STUD system is the strength

 TABLE OF CONTENTS

Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3
Heart of the System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-5
Features, Comparisons & Benefits. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9
Technical Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-15
Applications. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-21
Components & Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22-23

2 | E-BEAM & SUPER STUD | 3


Heart of the System
1 E
 FCO’s Manual Retractable 2 E
 FCO Scaffold Brackets attach 3 A
 n EFCO Rugged Taper Tie at the 4 T
 he EB Endcap Tie Assembly and
ALTERNATE CORNER Stripping Corner provides a fast
inside corner stripping relief for
to the form for quick installation.
Used in conjunction with plywood,
base of the wall and a Top Yoke
are all that are required to tie the
Coil Rod can be used to connect
the E-BEAM® & SUPER STUD®
OPTIONS shaft and core construction. handrails, and toe boards, they form set-up on a 2.4 m tall wall. wall gang to any of EFCO’s steel
provide a safe work scaffold EFCO Lifting Eyes bolt directly faced forms.
EB Endcap & Combination around outside corners for easy onto the form and allow cycling
Bias Corners (CBC) easily access to form hardware and for of equipment by crane.
form inside corners and pouring operations. Wood or pipe
pilasters. These standard handrails can be used.
forms eliminate job built
fillers and or take-up panels
in the middle of walls.
2

Outside corners are secured 1


with the EB Outside Corner
Tie Plate connecting two 3 5 B
 ottom Yokes tie opposing
E-BEAM & SUPER STUD panels and allow for the securing
wall gangs. of bulkheads and soffits.

4
EB Endcap in combination
with contractor supplied
2 x 4 and plywood provides
a second solution for
inside corners.

The EB Endcap is an ideal


solution for assembling
large gangs together forming
a perfectly aligned joint. 6 E
 B Ledger Beam connected to
a SUPER STUD at the bottom
of a wall gang helps to support
contractor supplied plywood
without the need of additional
wood fillers.

8 5
6

EFCO E-BEAMS® used


in conjunction with EFCO 8 T
 he EFCO Telescoping Push-pull 7 S
 UPER STUD® Tie Bearings distribute the
SUPER STUDS® and contractor Pipe Brace allows easy alignment load to the SUPER STUDS with a bolted
and plumbing of the form set-up. connection, thus eliminating handling during EFCO Quick Bolt, with its unmatched
supplied plywood produce a
The EFCO Pipe Brace Shoe is the tie installation and removal. EFCO fastener tensile and shear strength,
lightweight wall forming system.
used to securely hold the set-up Rugged Taper Ties feature self-cleaning, allows the pick and movement of large
down and is designed to give rounded edge, quick release threads that panels without any sagging joints.
easy access to the anchoring bolt. resist damage and minimize maintenance
between uses.
4 | E-BEAM & SUPER STUD | 5
 FEATURES, COMPARISONS & BENEFITS

SUPER STUD CORNERS


FEATURES COMPARISONS BENEFITS FEATURES COMPARISONS BENEFITS
The SUPER STUD® has bolt holes SUPER STUD’s strength can be The SUPER STUD is lightweight which Inside and outside corner solutions The CBC saves time and labor of using This creates a stronger connection over
on both sides of the outer flanges at compared to a much heavier 200 mm allows larger form picks, smaller can be constructed without the need traditional wood fillers or cumbersome typical wood form solutions allowing
75 mm increments. This makes it easy double channel. The SUPER STUD crane sizes, reduced freight costs and to cantilever plywood. By using EFCO’s plywood and 2 x 4 kickers. for higher rates of concrete placement.
to attach accessories, affix to other design allows for a full strength permits manhandling. SUPER STUDS Combination Bias Corners, EB Endcaps,
EFCO systems, and in some cases can moment-end connection. can be bolted end-to-end to create a EB Endcap Tie Assemblies and EB
be used for fall protection. continuous member of any length. Outside Corner Tie Plates, you can
create a variety of solutions for forming
inside and outside corners.

E-BEAM GANGS
FEATURES COMPARISONS BENEFITS FEATURES COMPARISONS BENEFITS
EFCO’s E-BEAM® is a galvanized steel The A-frame shape makes the E-BEAM The E-BEAM is a construction beam that The versatility of the E-BEAM® and The bolted connection helps keep the High tolerance on SUPER STUDS and
beam with no wood nailing strip, stronger than an aluminum I-Beam. gives you maximum strength, durability SUPER STUD® wall forming system gangs square and rigid during use E-BEAMS provide very straight wall
designed as a structural member to The bolt holes in the bottom of the and versatility at less weight and cost allows for various gang sizes. unlike other systems that use a friction gangs with no shimming required.
support plywood in both wall and deck E-BEAM allow for a positive connection than aluminum beams. The steel design High-capacity lifting eyes equal less fit clamp or nail/screw to hold the Pipe Braces cycle with the forms and
concrete forming applications. between framing members unlike the allows for less fasteners to be used pick points. Double bolting the stiffback to the waler. hang so that the form can be laid
friction fit or nail/screw needed with when attaching plywood directly to the E-BEAMS to SUPER STUDS on the first down. Quick Bolts provide a positive
other systems. E-BEAM with screws or nails. and last E-BEAM keeps the gang square. connection that do not shake loose
over time. EB Ledger Beams provide
a solid base for setting the form and
protecting the edge of the plywood.

6 | E-BEAM & SUPER STUD | 7


 FEATURES, COMPARISONS & BENEFITS

TIE PLACEMENT WORK PLATFORM


FEATURES COMPARISONS BENEFITS FEATURES COMPARISONS BENEFITS
EFCO Rugged Taper Ties can support Unlike other systems, the Rugged This allows for greater tie spacing EFCO Scaffold Brackets combined The E-BEAM can eliminate the need This allows workers to walk around
up to a 133 kN tie load. Tie does not require sleeves. Simply than ganged handset systems of with E-BEAMS® offer the ability to to shore with T-Posts from the work corners without needing to climb
grease the tie prior to placement of similar weight. Flexible tie spacing is cantilever beyond the end of a wall platform to the footing below. The up the formwork.
concrete and the tapered shaft of the an advantage when architectural tie to create work decks that wrap around E-BEAM uses plywood attached flush
tie allows for quick and easy removal spacing and finish is required. outside corners. to its top as the work platform walkway
the next day. rather than other expensive planking
that can create dangerous tripping
hazards when overlapping at joints or
around corners.

CONCRETE ANCHORS PENETRATIONS, BLOCK-OUTS & LINERS


FEATURES COMPARISONS BENEFITS FEATURES COMPARISONS BENEFITS
The end plate of the EFCO SUPER Other systems, including wood require Setting an anchor to the footing provides Plywood faces allow for easy E-BEAMS can be attached to SUPER Flexible system that can be assembled
STUD® is designed to accept an bracing or kickers adequate sheer strength to the bottom attachment of block-outs and liners STUDS in 50 mm increments allowing to accommodate various job site
anchor that can be drilled and set of the wall form keeping it from walking with screws or nails. Holes can easily large penetrations to be designed in requirements.
into the footing. around during the placement of concrete. be cut for penetrations. the gang forms. In most traditional
gang form systems, this would require
a large space between panels and then
create a great deal of labor to attach
wood fill, bracing, and kickers.

8 | E-BEAM & SUPER STUD | 9


 TECHNICAL DATA

Data Strength Comparison

SUPER STUD ®
E-BEAM ®
2 9
BEAM Stiffness E x l (N mm x 10 )
165 mm Laminated Wood 405
165 mm Aluminum 495
E-BEAM 165 mm Galvanized Steel 574
This technical data has been developed to assist safety factors. The users of EFCO SUPER STUDS E-BEAM is constructed of high-strength, durable
200 mm Laminated Wood 695
engineers in the design of your specific SUPER must design SUPER STUD forming and shoring galvanized steel. E-BEAMS are leasable in lengths
STUD applications. Capacities are based on safety assemblies to appropriate safety factors and control of 300 mm increments, up to 7.2 m in length, but
factors commonly used by the forming and shoring all field conditions to ensure that SUPER STUDS can be made up to 15 m as a sale item.
industry. Compression members are rated using 3:1 are not overloaded. Deflection Properties
E-BEAMS are available for purchase or rent from
Engineering Properties SUPER STUD Available Compressive Strength the EFCO warehouse nearest you.
(Safety Factor, Ω = 3.0; Load Factor, ɸ = 0.50; Effective Length Factor, K = 1.0)
Deflection

230 mm
Engineering Data
75 mm 75 mm
PROPERTIES EFCO E-BEAM
y Metal Steel 6.10

EFCO E-BEAM 165 mm


5.95

Laminated Wood
Galvanized Steel
Laminated Wood
Height 165 mm

Aluminum
165 mm
ASD - Allowable Compressive Strength, Pn /Ω (kN)

165 mm
x

200 mm
Weight (kg/m)
230 mm

Base Width 127 mm


Ø105 mm

5.65

Deflection
LRFD - Design Compressive Strength, ɸ Pn (kN)
x Top Width 50 mm 5.60
13 mm
Nominal Weight 5.6 kg/m

EFCO E-BEAM 165 mm

Laminated Wood
Laminated Wood
Dim. to Neutral Axis from base 77.0 mm

Galvanized Steel

Aluminum

200 mm
t = 3.1 mm Typ.

165 mm

165 mm
y
6 4
Ixx (Deflection Calculation) 2.87 x 10 mm
3 3
Sxx (Top, Stress Calculation) 28.7 x 10 mm
31.8 mm
3 3
31.8 mm Sxx (Bottom, Stress Calculation) 28.7 x 10 mm
E 200,000 MPa
Fy 380 MPa
230 mm x 230 mm SUPER STUD

Material fy = 344 MPa


Cross Section Properties for Bending
(Properties Between Ø105 mm Holes) Recommended Pattern for FASTENERS
A = 2696 mm2 Sxx = 188.4 x 103 mm3 lxx = 21.42 x 106 mm4 Attaching Plywood Facing on
rx = 89.1 mm lyy = 10.56 x 106 mm4 ry = 62.5 mm
E-BEAM Wall Forming System PULL OUT
NAILS AND SCREWS SIZE FASTENER
FORCE
NOTE: Not Intended for Y-Axis Bending
1.2 m
E-BEAM Nail (Yellow)
.100" x 1 1/2"
SAFE WORK LOADS (#4 Box, 1,000/box) 160 lb (73 kg)
(2.5 mm x 38 mm)

SINGLE
EFCO ITEM #10890

POUR
Waler/Stiffback Nail (Typ)
Mmax = 38.8 kN · m (x-x Axis) E-BEAM Nail (Yellow Collated)
SUPER STUD Unbraced Length, L (m) .100" x 1 1/2"
Max tie load without tie bearing = 44.5 kN (250/coil 4,000/case) 160 lb (73 kg)
(2.5 mm x 38 mm)
Max tie load with tie bearing = 133.5 kN EFCO ITEM #07890
Beam SUPER STUD Available Tensile Strength
Mmax = 38.8 kN · m (at member or at joint using Centerline of E-BEAM Nail (Green)
four Ø19 x 50 Quick Bolts) Allowable Tensile Strength Design Tensile Strength (#4 Box, 1,000/box) 2352Z, .100 .100 x 1 3/8"

MULTIPLE
Item E-BEAM below 410 lb (186 kg)

POURS
Vmax = 89.0 kN (x-x Axis only) (2.5 mm) Series Gripshank (2.5 mm x 35 mm)

2.4 m
Pn/Ω Ω ɸPn ɸ
EFCO ITEM #12890
SUPER STUD 376 kN 1.67 564 kN 0.90
SUPER STUD End Plate Connection 354 kN 2.00 531 kN 0.75 E-BEAM Nail (Green Collated)
.100 x 1 1/2"
1.2 m x 2.4 m (250/coil 4,000/case) 410 lb (186 kg)
SUPER STUD Swivel Head Screw Jack 110 kN 2.00 165 kN 0.75 (2.5 mm x 38 mm)
Plywood EFCO ITEM #08890

Self-Drilling Screw 1 5/8" (41 mm) (100/bag)


SUPER STUD Intersections and Concentrated Loads SDS PH FL Reamer #3PT Zinc Plated
EFCO ITEM #11890
500 lb (228 kg)
#10-16 x 1 5/8"
(M5 x .08 mm x 41 mm)

FASTENERS PULL
THRU PLYWOOD
CAUTION
Concentrated Loads without SUPER STUD Tie Bearings may crush
DETAIL 1 Base of Wall Self-Drilling Screw 2 1/4" (57 mm)
(100/bag) SDS PH FL #8-18 x 2 1/4"
and fail the SUPER STUD. WALL FORMING TIE BEARING Reamer #3PT Life Coat
500 lb (228 kg)
(M4 x .07 mm x 57 mm)
EFCO ITEM #13890
In wall forming, concentrated loads are created at tie locations. Tie Screw 1 5/8" (41 mm)
Bearings as shown in Detail 1 are required to prevent crushing failure Automatic Feed for 3/4" (19 mm)
of the SUPER STUD. Material Carlson Systems 1 5/8"
500 lb (228 kg)
800-372-6052 1 5/8" (41 mm) Wood to Steel (41 mm)
Wing tippedSelf-Drilling Screw
ITEM #SFW8162

SUPER STUD
AS FORM WALER

10 | E-BEAM & SUPER STUD | 11


 TECHNICAL DATA

Gang Building Procedure


E-BEAM® & SUPER STUD® WALL FORMING
SYSTEM GANG BUILDING PROCEDURE Plywood Deck
Scaffolding
Ø19 mm x 50 mm Quick
Bolt with nut (Typ) to attach
EB ENDCAP E-BEAM to SUPER STUD Nail
(E-BEAM Insert Optional)
Cross measure
To square Pipe Brace (Typ)
Space
according Space
according Plywood
to erection
drawings to erection
drawings

SUPER
STUD TIE
Bearing (Typ)

E-BEAM x “L” E-BEAM x “L”


Ø19 mm x 50 mm EB Ledger Beam
Quick Bolt with nut (Typ) EB Ledger Beam SUPER STUD x “L” (Typ)
SUPER STUD x “L” (Typ)
SUPER STUD x “L” (Typ)
EB Ledger Beam

1. F
ind level ground with ample working 7. C
 ross measure corner to corner to ensure 10. A
 ttach SUPER STUD Lifting Eyes using 13. T
 urn the gang over and install scaffold,
room available. If ground is not level, gang is square. two Ø19 mm x 50 mm Quick Bolts with handrail, midrail and toe board (wood
lay wood timbers down perpendicular to 8. O
nce square, tighten the Quick Bolt nuts at locations shown on drawings. by contractor).
direction of SUPER STUDS, shimming as connection between the SUPER STUDS® 11. Attach plywood sheets to panel. 14. Install Pipe Brace and secure to form
required to provide flat work space. and E-BEAMS® . using #9 wire.
12. A
ccurately locate the tie locations
NOTE: Be sure to support bolted joints in
9. A
 ttach EB ENDCAPS to the edges of the following EFCO erection drawings and
SUPER STUD with timbers.
assembled panel with an EFCO Quick Bolt drill Ø39 mm holes through plywood.
2. S
pread out the EFCO SUPER STUDS to the E-BEAM.
required to build one panel.
3. B
 olt all SUPER STUD to SUPER STUD end Recommended Method of Assembling Multiple SUPER STUDS End-to-End
connections at locations shown on plans
using four Ø19 mm x 50 mm EFCO Quick REQUIRED BOLTING SEQUENCE
SUPER STUD END PLATE
Bolts and nuts. Tighten bolts according to AT SUPER STUD JOINT
bolting sequence detail (page 13).
4. A
 ttach tie bearings to SUPER STUDS Ø19 mm x 50 mm EFCO 1 4
Quick Bolt with nut (four
at locations shown on plans using two per end connection)
Ø19 mm x 50 mm Quick Bolts and nuts.
5. R
oll SUPER STUDS over so that tie
bearings face down. Spread out SUPER
STUDS to dimensions detailed on E-BEAM Insert Angle Optional
erection drawings. An option to the EB ENDCAP is an E-BEAM 1. Set SUPER STUD units on timber blocking clear of dirt.
insert angle. It can be used to join two E-BEAM 2. Ensure mating end plates are clean and free of dirt.
6. P
lace E-BEAMS on SUPER STUDS and & SUPER STUD wall gangs together quick and 3. Fit Ø19 mm x 50 mm EFCO Quick Bolts into each hole at
space at dimensions as shown on EFCO easy with the use of EFCO’s HAND-E-FORM® corners of SUPER STUD end plates and fix nuts finger tight. 3 2
erection drawings. Attach with one clamps. This feature provides a fast and 4. Tighten bolts in the following sequence: 1 and 2 then 3
Ø19 mm x 50 mm Quick Bolt with nut. efficient way to separate a long wall form for and 4 applying a snug-tight fit. Ø19 mm x 50 mm EFCO
Hand tighten only at this time. cycling smaller sections to the next pour. Quick Bolt with nut (four
per end connection)

12 | E-BEAM & SUPER STUD | 13


 TECHNICAL DATA

Spacing Recommendations
Recommended Spacing on a 3.6 m Wall

3.00 m
0.90 m

2.25 m
2.40 m
2.55 m
2.70 m
2.85 m

3.30 m
3.45 m
3.60 m
3.75 m
3.90 m
3.15 m
2.10 m
1.05 m
1.20 m
1.35 m
1.50 m
1.65 m
1.80 m
1.95 m
EFCO E-BEAMS 0.75 m 0.75 m
57 kPa at

52.3

42.8

38.0
66.5
kPa

61.8
71.3

57.0

47.5
Spacing Shown

1.3 V
Plywood 0.90 m 0.90 m

Vertical Tie Spacing (V)


150 mm 1.05 m 1.05 m
1.20 m 1.20 m
EFCO SUPER STUDS
450 1.35 m 1.35 m
1.50 m 1.50 m

V
Note: Top 1.5 m of
450
gang can have longer 1.65 m 1.65 m
2.25 m max distance
E-BEAM spacing due to
from top to first tie 375 reduced pressures
1.80 m 1.80 m
1.95 m 1.95 m
375
3.6 m 2.10 m 2.10 m

V
(example)
300 2.25 m 2.25 m

3.00 m
0.90 m

2.25 m
2.40 m
2.55 m
2.70 m
2.85 m

3.30 m
3.45 m
3.60 m
3.75 m
3.90 m
3.15 m
2.10 m
1.05 m
1.20 m
1.35 m
1.50 m
1.65 m
1.80 m
1.95 m
300

1.8 m CENTERS MAX.


300 From E-BEAM chart at 57
kPa and 1.2 m centers on

V
300 studs, E-BEAMS can be Horizontal Stud Spacing (H)
spread at 300 mm
300
800 mm
300
MAX

V
1.2 m horizontal
stud spacing

0.35 H H 0.35 H
400 mm from end of E-BEAM
to SUPER STUD
Acceptable base by

V
contractor (as required)

Recommended Spacing on a 2.4 m Wall

0.45 V
0.4 H H H 0.4 H

57 kPa at
Spacing Shown

MAXIMUM HORIZONTAL STUD SPACING (H)


Plywood 150 mm 28.5 kPa 33.3 kPa 38.0 kPa 42.8 kPa 47.5 kPa 52.3 kPa 57.0 kPa 61.8 kPa 66.5 kPa 71.3 kPa
200 3.72 3.19 2.79 2.48 2.23 2.03 1.86 1.72 1.59 1.49
EFCO SUPER STUDS

VERTICAL E-BEAM SPACING (mm)


225 3.31 2.84 2.48 2.21 1.98 1.80 1.65 1.53 1.42 1.32
450 250 2.98 2.55 2.23 1.98 1.79 1.62 1.49 1.37 1.28 1.19
275 2.70 2.32 2.03 1.80 1.62 1.46 1.35 1.25 1.16 1.08
450 300 2.48 2.10 1.86 1.65 1.49 1.35 1.24 1.15 1.06 0.99
325 2.29 1.96 1.72 1.53 1.37 1.25 1.15 1.06 0.98 0.92
EFCO E-BEAMS 375
2.4 m 350 2.13 1.82 1.59 1.42 1.28 1.16 1.06 0.98 0.91 -
(example)
375 1.98 1.70 1.49 1.32 1.19 1.08 0.99 0.90 - -
375
400 1.86 1.59 1.40 1.24 1.12 1.01 0.93 - - -
300 450 1.65 1.42 1.24 1.10 0.99 0.90 - - - -
500 1.49 1.28 1.12 0.99 - - - - - -
300
550 1.35 1.16 1.01 0.90 - - - - - -
600 1.24 1.06 0.93 - - - - - - -
Acceptable base by
contractor (as required) Note: E-BEAM tie spacing depends on plywood strength.

14 | E-BEAM & SUPER STUD | 15


 E-BEAM® & SUPER STUD® APPLICATIONS

Applications

16 | E-BEAM & SUPER STUD | 17


 E-BEAM® & SUPER STUD® APPLICATIONS

18 | E-BEAM & SUPER STUD | 19


 E-BEAM® & SUPER STUD® APPLICATIONS

20 | E-BEAM & SUPER STUD | 21


E-BEAM® & SUPER STUD® - ACCESSORIES NOT ALL SIZES ARE LISTED. CONTACT YOUR TERRITORY MANAGER FOR OTHER SIZES.

E-BEAM Bracket and Post


DESCRIPTION WEIGHT (kg) ITEM NO.
SUPER STUD Rugged Taper Ties E-BEAM End Bracket and Post SS-60 11.1 80474
E-BEAM
The EFCO Rugged Taper Tie features self-cleaning, rounded edge, E-BEAM Side Bracket and Post SS-61 10.0 86474
DESCRIPTION WEIGHT (kg) ITEM NO. quick release threads that resist damage and minimize maintenance
DESCRIPTION WEIGHT (kg) ITEM NO.
SUPER STUD x 3600 73.5 01A25
E-BEAM x 3000 17.0 10A24
between uses. The Rugged Taper Tie is available in two sizes, 25 mm
SUPER STUD x 1800 42.6 02A25 with a 133.4 kN capacity working load and 32 mm with a 222.2 kN
E-BEAM x 3300 18.6 11A24
SUPER STUD x 900 25.0 03A25 capacity working load, both with a safety factor of 2:1. EFCO Rugged
E-BEAM x 3600 20.4 12A24
SUPER STUD x 450 16.3 04A25 Taper Ties are available in lengths 760 mm to 2135 mm. EB Endcap
E-BEAM x 3900 22.0 13A24
SUPER STUD Spacer x 150 13.0 40A28 The Rugged Taper Tie Wingnut Assembly is the combination of
E-BEAM x 4200 23.8 14A24 DESCRIPTION WEIGHT (kg) ITEM NO.
both a nut and a washer and can be used on either end of the tie.
When cycling form assemblies, locate the hexagonal end of the tie, EB Endcap x 900 4.2 36A24
strike the wingnut at the striking point with a hammer and remove EB Endcap x 1200 5.6 37A24
the wingnut assembly. Remove the tie from the opposite side of EB Endcap x 1500 7.1 38A24
SUPER STUD Tie Bearing Bottom Yokes the set-up. EB Endcap x 1800 8.4 39A24

DESCRIPTION WEIGHT (kg) ITEM NO. DESCRIPTION WEIGHT (kg) ITEM NO. Ø25 mm Ø32 mm EB Endcap x 2400 11.3 40A24
133.4 kN Capacity 222.4 kN Capacity
SUPER STUD Tie Bearing 5.0 07A26 Bottom Yoke MBY-2 10.4 31A46 2:1 Safety Factor 2:1 Safety Factor
Bottom Yoke MBY-4R 19.3 10A46 LENGTH WEIGHT ITEM NO. WEIGHT ITEM NO.
Bottom Yoke MBY-8R 55.1 16A46
Rugged Taper Tie x 760 3.3 22175 5.0 02175
Bottom Yoke MBY-10R 104.0 18A46
Rugged Taper Tie x 915 4.0 23175 6.1 03175
SUPER STUD Lifting Eye LE-9 Rugged Taper Tie x 1065 4.8 24175 7.3 04175 EB Endcap Tie Assembly
Rugged Taper Tie x 1220 5.5 25175 8.4 05175
DESCRIPTION WEIGHT (kg) ITEM NO. Rugged Taper Tie x 1370 6.3 26175 9.5 06175 DESCRIPTION WEIGHT (kg) ITEM NO.
SUPER STUD Lifting Eye MLE-9 Rugged Taper Tie x 1525 7.1 27175 10.7 07175 EB Endcap Tie Assembly x 1200 7.7 43A24
3.6 03A26
(44 kN Capacity) Hole Saw (Sale Only) Rugged Taper Tie x 1675 7.8 28175 11.8 08175 EB Endcap Tie Assembly x 1500 9.5 44A24
Rugged Taper Tie x 1830 8.6 29175 13.0 09175 EB Endcap Tie Assembly x 2400 15.0 46A24
DESCRIPTION WEIGHT (kg) ITEM NO.
Rugged Taper Tie x 2135 10.1 30175 15.3 10175
21 mm Hole Saw 0.1 20889
Rugged Tie Wingnut 2.7 60175 2.6 70175
27 mm Hole Saw 0.1 21889
Battered Washer 19 mm to 38 mm 1.0 90046
33 mm Hole Saw 0.1 22889
Top Yoke
40 mm Hole Saw 0.1 23889
DESCRIPTION WEIGHT (kg) ITEM NO. EB Coil Rod, Nut and Washer
Top Yoke MTY-2 4.1 07A46
Top Yoke MTY-3 5.1 08A46 DESCRIPTION WEIGHT (kg) ITEM NO.
Top Yoke MTY-4 15.6 01A46 EB Coil Rod 13 mm x 560 mm 0.5 55491
Top Yoke MTY-7 23.4 02A46
Scaffolding Beveled Washer 13 mm (Steel) 0.1 00793
Pipe Braces Coil Nut 13 mm 0.1 80488
Top Yoke MTY-10 31.2 03A46
DESCRIPTION WEIGHT (kg) ITEM NO.
EFCO Pipe Braces offer support and alignment to structures and
Scaffold Bracket Arm MSS-70 10.1 25A47 reinforcing steel in heights. Due to macrometric adjustment and bolt
Scaffold Rail Post SS-72 7.5 82030 graduation, EFCO Pipe Braces have a push/pull action which makes
them useful in many applications.
Bolt EB Outside Corner Tie Plate
DESCRIPTION WEIGHT (kg) ITEM NO.
DESCRIPTION WEIGHT (kg) ITEM NO. DESCRIPTION WEIGHT (kg) ITEM NO.
Heavy Duty Pipe Brace 900 to 1500 13.6 81106
Quick Bolt 19 mm x 38 mm w/ E-Nut
0.3 75180 E-Z Clip EB Outside Corner Tie Plate x 900 5.3 30A24
(100 per Bucket) Heavy Duty Pipe Brace 1500 to 2700 23.0 81107
EB Outside Corner Tie Plate x 1200 7.0 31A24
E-Nut 0.2 76180 DESCRIPTION WEIGHT (kg) ITEM NO. Heavy Duty Pipe Brace 2100 to 3300 27.2 81108
EB Outside Corner Tie Plate x 1500 8.8 32A24
Heavy Duty Pipe Brace 3000 to 4500 36.3 83109
E-Z Clip (45 per Bucket) 0.3 92474 EB Outside Corner Tie Plate x 1800 10.5 33A24
Heavy Duty Pipe Brace 3600 to 6100 47.2 81079
EB Outside Corner Tie Plate x 2400 14.1 34A24

E-BEAM Aligner Plate


DESCRIPTION WEIGHT (kg) ITEM NO.
Pipe Brace Shoe
E-BEAM Aligner Plate 4.7 99474 EB Ledger Beam
DESCRIPTION WEIGHT (kg) ITEM NO.
DESCRIPTION WEIGHT (kg) ITEM NO.
Pipe Brace Shoe PBS-1 2.7 80080
EB Ledger Beam x 1800 8.9 70A24
Pipe Brace Shoe PBS-2 1.5 82105
EB Ledger Beam x 2400 11.6 72A24
EB Ledger Beam x 3000 14.5 71A24
EB Ledger Beam x 3600 17.2 73A24

22 23
 Hands-On Learning
EFCO’s Concrete Construction and Forming Institute is a great
learning experience for you and your team. The Institute
features a full-scale demonstration bay for hands-on learning
opportunities, state-of-the-art classrooms, conference rooms,
and a 100-seat auditorium for presentations or videos. Explore
“Formation Hall,” where the history of concrete comes to life.
This educational facility showcases various concrete applications,
highlights important projects from around the world, shares the
story behind EFCO’s 80+ year history, and much more. Our staff
will customize your visit to cater to your interests and needs.

 EFCO Resources
For additional information about EFCO forming systems
to support the E-BEAM® & SUPER STUD®, consult the
following catalogs.
EFC-717M EFC-1084M
PLATE GIRDER ® EFCO POWER SHIELD

EFC-841M EFC-890M
CONSTRUCTION E-Z DECK®
SUPPORT SYSTEMS

EFC-1015M EFC-1040M
EFCO DECK® EFCO GUIDED
RAIL SYSTEM®

 EFCO Online

www.EFCOFORMS.com
Learn More About EFCO Forming & Shoring Solutions.

www.HandsetFormwork.com
An EFCO website dedicated to handset
concrete forming systems.

www.EFCOOnline.com
Contact EFCO Online at EFCOOnline@
efcoforms.com or call toll free 866-915-4662
for more information and sign on today!

The EFCO PLATE GIRDER ® form system is a registered trademark. This product was designed for use with products © EFCO Corp.
manufactured by EFCO and it is recommended that it not be commingled with products of other manufacturer’s forming systems.
TRUART 2.5M REV. 08/17
Item #41896
RASAU INTAKE AND PUMP STATION
INTAKE PLANT
PENGURUSAN AIR SELANGOR
SDN BHD
MATERIAL SUBMISSION FOR APPROVAL

Appendix 3 – HANDSET FORMING SYSTEM

RWTP-GB-C&S-MSA-000100-00
EFC-852M H
 AND-E-FORM® System
English Metric

HAND-E-FORM ®

HANDSET FORMING SYSTEM


HAND-E-FORM ®
 HANDSET FORMING SYSTEM
EFCO’s handset solution is HAND-E-FORM®. The EFCO HAND-E-FORM system is the most
versatile handset forming system on the market today. Used in over 25 countries all over
the world, cost-conscious contractors are quickly realizing the benefits of this forming
system and its best value and lowest in-place concrete cost features. The real cost of
forming concrete is the cost of the forms plus the cost of using.

The EFCO HAND-E-FORM system is low cost, easy to use, and supplied for general-purpose
concrete construction. This means the system is ideal for:

• straight walls • walls with brick seat offsets


• round tanks • tunnels
• foundations • culverts
• cut up areas • columns
• abutments • and many, many more

The only limitation to the EFCO HAND-E-FORM system is the imaginations of the architect,
engineer, and the contractor.

The simple mechanics of the HAND-E-FORM system enables construction crews to quickly
learn how to assemble and cycle the equipment. HAND-E-FORM panels are lightweight and
conveniently sized. Even the largest panel can be set and stripped with one crew member.

 TABLE OF CONTENTS
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3
Heart of the System. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7
Simplicity and Versatility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-9
Step-by-Step Erection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-13
Features, Comparisons and Benefits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-16
HAND-E-FORM Applications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-21
Technical Data and Accessories. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22-27

2 | | 3
Heart of the System Tie Bearing Transfers Load
The tie bearing in a HAND-E-FORM®
panel is an integral part of the panel. It
is designed to transfer the concrete load
from the tie into the flanges and grill work
of the panel. It is conveniently located to
HAND-E-FORM® all-steel form panels include design permit easy placement and removal of
the Spreader Tie Pins. The locking device

features that cannot be duplicated by any other material. on the pin bearing is designed to lock the
pin into position to hold it securely during
the pouring operation.

All-Steel Ribs
There is no need for walers. The ribs of the
The innovative design features of the form panel are welded directly to the face plate
HAND-E-FORM system offer forming offering added strength. The face plate forms a
composite section with a rib and causes the face
efficiencies which can save you time and of the form to not only form concrete, but act as a
part of the structural cross section spanning from
money… efficiencies that give you the tie to tie. This eliminates the need for walering.
competitive edge.
All-Steel Face Sheet
The lightweight all-steel face sheet extends to the
edge of the panel, giving you consistent concrete
texture from one joint to another. This face sheet
will produce steel-smooth concrete year after
year. With proper care, you will never have to
replace the face sheet of an EFCO steel form.

Holes in flange are placed every 25 mm to


Flanges permit the panels to be clamped together
HAND-E-FORM flanges in numerous staggered positions. All
are welded directly EFCO HAND-E-FORM® panels have holes
behind the face plate, in the flanges at 25 mm center-to-center
providing a tight single around the perimeters for use by the
joint. Many competitors’ various clamps and other accessories.
wood face and steel frame
panels yield large heavy
joints seen as a “triple joint.”
Just One Worker
Unlike competitive systems, the HAND-
E-FORM System can be set and stripped
by just one worker. The lift handle assists
ease of handling.

BASIC 600 mm x 1200 mm HAND-E-FROM


All-steel panel for strength, durability and
quality concrete finish.

See pages 22-27 for list of panels and


accessories.

4 | HAND-E-FORM CATALOG | 5
Heart of the System EFCO Spreader Tie
The EFCO Spreader Tie acts
as a tie, keeping the formwork
together during the pour,
and as a spreader to hold the
two sides apart to ensure the
exact wall thickness required.
The Spreader Tie has a
recommended maximum
safe working load of 21 kN
Removable
and an ultimate load capacity
scaffold post of 42 kN.
holds two wood
guard rails.

Spreader Tie Pin


The EFCO Spreader Tie Pin locks
spreader ties and aligns form panels.
This connection fastens the spreader tie
Sway brace directly to the form panel, eliminating the
prevents bracket need for walers.
from swaying.
Only one Spreader Tie Pin is required,
versus the two wedge pins needed in
EFCO Scaffold Bracket and Post other systems.
The EFCO Scaffold Bracket quickly
attaches to most any vertical flange of
an EFCO HAND-E-FORM set-up with
the use of spreader tie pins.

EFCO Aligner Clamp


The simple cam-action EFCO Aligner
Clamp makes it easy to place aligners.
The aligner clamp clamps down with a
positive cam-action, pulling and holding
the aligner tightly against the panels.
Standard EFCO Aligner Clamps are
available for 2 x 4 wood aligners.
EFCO Plate Clamps
The EFCO Plate Clamp is used to hold
the forms together. It has a dowel pin Pipe Brace and Pipe Brace Shoe
that goes through the flange holes to Aligning the top edge of the set-up is very important
align the panels and the jaw comes and is easily accomplished with a diagonal adjustable
down to lock them together. This is a pipe brace or turnbuckle. Attach the pipe brace to a
fast and efficient one-piece connection. vertical flange form joint or turnbuckle to horizontally
align. The spacing of braces or turnbuckles will vary
with job conditions.

6 | HAND-E-FORM CATALOG | 7
Curved
 HAND-E-FORM MEANS Walls

Simplicity & Versatility Corbels


and
Haunches

The HAND-E-FORM® Forming System is an easy-to-use system. It is the most versatile


handset forming system on the market today. Inexperienced workers quickly learn the simple
mechanics of this system. Unlike competitive systems, HAND-E-FORM panels are lightweight
and conveniently sized. Even the largest panel can be set and stripped by just one worker.

Brick Seat
Corners Offsets
HAND-E-FORMS require no
wood walers for structural
strength. Only single wood Inserts
aligners are required to
align the form set-up.
HAND-E-FORM’S single
joint requires only 1/3 the
concrete finishing labor of
competitive systems with
triple joints.

Round Tanks

Pilasters Tunnels and Culverts

You can stand them up, lay them on their


side, form them around a curve, do high
walls, low walls, form step footings in
25 mm increments, do battered walls,
corners, pilasters, tunnels, culverts, etc.

8 | HAND-E-FORM CATALOG | 9
Step 1
 HAND-E-FORM ERECTION OF FIRST SIDE After the wall line has been
established, a suitable base plate
is fastened to the footing.

Step by Step Step 2


Begin erecting forms at a corner. This
illustration shows an inside corner; however,
erection of form panels can start at the inside
or outside face of a wall. Attach the inside
corner panel to the first HAND-E-FORM panel
EFCO form equipment will secure low forming costs and nice appearing concrete surfaces to be set. Secure the panels with 2 EFCO Plate
when properly erected. Clamps and nail with wood nails to the base
plate. Set the inside corner panel and one
panel in each direction to hold the first panels
When the form equipment is delivered to the project, the various size panels and the accessories erect and in position without bracing.
should be separated and stacked adjacent to the work area. Other required material such as
lumber, nails, tools and reinforcing steel should be on the jobsite.

Special emphasis should be placed on having a good formwork crew. Pre-planning the
formwork and retaining the same formwork crew will result in the minimum size crew working
Step 3
at maximum efficiency. Nail the form panel to the base plate in
the nail holes provided at both ends of
the plate. Use either 8d. “penny” or 16d.
“penny” nails for this purpose.
4

Step 4
Set the adjacent form panel
in place and begin plate
clamping. Because of the
unique design of the EFCO
Plate Clamp, it aligns and
clamps the forms together
rigidly. Special care should
be taken to properly place the
Plate Clamp. The jaw portion
of the Plate Clamp should
cover the third hole from the
top or bottom of the form
panel.

The EFCO Drift Pin (Item


#55999) is designed for
One end of the Pin and Plate aligning the holes in adjacent
Clamp Tool (Item #54999) is panel flanges. This will make
used to assist in the placing of it easier to align flange holes
Plate Clamps, when necessary. to place the plate clamps.
The other end of this tool is
used for placing and removing
spreader tie pins.

3
5 Step 5
After plate clamping this second panel,
push the panel into alignment with the
1 base plate and nail as illustrated. Repeat
steps four and five to continue erection.

10 | HAND-E-FORM CATALOG | 11
 HAND-E-FORM ERECTION OF SECOND SIDE

Erecting the
Step by Step To erect succeeding panels …
second side …
Place the first form panel directly opposite
the inside wall panel, inserting and pinning
the Spreader Ties. Nail the first form panel
to the base plate to prevent horizontal
movement.

EFCO Spreader Tie …


The EFCO Spreader Tie acts as a spreader
keeping the forms apart, as well as a tie,
keeping the forms together when the pour
is being made. Set the next panel on the base plate, Pin the Spreader Tie. Plate Clamp the form panel being set
inserting the Spreader Ties through to the previous form panel.
Ties may be placed on 1200 mm centers the tie slots.
vertically for a pour of 29 kPa or at 600 mm
centers vertically to provide a 600 x 600
nominal spacing in a 600 mm x 1200 mm
panel. This yields a 57 kPa pour pressure. Alignment …
Spreader ties may be removed and reused Because the EFCO Spreader Tie acts as both a tie and a spreader and is
or the tie is notched so that the ends may pinned directly to the form panels, the aligning of the HAND-E-FORM®
be broken off, leaving the remainder of the System is simple and fast.
tie in concrete.

Ties have a load carrying capacity of 21 kN


with a minimum ultimate strength of 42 kN
in tension.

The ties may be placed before or after the


panels are clamped in place. This allows
easy changes and the setting of resteel
either before or after the ties are in place.
Aligner Clamp
The simple one handed closing
Spreader Tie action of the EFCO Aligner Clamp
Due to the strength and the exact punching makes it possible for one worker
of the EFCO Spreader Tie, accurate wall to place aligners. The Aligner
dimensions are maintained. Clamps clamp down with a positive
cam action, pulling and holding
the aligner tight against the form.
Aligners are required on one side of
the set-up only. The aligner is not a
Spreader Tie Pin structural part of the form. It is only
The Spreader Tie Pin locks spreader ties for alignment.
and aligns form panels. This connection
fastens the spreader tie directly to the form
panel, eliminating the need for walers.

Only one EFCO Spreader Tie Pin is


required, versus the two wedge pins
needed in other systems.

12 | HAND-E-FORM CATALOG | 13
 FEATURES, COMPARISONS & BENEFITS

LOWER MATERIAL COSTS REDUCE AMOUNT OF TIES WITH


FEATURES BENEFITS GREATER TIE SPACING
All-steel EFCO HAND-E-FORMS cannot be matched for durability. With proper HAND-E-FORM face sheets are five times more dent resistant than composite
care, the steel face sheet of a HAND-E-FORM panel will last a lifetime. sheets and can withstand the demands of being used over and over and over FEATURES BENEFITS
again on your jobsite. Add it all up—maximum durability, less labor to clean and
maintain, plus the best in quality concrete finish equals the benefits of steel. 57 kPa pour pressure is achieved with a 600 mm x 600 mm tie spacing and 29 kPa With less ties, a smooth, clean concrete finish is achieved and assembly,
pour pressure is achieved with a 600 mm x 1200 mm tie spacing. stripping and finishing costs are reduced.

NO WOOD WALERS REQUIRED ONE WORKER CAN EFFICIENTLY


FEATURES
Only single wood aligners, never double, are required to straighten the form set-up.
BENEFITS
EFCO all-steel formwork is strong and doesn't require walers. It is quick and
ERECT THE FORMS
easy to assemble because it only requires a single wood aligner for alignment.
Easy-to-use Aligner Clamps secure the wood aligners to the formwork.
FEATURES BENEFITS
A HAND-E-FORM panel is lightweight, weighing only 32 kg/m2. The panel is Formwork is easily handled by one worker. The buddy system is eliminated. This
comprised of a steel alloy face sheet, steel stiffeners and side flanges all welded reduces inefficiencies when one worker is standing around waiting for another
together so it can be set in one piece. to return.

14 | HAND-E-FORM CATALOG | 15
 FEATURES, COMPARISONS & BENEFITS  HAND-E-FORM APPLICATIONS

FEATURES
SINGLE JOINT FINISH
BENEFITS
Applications
HAND-E-FORM provides a “single” tight joint with no offsets which produces The HAND-E-FORM System can consistently deliver quality concrete finishes
a dimensionally accurate, smooth finish concrete. because the steel panels have no grain to raise or plies to separate. With such
a smooth finish, finishing costs are reduced

COSTLY WOOD FILL FOR STEP


FOOTERS REDUCED
FEATURES BENEFITS
HAND-E-FORM can be stepped to the nearest inch for varying conditions with This eliminates the need for wood fillers to accommodate step situations.
the holes in the side flanges punched at 25 mm cc.

16 | HAND-E-FORM CATALOG | 17
 HAND-E-FORM APPLICATIONS

18 | HAND-E-FORM CATALOG | 19
 HAND-E-FORM APPLICATIONS

20 | HAND-E-FORM CATALOG | 21
HAND-E-FORM® – Technical Data & Accessories Flex Form Panels, Corners and Angles
NOT ALL SIZES ARE LISTED. CONTACT YOUR TERRITORY MANAGER FOR OTHER SIZES.

1200 mm 600 mm
STANDARD AND FLEX FORM PANELS, CORNERS AND ANGLES DESCRIPTION WEIGHT (kg) ITEM NO. WEIGHT (kg) ITEM NO.

Flex Form Panel


Flex Form Panel 100 mm 3.3 01M20 1.7 23M20

Flex Form Panel 75 mm 3.0 06M20 1.5 28M20

Flex Form Panel 50 mm 2.7 11M20 1.4 33M20

Outside Angle Corner


Outside Angle Corner 57 mm x 57 mm 3.1 01M23 1.5 03M23

Outside Angle Corner Tie Angle 3.6 01M24 1.8 03M24

Inside Angle Corners


Inside Angle Corner 150 mm x 150 mm 10.2 09M21 5.2 11M21

Inside Angle Corner 100 mm x 100 mm 8.6 01M21 4.7 03M21

Inside Angle Corner 50 mm x 150 mm 7.6 05M21 4.0 07M21

Outside Flex Angle Corner


Outside Flex Angle Corner 100 x 100 mm 5.1 08F73 – –

Outside Flex Angle Corner 75 x 75 mm 4.0 01M26 2.0 03M26

Inside Flex Angle Corner


Inside Flex Angle Corner 100 x 100 mm 5.1 07F73 – –

Inside Flex Angle Corner 75 x 75 mm 4.2 09M26 2.1 11M26

Insert Angle
Insert Angle 38 mm x 25 mm 1.6 01M25 0.8 03M25

Inside Fillet Corner


HEF 600 x 1200 HEF 500 x 1200 HEF 400 x 1200 HEF 350 x 1200 HEF 300 x 1200 Sizes as listed
50 mm Inside Fillet Corner 300 mm x 300 mm 16.8 01M22 8.8 03M22

Sizes as listed
Inside Fillet Corner 250 mm x 250 mm 14.8 05M22 7.8 07M22

Standard Panels The most versatile


Inside Fillet Corner 200 mm x 200 mm 12.2 09M22 6.3 11M22

25 mm
modular
This listing shows standard modular panels offering a versatile set of forms for HAND-E-FORM
a general contractor. The 600 mm x 1200 mm panel is the basic building block; panel
the balance of the panels are take-up panels.

LENGTH
2400 mm 1200 mm 600 mm
DESCRIPTION WEIGHT (kg) ITEM NO. WEIGHT (kg) ITEM NO. WEIGHT (kg) ITEM NO.

HAND-E-FORM 600 mm 45.7 01M33 23.4 01M01 12.4 01M03


HAND-E-FORM 550 mm 38.5 03M33* 21.4 03M01 11.5 03M03
HAND-E-FORM 500 mm 41.2 05M33 20.5 05M01 10.8 05M03
HAND-E-FORM 450 mm 32.7 07M33* 18.2 07M01 9.4 07M03
HAND-E-FORM 400 mm 32.3 09M33 16.5 09M01 8.7 09M03
HAND-E-FORM 350 mm 27.2 11M33 15.5 11M01 8.0 11M03
HAND-E-FORM 300 mm 24.3 13M33 12.5 13M01 6.6 13M03
HAND-E-FORM 275 mm 22.0 14M33* 11.9 14M01 6.3 14M03
HAND-E-FORM 250 mm 21.9 15M33 11.2 15M01 5.9 15M03
HAND-E-FORM 200 mm 19.1 17M33 9.7 17M01 5.0 17M03
HAND-E-FORM 175 mm 16.3 18M33* 9.4 18M01 4.7 18M03
HAND-E-FORM 150 mm 13.3 19M33 6.8 19M01 3.4 19M03 100 mm 75 mm 50 mm OUTSIDE OUTSIDE INSIDE INSERT INSIDE FILLET
HAND-E-FORM 125 mm 11.8 20M33* 6.4 20M01 3.1 20M03
FLEXIBLE FLEXIBLE FLEXIBLE ANGLE TIE ANGLE ANGLE ANGLE CORNER
FORM FORM FORM CORNER CORNER CORNER 38 mm x 25 mm 200 mm x 200 mm
All products listed may not be available for lease in certain markets. Please check your local EFCO office for availability of specific products * Sale Only PANEL PANEL PANEL 57 mm x 57 mm 57 mm x 57 mm 100 mm x 100 mm x 1200 mm x 1200 mm
1200 mm 1200 mm 1200 mm x 1200 mm x 1200 mm x 1200 mm

22 23
Spreader Tie Sleeve (For Sale Only)
Plate Clamp Drift Pin EFCO Ironworker Spreader Plastic sleeve for Spreader Tie allows easy recovery of Spreader
Used to line up holes in flanges of form
Tie Press** (For Sale Only) Ties up to 400 mm.
Holds two adjacent EFCO® panels
together, transfers loads from adjacent panels during erection. The EFCO Ironworker Spreader Tie DESCRIPTION WEIGHT (kg) ITEM NO.
panels to ties and lines up face plates. Press is available to cut ties on site Spreader Tie Sleeve (roll of 230 m) 3.1 84176
DESCRIPTION WEIGHT (kg) ITEM NO. at large construction projects.
DESCRIPTION WEIGHT (kg) ITEM NO. Drift Pin 0.4 55999
DESCRIPTION WEIGHT (kg) ITEM NO.
Plate Clamp 100/Bucket 0.2 05999
Press 932.1 01473
Gauge Assembly 17.7 30473
Spreader Tie Plastic Cones (For Sale Only)
Pin and Plate Clamp Tool
Die for 12.5 mm Break-back or 32.7 03473 Used with 38 mm break-back spreader ties to permit breaking tie
Spreader Tie Pin Used to place and remove spreader tie Removable Spreader Ties end with minimum spalling of concrete.
pins and/or plate clamps.
Pin fastens spreader tie to form panel, acts as **Use to produce 12.5 mm Break-back Spreader Ties. DESCRIPTION WEIGHT (kg) ITEM NO.
dowel between panels and carries concrete DESCRIPTION WEIGHT (kg) ITEM NO. Spreader Tie Plastic Cones 0.1 12889
pressure from panel to spreader tie.
Pin and Plate Clamp Tool 0.7 54999
EFCO Spreader Ties (For Sale Only) 38 mm 38 mm

DESCRIPTION WEIGHT (kg) ITEM NO.


Choose from 3 EFCO Spreader Tie Options
Spreader Tie Pin 600/Bucket 0.1 04999 21 kN Work Load Capacity Wall Thickness
EFCO Vinyl Chamfer 14 mm
38 mm Break-back Tie
14 mm
42 kN Breaking Load Capacity
Strip (For Sale Only) 75 mm
EFCO Spreader Ties can be cut so that the ends
DESCRIPTION WEIGHT (kg) ITEM NO. may be broken back 12.5 mm from the face of
Rubber Seated Aligner Clamp 14 mm Wall Thickness 14 mm the concrete, after the forms are removed. By
19 mm x 19 mm x 2400 mm 0.7 10M99
Fastens steel tube aligners to forms for Vinyl Chamfer Strip 20/Box special order, ties can be furnished to break
alignment and walering where necessary. 1 REMOVABLE SPREADER TIE WITH HANDLE 38 mm from the concrete surface.
• Cost less than break-back ties
DESCRIPTION WEIGHT (kg) ITEM NO. • Are easier to place during assembly
Rubber Seated Aligner Clamp 0.3 50999 EF-COAT® Form Release Agent (For Sale Only) • Speed cycling of system as ties are removed prior to
50/Bucket
EF-COAT is a petroleum-based non- panel Spreader Tie Hole Plugs (For Sale Only)
staining release agent that when Use only when required to cover the unused
applied to the face sheet of panels spreader tie holes in the form panel.
before every pour will:
Provide Easy Form Release DESCRIPTION WEIGHT (kg) ITEM NO.
Speed Cycling of System
14 mm Wall Thickness 14 mm Spreader Tie Hole Plugs 0.1 94M99
Extend Life of System 25 mm x 3 mm 2000/Box
2 REMOVABLE SPREADER TIE
• To order, use same item numbers as Break-back Spreader
DESCRIPTION WEIGHT (kg) ITEM NO. Ties but specify “no Break-back” on order.
EF-COAT 55-Gal. (208-Liter) Drum 190.5 06894 Spreader Tie Clamp
Tube Aligner
EF-COAT 5-Gal. (19-Liter) Can 18.1 07894 Concrete cover Used to clamp Spreader Tie across the
from end of
DESCRIPTION WEIGHT (kg) ITEM NO. Break-back top of the form keeping the top tie out
tie to face of
Tube Aligner x 7200 mm 28.0 14M24 concrete wall. of the concrete.
EF-GARD R1® Form Release Agent (For Sale Only) 12.5 mm 12.5 mm
Tube Aligner x 6000 mm 23.3 13M24 DESCRIPTION WEIGHT (kg) ITEM NO.
EF-GARD R1 is a water-based non-staining release agent that
Tube Aligner x 4800 mm 18.1 15M24 when applied to the face sheet of panels before every pour can: Spreader Tie Clamp 200/Bucket 0.1 36999
14 mm Wall Thickness
Tube Aligner x 3600 mm 14.0 12M24 Prevent Rust 12.5 mm Break-back tie
14 mm

Provide Easy Form Release


Tube Aligner x 3000 mm 11.2 30M24 3 BREAK-BACK SPREADER TIE
Speed Cycling of System
Tube Aligner x 2400 mm 9.3 11M24 • Available with 12.5 mm and 38 mm Break-back
Extend Life of System
• 12.5 mm Break-back Tie is standard unless specified
Tube Aligner x 1800 mm 6.7 18M24
DESCRIPTION WEIGHT (kg) ITEM NO. otherwise with order.
Tube Aligner x 1200 mm 4.7 10M24
Spreader Tie Rubber
EF-GARD R1, 5-Gal. (19-Liter) Can
19.1 12894
Notes: Waterstop (For Sale Only)
(Concentrated) 1) Ties available in any length to meet requirements.
Neoprene rubber waterstop.
2) Order all spreader ties by wall thickness.
3) To measure Spreader Ties: The center to center distance of the DESCRIPTION WEIGHT (kg) ITEM NO.
holes in the Spreader Tie is 28 mm greater than the nominal length
of the tie. For example, a Spreader Tie for a 300 mm wall would Spreader Tie Rubber Waterstop 0.1 02990
measure 328 mm center-to-center of holes. 22 mm x 5 mm x 57 mm 100/Bag

24 25
Pipe Braces Window and Door
EFCO® Pipe Braces offer support and Bulkhead Panel
alignment to structures and reinforcing
EFCO Scaffold Slab Edge Bracket
steel in heights. Due to macrometric Window and Door
Bulkhead Panel
adjustment and bolt graduation, EFCO Bracket and Post Attaches a slab edge panel to the wall by attaching to the inside
Pipe Braces have a push/pull action which top tie.
Provides an effective platform for setting
makes them useful in many applications.
and/or stripping forms. Steel Tube Aligner
HAND-E-FORM
and Aligner Clamp
Slab Edge Bracket
DESCRIPTION WEIGHT (kg) ITEM NO. Item #01M98
HAND-E-FORM
Scaffold Bracket 8.2 01988 Slab Edge Form
Scaffold Post 2.8 23988
Spreader Tie Keeper
DESCRIPTION WEIGHT (kg) ITEM NO. Item #25M98

Heavy Duty Telescoping Pipe Brace Spreader Tie


900 mm - 1500 mm 13.6 81106 Hammer Spreader Tie Puller Spreader Tie
Pin (typ)
Window and Door
Bulkhead Corner
1500 mm - 2700 mm 23.0 81107 This puller can be used to pull EFCO
Spreader Ties of any length when
2100 mm - 3300 mm 27.2 81108 DESCRIPTION WEIGHT (kg) ITEM NO.
properly greased. Bulkhead Panel Corner
3000 mm - 4500 mm 36.3 83109 Slab Edge Bracket 3.5 01M98
Length
3600 mm - 6100 mm 47.2 81079 DESCRIPTION WEIGHT (kg) ITEM NO. 600 900 1200 150 x 150
Width ITEM NO. WEIGHT ITEM NO. WEIGHT ITEM NO. WEIGHT ITEM NO. WEIGHT
4500 mm - 7900 mm 61.2 81143 Hammer Spreader Tie Puller 7.9 01993
100 15M34 6.1 16M34* 9.1 17M34 12.1 25M34 2.0
6700 mm - 10700 mm 158.8 80078
Walkway Bracket 125 45M34 6.9 46M34* 10.2 47M34 13.6 55M34 2.3
Non-Telescoping Pipe Brace
2470 mm – 2670 mm (with shoe) 8.8 50A46
Lever Tie Puller Allows for easy access to upper panels without support to the 150 75M34 7.7 76M34* 11.4 77M34 15.1 85M34 2.5
ground. Capacity = 2.4 kN/m2 live load over width of walkway *FOR SALE ONLY
Accessories This puller, together with a small block of bracket, with a maximum of 2.4 m spacing between brackets.
wood, is used to pull EFCO Spreader Ties
Ø19 mm x 100 mm Quick Bolt w/ Nut 0.4 80182
up to 250 mm long from concrete walls. It BULKHEAD PANEL TOP VIEW
Pipe Brace Shoe PBS-1 2.7 80080 is also used in conjunction with the Bulge
Jet Bolt Assembly 19 mm x 125 mm 0.7 96180 Repair Kit. 1225 mm
HAND-E-FORM
Walkway and Slab Edge Form
DESCRIPTION WEIGHT (kg) ITEM NO. rail planking by
Spreader Tie
contractor Re-rod
Keeper
Lever Tie Puller 3.4 01996
Spreader Tie
Pin (typ) Spreader Tie
Warning: Walkway
brackets must only be used
with standard Spreader
Turnbuckle Brace Plate Puller Walkway
Bracket Ties (Options 1 or 2 on If the wall continues past the
page 25), Spreader Tie
Used in stripping form panels from concrete. Keepers and Pins. Do Not If the wall ends at the end of the forms, use wood
The EFCO Turnbuckle Brace assures use Break-back Ties with
end of the forms, use an bulkhead (contractor provided)
accurate alignment of a form set- Walkway Brackets.
EFCO bulkhead panel. to allow the wire mesh or re-
up when using 2 x 4 braces. DESCRIPTION WEIGHT (kg) ITEM NO. DESCRIPTION WEIGHT (kg) ITEM NO. See above chart for sizes. steel to continue.
DESCRIPTION WEIGHT (kg) ITEM NO. Plate Puller 4.5 01992 Walkway Bracket 14.5 10M98
Turnbuckle Brace 2.6 50998

EFCO Form Cleaner


Spreader Tie Pin Puller The proper care and maintenance of EFCO form equipment will
Spreader Tie Keeper ensure longer life, better concrete appearance and lower labor
Bulge Repair Kit For pulling spreader tie pins located in
costs. The EFCO Form Cleaner is designed to clean and oil form
Some EFCO accessories such as the Walkway Bracket and the
difficult positions, such as horizontal pins
If a bulge occurs in a wall set-up, Slab Edge Bracket utilize a spreader tie for support after concrete panel faces quickly and efficiently.
near inside corners, vertical pins near the
because of omitting a spreader has been cast. The EFCO Spreader Tie Keeper prevents the cast- • 300 mm diameter steel wire rotary brush
footing, etc.
tie or leaving out a spreader tie in-place tie from being pulled through the concrete. • 600 mm wide rough, oil resistant belt
pin, the Bulge Repair Kit is used DESCRIPTION WEIGHT (kg) ITEM NO. • Conveyor belt speed of 12.8 m/min.
to get the wall form back into DESCRIPTION WEIGHT (kg) ITEM NO. • Brush, conveyor pulleys and power
Spreader Tie Pin Puller 3.6 01994
position. The set consists of a Spreader Tie Keeper 0.15 25M98 transmission all on ball bearings
6 mm steel plate and multiple
• Lifting bale, tail lights, trailer hitch
punched spreader ties of 4
for transporting from job to job
different lengths. ness Use a spreader
lThick • Automatic Form Oiler
Wal tie pin on the
outside of the • Electric starter
DESCRIPTION WEIGHT (kg) ITEM NO. wall to secure
brackets to • Available with gasoline motor
Bulge Repair Kit 3.5 01M99 the tie
Spreader Tie Keeper • Easy to operate

DESCRIPTION WEIGHT (kg) ITEM NO.


Spreader Tie Pin Gasoline 737.1 80701

26 27
 Hands-On Learning
EFCO’s Concrete Construction and Forming Institute is a
great learning experience for you and your team. The Institute
features a full-scale demonstration bay for hands-on learning
opportunities, state-of-the-art classrooms, conference
rooms, and a 100-seat auditorium for presentations and
videos. Explore “Formation Hall,” where the history of
concrete comes to life. This educational facility showcases
concrete applications, highlights important projects from
around the world, shares the story behind EFCO’s 80+ year
history, and much more. Our staff will customize your visit to
support your interests and needs.

 EFCO Resources
For additional information about EFCO forming systems, consult
the following catalogs.

EFC-717M EFC-1084M
PLATE GIRDER® EFCO POWER SHIELD

EFC-841M EFC-753M
CONSTRUCTION EFCO LITE®
SUPPORT SYSTEMS

EFC-1015M
EFC-890M
EFCO DECK®
E-Z DECK®

 EFCO Online

www.EFCOFORMS.com
Learn More About EFCO Forming & Shoring Solutions.

www.HandsetFormwork.com
An EFCO website dedicated to handset
concrete forming systems.

www.EFCOOnline.com
Contact EFCO Online at EFCOOnline@
efcoforms.com or call toll free 866-915-4662
for more information and sign on today!

The EFCO PLATE GIRDER ® form system is a registered trademark. This product was designed for use with products © EFCO Corp.
manufactured by EFCO and it is recommended that it not be commingled with products of other manufacturer’s forming systems. TRUART 5M REV. 12/18
Item #24897
RASAU INTAKE AND PUMP STATION
INTAKE PLANT
PENGURUSAN AIR SELANGOR
SDN BHD
MATERIAL SUBMISSION FOR APPROVAL

Appendix 4 – GANG FORMING SYSTEM

RWTP-GB-C&S-MSA-000100-00
EFC-890M E-Z DECK System
(English Metric)

E-Z DECK®
GANG FORMING SYSTEM
For Deck Gang or
Handset Applications

Engineered Efficiency
American-Made

DECKING AND SHORING SYSTEM


E-Z DECK
 DECKING AND SHORING SYSTEM
The E-Z DECK® system combines three important Z-BEAM
components to deliver a complete deck system. These The Z-BEAM acts as a stringer for the E-BEAM. Not only
are the E-BEAM®, Z-BEAM®, and the E-Z SHORE®. These is it much stronger with spanning characteristics, it also
components have been designed and engineered to fly has a moment end connection. Using EFCO Quick Bolts
and move together in large modular units. to connect Z-BEAMS end to end will give you a beam
of any length with continual and consistent structural
Using all the standard components, the E-Z DECK system characteristics.
has amazing flexibility. Top the E-Z SHORE and Z-BEAM
stringer with EFCO’s all-steel galvanized E-BEAM to All the components of the E-Z DECK system, including
support a plywood deck. With the EFCO Z-BEAM serving the plywood deck, are rigidly connected for large
as stringers and the E-BEAM as joists, they can both be modular movement from pour to pour. There are
extended beyond a supporting E-Z SHORE four or more three basic methods of moving. These are the EFCO
legged module and cantilevered to support an even Crazy Wheel Dolly, a forklift truck, or a crane.
larger plywood deck. This gives real flexibility to easily
fit almost all jobs and varying dimensions. EFCO’s E-Z DECK system is designed to dramatically
reduce labor costs and, at the same time, shorten
E-Z SHORE construction cycle times. How?
The E-Z DECK system couples the benefits of larger • Modular units are assembled on the ground and
flying deck modules with fewer shore legs. Depending tilted upright or mechanically lifted into place.
on the configuration and height of setups, the EFCO • The shore framing components are aluminum
E-Z SHORE can support up to 124.5 kN per leg. The E-Z with the advantage of hollow tube fast thread
SHORE is aluminum providing a reduction in weight. plated steel screw jacks. Each shoring leg has a
The real differences come when you compare EFCO’s capacity up to 124.5 kN.
hollow steel tube with the rolled thread for the screw
• Shoring legs can be spaced anywhere from
jack and its steel wing nut with its faster double-lead
1220 mm x 1220 mm to 3050 mm x 3050 mm
thread for twice as much movement per revolution.
and rectangular modules in between.
E-BEAM
The EFCO E-BEAM is a galvanized steel beam designed This all spells fewer shores, fewer panels, and overall
as a structural member to support plywood deck a net fewer components. The result is less assembly
concrete forming applications. The cost is one-third and disassembly time and, even more important, larger
the price of an aluminum beam, weighs slightly less module movements between pours. EFCO’s E-Z DECK
than an aluminum beam, and no wood or plastic offers engineered efficiency, simple mechanics, and
nailer strip is required or even used. amazing flexibility.

 TABLE OF CONTENTS
Heart of the System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-5
E-Z DECK Tower Assembly. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7
E-Z DECK Gang Forming System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-9
E-Z DECK Flat Slab and E-Z DECK Flat Slab w/ Drop Panel. . . . . . . . . . . . . . . . . . . . . . . . . 10-11
E-Z DECK Beam and Slab. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Fastening Plywood to the E-BEAM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Features, Comparisons, & Benefits. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-17
Technical Data: E-BEAM & Z-BEAM. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-19
Engineerng Data. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20-21
E-Z DECK Applications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22-27
E-Z DECK Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28-30

2 | E-Z DECK GANG FORMING SYSTEM | 3


Heart of the System Lifting Eyes
The Lifting Eyes in combination
with the Z-BEAM® stringer,

With this setup it’s easy.


Contractor supplied Plywood
allows for large modular pick
E-BEAM®
movements from pour to pour.
EFCO’s E-BEAM joist is made of
lightweight galvanized steel and does not
use a wood nailer strip. Use either nails or
screws to attach a sheet of plywood to the
steel joist. The E-BEAM joist bolts directly
to the Z-BEAM stringer with the simple and
easy-to-use EFCO Quick Bolt with E-Nut.
U-Head
The U-Head design, allows quick
attachment to deck gangs. Gang
units can be lifted and cycled
without tear down
Z-BEAM®
and reassembly.
The Z-BEAM stringer bolts to the
U-Head to assist in gang and cantilever
situations. It can bolt to the E-BEAM
joist for gang applications and
pre-building of decks to fly into place.
Panel Clamp
Provides superior strength
and quick connection with
only the use of a hammer
to connect the panel and
shore post.
E-Z Bracing Panel & E-Z SHORE® Post
E-Z DECK® panels are self squaring and
use a hinged jaw to connect to the E-Z
DECK posts. EFCO’s E-Z DECK Posts come in
four lengths that connect end to end. They
are lightweight and have a load rating up to
124.5 kN per leg capacity. E-Z DECK® Machine Bolt
The EFCO Machine Bolt is used at
the connection of end plates when
stacking E-Z DECK posts.

Jack Washer
EFCO synthetic washers are used to
reduce the force required to release the
wing nut. Jacks support up to 124.5 kN,
Jack Retainer Clip
depending upon setup.
One required per jack. The Jack
Retainer Clip comes as a complete
assembly to secure the screw jack
to the shore leg.

Jack Long/Short
Slides into either end of post
to provide height adjustment
from 125 mm to 965 mm Steel E-Z DECK Jack Wrench
for durability; thin walled for The E-Z DECK Jack Wrench delivers
lightweight and easy handling. the necessary release force to both
arms of the wing nut simultaneously
by pulling on one arm while pushing
on the other arm.

4 | E-Z DECK GANG FORMING SYSTEM | 5


 E-Z DECK TOWER ASSEMBLY

Assembly
The rigidity of the E-Z DECK® system allows it to be assembled at a staging area and then
moved into position for the first pour, unlike conventional shoring systems which must
be built in place.

METHOD 1 - Bottom Up Building Both methods illustrated below keep your production work at ground level.

Step One: Assemble the decks using Step Two: On the ground, install the Step Three: Install E-Z Panels Step Four: Install third and fourth E-Z Step Five: Install the remaining
EFCO Z-BEAMS and E-BEAMS along E-Z Panels on the two Post Assemblies for the short sides of the tower on SHORE Post® using the gauge block for E-Z Panels to complete the
with contractor supplied plywood for for the long sides of the shore tower. one side of the previously assembled correct location to the panel. tower assembly. Install top jacks
each tower to be set up. All this work sections. The E-Z Panels should be at and U-Head brackets, and adjust
For your project,
can be done safely on the ground. right angles to the long side frames, for height.
establish the correct
distance from ends of sticking straight up from the floor.
the E-Z SHORE® Post Step Six: Stand the tower on end and
Assemblies to the E-Z Panel and cut fly the pre-assembled deck panel into
gauge blocks for spacing. place and bolt to the U-Head brackets.

METHOD 2 -Top Down Building For a tall E-Z DECK tower, there is an optional method that may prove efficient for your project.

Step One: Assemble the decks using Step Two: Build a single leg in Step Three: Tilt the first module only Step Four: Build another module and
EFCO Z-BEAMS and E-BEAMS along height module with four E-Z SHORE one shore post high to an upright posi- tilt to an upright position repeating
with contractor supplied plywood for post assemblies, four top jacks, tion. Add a pre-assembled deck to the steps two and three but excluding the
each tower to be set up. All this work and four U-Head brackets. Follow top and bolt to the U-Head brackets. top jacks and U-Head brackets. Step Five: Lift the pre-assembled Step Six: Build each successive module
can be done safely on the ground. the tower setup using the assembly This production work can all take tower each time and place a single required for the height of the tower
sequence of steps two, three and place in the staging area safely post module underneath. Connect and, as each module is built, lift the
four from method one above. on the ground. the modules using machine bolts. preceding assembly with the deck on
top and connect to the lower module.
Add jacks to last module of tower.

6 | E-Z DECK GANG FORMING SYSTEM | 7


 E-Z DECK GANG FORMING SYSTEM All the components of the E-Z DECK® system, including
the plywood deck, are rigidly connected for large

Ganging
modular movement from pour to pour. There are three
basic methods of moving. These are the EFCO Crazy
Wheel Dolly, a forklift truck, or a crane. EFCO has a
short video that a Territory Manager can share with you
to demonstrate these methods.

Releasing Loads and Moving Large Modules Pour to Pour The modular steel Z-BEAM® stringer is used over the
shore to pick up the loads and concentrate them over
Even with a good plan in place to release heavy shoring loads on an E-Z DECK® system, the torque required the shore head. To maintain shores in a vertical position,
to release the load is directly proportional to the applied load on the E-Z DECK Wing Nut. EFCO also offers an adjustable swivel head when there
are sloping undersides of slabs. The EFCO Z-BEAM® is
The E-Z DECK Jack Wrench delivers the necessary release force to both arms of the Wing Nut simultaneously modular and with its moment end connection, can be
by pulling on one arm while pushing on the other arm. The tool makes the job easier, eliminates breakage connected end to end for longer continuous beams.
The moment end connection develops the full strength
of the Wing Nut arms, and results in faster equipment cycling
of the Z-BEAM® at the connections. The Z-BEAM® can
cantilever beyond the concrete slab for a working
platform.

Clockwise
EFCO
Step 1 - Push Step 2 - Pivot Step 3 - Position Step 4 - Pull Crazy
Install the E-Z DECK Push the wrench onto the Pull the wrench forward to Apply pressure to the end Wheel
Jack Wrench on one wing nut and insert the center of the wing nut. of the wing nut wrench. Dolly
side of the wing nut. opposite wing. For additional torque, add
the handle extension.

The wrench assembly consists of the wrench which A feature of the handle extension is the angled end
by itself should be adequate for releasing light shore which enables the handle extension to be used in
loads. Included as part of the assembly is the handle multiple positions to accommodate small tightly
extension which when inserted into the wrench can spaced tower configurations.
provide extra torque to release moderate to high
shore loads.

Forklift
Possible Handle Extension Positions Truck

1015 mm, Approx. Leverage 1320 mm, , Approx. Leverage


when attached when attached
Opti
on 4
Opti
on 1 the difference
Opti
Angled end. The E-Z DECK® system is different
on 3
from other shoring systems. It
n5 is designed to be used in gang
Optio Plan view of screw jack and wrench. Optio
n2 forming situations. Other shoring
Use the wrench handle extension on the By placing the “angled end” of the wrench extension Crane
O ption
6 short end of the wrench to clear shore tower into the wrench, it can be used like a common “open-end systems are designed first as
centers of 1220 mm. mechanic’s wrench”. After each fractional rotation turn,
remove the wrench extension, rotate 180°, and handset systems and, in some
Double the force with two wrench handle then replace and rotate clockwise again.
extensions if required. situations, can be ganged.

8 | E-Z DECK GANG FORMING SYSTEM | 9


 E-Z DECK FLAT SLAB  E-Z DECK FLAT SLAB WITH DROP PANELS

With the large capacity of the E-Z SHORE® Post, EFCO can reduce both the number of shore posts and EFCO Territory Managers work with our team
associated stringers. Z-BEAM® and E-BEAM® can both extend beyond a rectangular four-corner post setup of formwork specialist engineers, handling both
by just varying the lengths of the Z-BEAM and E-BEAM. The system is very versatile. vertical forming and horizontal concrete shoring.
This includes slab with drop head beams and
column capitals.

10 | E-Z DECK GANG FORMING SYSTEM | 11


 E-Z DECK BEAM AND SLAB  FASTENING PLYWOOD TO THE E-BEAM

Monolithic drop beam and slab structures are excellent applications for the E-Z DECK®
system using the EFCO Z-BEAM® Jack Bracket and Short Jack.

Use just a hammer and drive nails directly into the steel E-BEAM. Self-drilling case-hardened carbon steel
black screws can be driven with a dry wall
Case hardened nails and a hammer is normally the best, easiest, and fastest screw gun, but are not recommended given
method to use. One nail through the plywood and into an EFCO E-BEAM® will hold the tear down labor and damage done to the
from three to four times more than the same nail into an aluminum beam with a plywood at the time of removal.
wood nailer. Use as few nails as possible to hold a 4' x 8' sheet of plywood in place.

An air actuated
nail gun is NOT A Comparison
normally required
Aluminum construction beams
but can be used to
drive case-hardened require a wood or plastic nail strip in
nails through order to attach plywood. Depending
the plywood and on use, wood and plastic strips
directly into the
frequently split and can be rendered
EFCO E-BEAM.
ineffective for holding nails. Over
time, the wood strips can also be
easily dislodged from the aluminum
construction beam.

EFCO’s E-BEAM
FASTENERS does not require a
wood nailing strip.
PULL OUT Nails are driven
NAILS AND SCREWS SIZE FASTENER
FORCE directly into
the lightweight
E-BEAM Nail (Yellow)
.100" x 1 1/2"
steel. With the
(#4 Box, 1,000/box) 73 kg (160 lb.) relatively high
(2.5 mm x 38 mm)
Z-BEAM JACK DETAIL

SINGLE
POURS
EFCO ITEM #10890
cost aluminum
E-BEAM Nail (Yellow Collated) and value in
Note orientation of (200/coil 8,000/case) 73 kg (160 lb)
.100" x 1 1/2"
the scrap market,
(2.5 mm x 38 mm)
Z-Ribs to allow Jack EFCO ITEM #07890
many times aluminum has been
Bracket bolt-up U-Head stolen from job sites.
Assembly E-BEAM Nail (Green)
(#4 Box, 1,000/box) 2352Z, .100 .100 x 1 3/8"

MULTIPLE
186 kg (410 lb) The best practice for fastening
(2.5 mm) Series Gripshank (2.5 mm x 35 mm)

POURS
EFCO ITEM #12890 plywood to the EFCO E-BEAM is
to use a case-hardened nail and
125 mm - 330 mm

E-BEAM Nail (Green Collated)


.100 x 1 1/2"
(250/coil 4,000/case) 186 kg (410 lb)
(2.5 mm x 38 mm) hammer. Compare this to other
Plan View EFCO ITEM #08890
systems that may require self-drilling
Range

E-Z DECK screws. However, if a black flat head,


Short Jack Self-Drilling Screw 1 5/8’’ (41 mm) (100/bag)
SDS PH FL Reamer #3PT Zinc Plated 228 kg (500 lb)
#10-16 x 1 5/8" case-hardened, self-drilling screw is
(M5 x .08 mm x 41 mm) selected for the E-BEAM connection,
EFCO ITEM #11890

FASTENERS PULL
THRU PLYWOOD
drilling into the EFCO steel E-BEAM
Ledger Self-Drilling Screw 2 1/4’’ (57 mm)
(100/bag) SDS PH FL #8-18 x 2 1/4" will normally have substantially more
Beam Reamer #3PT Life Coat
228 kg (500 lb)
(M4 x .07 mm x 57 mm)
Bracket EFCO ITEM #13890
hold force than screws used on a
2 x 2 wood nailer strip. The plywood
Screw 1 5/8’’ (41 mm)
19 mm x 50 mm to E-BEAM connection will deliver a
Z-BEAM Automatic Feed for 3/4’’ (19 mm)
Quick Bolt Material Carlson Systems
228 kg (500 lb)
1 5/8’’ superior connection when compared
w/ Nut 800-372-6052 1 5/8’’ (41 mm) Wood to Steel (41 mm) to other systems and result in less
Wing tippedSelf-Drilling Screw
ITEM #SFW8162 labor and faster job progress.

12 | E-Z DECK GANG FORMING SYSTEM | 13


 FEATURES, COMPARISONS & BENEFITS

Z-BEAM STRINGER VERSATILE POST


FEATURES COMPARISONS BENEFITS FEATURES COMPARISONS BENEFITS
The Z-BEAM stringer bolts to the U-Head to
®
No other decking and shoring system has a stringer Because the EFCO Z-BEAM can be bolted end
®
EFCO’s E-Z DECK posts come in four lengths that
®
As with most systems, as the height of the shoring The post extrusion allows for both panels and
assist in ganging and cantilever issues. It can bolt with a moment end connection. Most of the other to end, you can achieve a stringer of any length connect end to end. The posts have a extrusion on setup increases, the load capacity generally accessories to be connected and removed easily
to the E-BEAM® joist for gang applications and systems bolt their stringer directly to the post or desired. The Z-BEAM®, because it is made of steel, the outside. They are lightweight and have a load reduces. EFCO’s E-Z SHORE® has a capacity up and quickly, increasing labor savings. With the
pre-building of decks to fly into place. It is made of jacks with a T-Bolt. The majority of the stringers are has consistent structural properties throughout its rating up to 124.5 KN per leg capacity. Long Jacks to 124.5 kN per leg with a 2.5:1 safety factor. end-to-end connection, a post of desired length can
lightweight steel, can be handset for those hard to made of costly aluminum and some even use wood life, unlike wood. or Short Jacks may be used to adjust leg height. For Be sure and compare the safety factor, as well be achieved. The versatility of the posts can either
reach places on the job. Z-BEAM has a moment end which can weather and deteriorate. engineering data, see pages 20 and 21. as the capacity for the height and weight to be be handset by workers or ganged, lifted by a crane
connection where you can bolt Z-BEAM end to end shored. With EFCO’s higher strength versatile post, and set in place.
and have the continuity of full strength through the normally fewer legs are required. Other systems do
connection. The beam only weighs 10.0 kg/m and a not offer a post with an extrusion that can accept Cross-section
View of the Post
full set of specifications are on page 19. both panels and a T-Slot for accessories. and Clamp

Cross-section
View of the Post

E-BEAM JOIST SELF SQUARING


FEATURES COMPARISONS BENEFITS
FEATURES COMPARISONS BENEFITS E-Z DECK panels are self-squaring. The system
®
Most systems use a T-Bolt that must be aligned The hinged jaw provides superior strength, enough
EFCO’s E-BEAM® joist is made of lightweight All other systems use either an aluminum joist with a With the E-BEAM® constructed out of galvanized uses a hinged jaw to connect the panel to the with a T-Slot before the panel can be connected to to accept planking or work platforms. The external
galvanized steel and uses no wood nailer strip. wood or plastic nailer strip or a wood beam to attach steel, the initial cost of owning an E-BEAM® is E-Z DECK® Posts. They are light enough to carry and the post. One such system has a five-step process grip design allows panels to be removed quickly
Either nail or use screws to attach a sheet of plywood to the joists. Systems that use a wood joist lower than aluminum. By attaching plywood to the only require a hammer for connecting to the post. per connection and requires multiple pieces that with ease and facilitate the movement of workers
plywood to the steel joist. The E-BEAM® joist bolts rely on straps for ganging their beams to posts and steel joist with either nails or screws, the holding can be lost very easily. and materials. It also speeds erection and tear-
directly to the Z-BEAM® stringer with the simple jacks. Nailing plywood to the EFCO E-BEAM is easy power is significantly greater compared to a wood down time, and allows for panels to be removed
and easy-to-use EFCO Quick Bolt with E-Nut. A full and reliable, delivering consistent results. Refer to nailer strip which also needs to be maintained. No from in-place towers when necessary.
set of dimensions and engineering specifications the “Let’s Nail It” chart on page 13 E-BEAM® has been retired due to too many nail
can be found on page 18. holes or too much use.

14 | E-Z DECK GANG FORMING SYSTEM | 15


 FEATURES, COMPARISONS & BENEFITS

E-Z DECK® JACK EASY MOVEMENT


FEATURES COMPARISONS BENEFITS FEATURES COMPARISONS BENEFITS
EFCO offers both a Short Jack and a Long Jack for Other systems have jacks made of aluminum that The EFCO wing nut and graphite treated jacks EFCO’s Crazy Wheel Dolly is a unique feature to the Most competitive shoring systems have been built Ganged shoring and decking can be moved from
use with the E-Z DECK Posts. The jacks are made of are built into the shoring posts. Aluminum jacks can use steel-on-steel and synthetic washers on E-Z DECK system. The dolly attaches to the bottom and used for manual assembly. For them, moving one place to another without system tear down
steel with multi-lead threads and are painted with be a constant maintenance problem. One system aluminum to reduce the amount of force required of either jacks or posts. EFCO is the only company in large gangs has come as an “afterthought.” The and reassembly. The unique design allows for
graphite paint. The jacks come with two synthetic uses two concepts, a jack and a slider principle that to release the load. Competitive systems use steel- to commercially offer a Crazy Wheel Dolly. They EFCO E-Z DECK system is designed and built with the stacking and transportation by one worker. A built-
washers and a spring loaded jack retainer clip. The creates a weak point at the shear pin. on-aluminum which require much more force to stack easily for convenient handling when not in end in mind—to move large gangs safely. in retainer arm allows for the dolly to securely
steel wing nut has a hard target point indicating release under load. EFCO uses a friction reducing use under load. fasten to the post or jack so the dolly can fly with
direction to retract or extend jack with a hammer synthetic washer design which requires much less the tables.
to plumb and grade. force to release a wing nut. With the hammer EFCO’s E-Z DECK system is designed and built to
target on the wing nut, workers can easily plumb be moved in large gangs safely using a crane, lift
and grade decks with only a hammer. The quick truck or the Crazy Wheel Dolly, all depending upon
release retainer clip allows the jack to be securely the application.
connected to the shore post.

CANTILEVER SOLUTIONS
SIMPLE U-HEAD FEATURES COMPARISONS BENEFITS
• The extension of the plywood gives incredible •
Deck Panel Systems require additional • Attach a wood ledger beam to the previously
FEATURES COMPARISONS BENEFITS versatility to both of the EFCO systems. components to support loose plywood closures poured wall or column structure and then lap
The EFCO E-Z DECK® system uses a spring loaded Only one other system has a U-Head design and With the U-Head design, tables can be safely and • The plywood extension of the deck can go beyond against walls and columns. the plywood extended over the ledger beam
U-Head design that clips on the top of E-Z DECK® there is no positive connection to the stringer other quickly assembled on the ground, flown in by a the system without the E-BEAM or Z-BEAM®. connected to a wall or column. This places the
posts or jacks. The U-Head quickly and securely than to use a tension strap with machine bolts. The crane, and then bolted to the U-Head. Gang units • The plywood support can come from a wall or a plywood in a spanning situation and allows
attaches to the stringer(s) for gang forming or other systems lack a U-Head. And when lifting as may be lifted and cycled without tear-down and column that is in place. spans up to 600 mm for a 250 mm slab depending
flying tables with a simple and easy to use EFCO a gang they now have to attach to the tower legs. reassembly. on the class of plywood used.
Quick Bolt. • Depending on the slab thickness to be supported
by plywood alone without a ledger beam,
placing the plywood in a cantilevering situation,
the 19 mm plywood with a 200 mm slab, you are
limited to 225 mm. With a 250 mm slab, you are
limited to 200 mm of plywood cantilever.

16 | E-Z DECK GANG FORMING SYSTEM | 17


 TECHNICAL DATA

E-BEAM Z-BEAM
E-BEAM® IS Z-BEAM® IS
CONSTRUCTED OF CONSTRUCTED OF
HIGH STRENGTH, DURABLE,
DURABLE, HIGH STRENGTH,
GALVANIZED STEEL LOW ALLOY STEEL

62 kN 71 - 124.5 kN
E-BEAM
E-BEAM
ALLOWABLE E-BEAM ALLOWABLE Z-BEAM
BEARING CAPACITIES BEARING CAPACITIES Z-BEAM

Z-BEAM
Allowable bearing load of 62 kN of a
Z-BEAM • E-BEAM on a single Z-BEAM
single Z-BEAM on E-Z DECK® post or
(17.5 kN)
124.5 kN max for a double Z-BEAM
• E-BEAM on a double Z-BEAM U-Head on an E-Z DECK post. Panel spacing
U-Head (24.5 kN) and jack extension may control
U-Head®
E-Z SHORE maximum allowable load.
E-Z SHORE Allowable bearing load of 17.5 kN E-Z SHORE
for E-BEAM on a single Z-BEAM.

EFCO’s E-BEAM® joist


ENGINEERING PROPERTIES The all-steel Z-BEAM with
its superb strength-to-
THE Z-BEAM IS
is made of lightweight
Material
ENGINEERING PROPERTIES
Steel
Material
Height
Steel
229 mm weight ratio and durability STRINGER FOR
galvanized steel and uses
no wood nailer strip. Either Height 165 mm Width 89 mm is designed to serve as a
stringer in conjunction with
THE E-BEAM®
Base Width 127 mm Nominal Weight 10.0 kg/m
nail or use screws to attach 6 4 the E-BEAM to form decks. The Z-BEAM is a stringer
Top Width 51 mm Ixx (For deflection calculations only) 3.74 x 10 mm
a sheet of plywood to the that is a complement to the
Nominal Weight 5.6 kg/m Bearing capacity on support member 175 kN/m (of bearing length)
steel joist. The E-BEAM® E-BEAM. Not only is it much
Ixx (For deflection calculations only) 2.87 x 106 mm4 E (Elastic Modulus) 200,000 N/mm²
joist bolts directly to the stronger with spanning and
Moment Capacity 6.52 kN-m Fy (Yield Strength Flange) 413 MPa
Z-BEAM® stringer with the E-nut improves the bolt nut pull-out crushing characteristics,
E (Elastic Modulus) 200,000 N/mm²
simple and easy-to-use capacity when connecting E-BEAM to it also has a moment end
Fy (Yield Strength Flange) 380 MPa
EFCO Quick Bolt. EFCO products. No wrench required connection, so when using
when attaching to E-BEAMS. DESCRIPTION MASS (kg) ITEM NO. two 19 mm x 50 mm EFCO
DESCRIPTION MASS (kg) ITEM NO.
Z-BEAM x 1220 mm 14.4 04522 Quick Bolts to connect
E-BEAM x 1200 mm 6.8 04A24 Z-BEAM x 1830 mm 19.5 06522 Z-BEAMS end to end, you can
E-BEAM x 1800 mm 10.2 06A24 Z-BEAM x 2440 mm 25.0 08522 obtain a beam of any length
E-BEAM x 2400 mm 13.6 08A24 Z-BEAM x 3050 mm 30.4 10522 with continual and consistent
E-BEAM x 3000 mm 17.0 10A24 Z-BEAM x 3660 mm 35.8 12522 structural characteristics.
E-BEAM x 3600 mm 20.4 12A24 Z-BEAM x 4270 mm 41.3 14522
E-BEAM x 4200 mm 23.8 14A24
E-BEAM x 4800 mm 27.1 16A24
E-BEAM x 5400 mm 30.5 18A24
E-BEAM x 6000 mm 33.9 20A24
E-BEAM x 6600 mm 37.3 22A24
E-BEAM x 7200 mm 40.7 24A24

18 | E-Z DECK GANG FORMING SYSTEM | 19


 ENGINEERING DATA  ENGINEERING DATA

Data
Multiple Panel E-Z DECK Tower
Capacity = 124.5 kN/post (Max)
2.5:1 Safety Factor
Legs connected in perpendicular
E-Z SHORE Single Post and Single Frame Data

Rated capacities per chart


Note 1

planes by two or more panels. Capacity is per Post Height Note 3


Restrained at Deck Level Typical Multiple Panel E-Z DECK Tower
Single Post or Single Frame Shoring
3:1 Safety Factor
Configuration Notes (Restrained at Deck Level): Fixed U-Head and base
®
Note 2
1. E-Z DECK towers must be secured at deck forming level Post Assemblies
in all directions to previously poured walls, beams, or 89 PA 1.5
1320 mm Post With Long Jack
columns. External bracing is required at unrestrained
Note 1830 mm Post With Long Jack
PA 2.0
1 P
decks like building perimeters or some beam soffits.
P In no case should the Lateral Restraint be less than 2660 mm Post With Long Jack
PA 2.8

1.5 kN/m of floor edge or 2% of Total Dead Load on the 67 3490 mm Post With Long Jack
PA 3.6

Capacity (kN)
deck forming level distributed as a uniform load per linear
meter of slab edge, whichever is greater.

E-Z DECK
2. E-Z SHORE® Posts shall be erected plumb within 1% of 44
the height of the tower.
Note 3 3. For post loads ≤ 71 kN:
Single Post Shoring Single Frame Shoring
Maximum extension for the Long Jack is 965 mm. 22
Maximum extension for the Short Jack is 330 mm. Notes:

Post

Post Height
508 mm

For post loads > 71 kN, consult EFCO Engineering. 1. E-Z DECK® for Single Post and Single Frame Shoring must be secured at deck
forming level in all directions to previously poured walls, beams, or columns.
4. See the table below for maximum distance between E-Z External bracing is required at unrestrained decks like building perimeters
0
Panel and end of the post for indicated loads. Consult

Jack
or some beam soffits. In no case should the Lateral Restraint be less than
1.2 1.5 1.8 2.1 2.4 2.7 3.0 3.3 3.6 3.9 4.2 4.5
Note 2 EFCO Engineering for other loads. 1.5 kN/m of floor edge or 2% of Total Dead Load on the deck forming level
distributed as a uniform load per linear foot of slab edge, whichever is greater.
5. See the table below for maximum spacing between E-Z 2. E-Z SHORE® Posts shall be erected plumb within 1% of the height of the tower.
Panels for indicated loads. Consult EFCO Engineering for Post Height (m)
3. Maximum extension for the Long jack is 965 mm. Maximum extension for the
other loads. E-Z Panels should be spaced approximately Short Jack is 330 mm.
equally from top to bottom of the legs.
For More Details, Consult EFCO Engineering

POST MAX. DISTANCE MAX. SPACING


H max = 13.8 m (for post loads ≤ 71 kN)

LOAD
(P)
BETWEEN E-Z PANEL AND
THE END OF THE POST
BETWEEN
E-Z PANELS Special Conditions
Note 6 44 kN 589 mm 3246 mm
58 kN 356 mm 2776 mm E-Z DECK Swivel Head Limitations Light-Duty Work Platform
62 kN 305 mm 2672 mm 1. Post capacity limited to 89 kN. 1. Panels are designed to support a light-duty
71 kN 200 mm 2469 mm 2. To be used at top of tower only. platform 1.20 kN/m2.
3. Do not use on single post shoring. 2. Platform area not to exceed 5.95 m2 per panel.
6. Joints at posts shall be connected using four 4. Top Jack limited to 300 mm extension for 3. Use single span scaffold planks only, 2440 mm
Ø13 mm x 38 mm EFCO machine bolts with nuts. post loads > 62 kN. maximum span.
5. E-BEAM capacity is reduced and is based on
7. If leg loads are not equal, maximum load ratio
R2/R1 = 4/1. maximum angle. Consult EFCO Engineering
with specific conditions.
8. Contractor to ensure that foundation below shore jacks is
adequate to receive load (mudsill or reshored slab).
5

Freestanding Multiple Panel E-Z DECK Tower


Note

Configuration (Unrestrained at Deck Level): U-Head


Consult EFCO Engineering. Assembly
Z-BEAM

Stripping Notes:
1. Shoring shall remain in place until the concrete has
achieved its full specified strength or a lower strength
advised by the contractor’s engineer.
2. Load on shoring to be released progressively from
E-Z DECK
the center of the span outward to columns or walls as
Note 3 Note 4 determined by the contractor’s engineer.
Swivel Ø13 mm x 38 mm
Light-Duty
EFCO machine
3. For long spans with multiple shoring towers, ensure bolt w/nut Work Platform
Panel Size unloading of falsework is performed in sequence to avoid
unacceptable load re-distribution to shore towers still E-Z DECK
under load.
R R 2
Note 7 Post
1
4. DO NOT dissemble or remove shoring panels until the
load on the E-Z SHORE Posts have been released.

20 | E-Z DECK GANG FORMING SYSTEM | 21


 E-Z DECK APPLICATIONS

Applications

22 | E-Z DECK GANG FORMING SYSTEM | 23


 E-Z DECK APPLICATIONS

24 | E-Z DECK GANG FORMING SYSTEM | 25


 E-Z DECK APPLICATIONS

The E-Z DECK® system combines three


important components to deliver a
complete deck system. These are
the E-BEAM®, Z-BEAM® and the E-Z
SHORE®. These components have been
designed and engineered to fly and
move together in large modular units.

26 | E-Z DECK GANG FORMING SYSTEM | 27


E-Z DECK® - ACCESSORIES NOT ALL SIZES ARE LISTED. CONTACT YOUR TERRITORY MANAGER FOR OTHER SIZES.

Z-Strip (Sale Only)


Panels The Z-STRIP covers plywood
Quick connect bracing. Used to E-Z DECK 2 x 4 Post Clamp gaps between deck panels.
space and brace posts where
height and load configurations DESCRIPTION WEIGHT (kg) ITEM NO. DESCRIPTION WEIGHT (kg) ITEM NO.
require, or where a shoring tower E-Z DECK 2 x 4 Post Clamp 1.9 70521
E-Z DECK Z-Strip x 1220 mm 1.6 06521
configuration is desired. Length E-Z DECK / Pro 4 Pipe Clamp 1.4 75521
E-Z DECK Z-Strip x 2440 mm 3.2 07521
dimension is center-to-center
of tower legs. Fast clamping
action allows assemblies to be
erected quickly. Clamp design
allows removal of panels while Z-BEAM E-Z DECK Swivel Head
posts stay in place on special
The all-steel Z-BEAM with its superb
E-Z SHORE® Post applications.
strength-to-weight ratio and durability Connects to top of E-Z SHORE
A special high-strength aluminum is designed to serve as a stringer in post to accommodate slope.
extrusion with a 10 mm thick connecting DESCRIPTION WEIGHT (kg) ITEM NO. conjunction with the E-BEAM to form decks.
plate welded to each end. The exterior is E-Z DECK Panel x 1220 mm 10.3 22520 DESCRIPTION WEIGHT (kg) ITEM NO.
a unique design with a T-Slot and exterior E-Z DECK Panel x 1830 mm 12.3 23520 DESCRIPTION WEIGHT (kg) ITEM NO. E-Z DECK Swivel Head 6.1 40521
groove to attach the bracing panel. E-Z DECK Panel x 2440 mm 14.3 24520
Z-BEAM x 1220 mm 14.4 04522
E-Z DECK Panel x 3050 16.3 25520
Z-BEAM x 1830 mm 19.5 06522
DESCRIPTION WEIGHT (kg) ITEM NO.
Z-BEAM x 2440 mm 25.0 08522
E-Z DECK Post x 1320 mm 8.2 05520
Z-BEAM x 3050 mm 30.4 10522 E-BEAM Diaphragm
E-Z DECK Post x 1830 mm 10.7 06520
Z-BEAM x 3660 mm 35.8 12522
E-Z DECK Post x 2660 mm 15.1 07520 Used to secure in place EFCO
Z-BEAM x 4270 mm 41.3 14522
E-Z DECK Post x 3490 mm 19.4 08520 E-BEAMS when pouring slanted
E-Z DECK Post x 5320 mm (Sale Only) 28.6 03520 elevated slabs.
U-Heads
Attaches to Jack or Post to
15521 E-BEAM
provide support and attachment
DESCRIPTION WEIGHT (kg) ITEM NO.
for one or two Z-BEAM stringer The E-BEAM is a galvanized steel beam
E-Z DECK Jacks primary horizontal supports. designed as a structural member (deck joist) to
E-BEAM Diaphragm (Sale Only) 1.2 45474

support plywood in deck forming applications.

DESCRIPTION WEIGHT (kg) ITEM NO.


88521 86521 E-BEAM x 3000 17.0 10A24 Slot Bolt
Slides into either end Slides into either end E-BEAM x 3300 18.6 11A24 Use to connect pipe brace shoe to
of post to provide of post to provide DESCRIPTION WEIGHT (kg) ITEM NO. E-BEAM x 3600 20.4 12A24 E-Z SHORE post.
length adjustment from length adjustment E-Z DECK Aluminum U-Head 2.7 15521 E-BEAM x 3900 22.0 13A24
125 mm to 330 mm from 125 mm to E-Z DECK Steel U-Head 5.2 88521 DESCRIPTION WEIGHT (kg) ITEM NO.
E-BEAM x 4200 23.8 14A24
extension. Steel for 965 mm extension. E-Z DECK Steel U-Head w/Tube 6.1 86521 Slot Bolt 13 mm x 32 mm w/ Nut 0.1 06A91
durability; thin walled Steel for durability; Steel U-Head Bolt 13 mm x 32 mm
for lightness (2 washers thin walled for light 2.6 84521
w/Nut (Bag of 50) (Sale only)
included per jack). weight and easy Quick Bolt w/E-Nut
handling (2 washers
Ledger Beam Bracket Quickly secures EFCO
included per jack).
E-BEAMS to any EFCO Pipe Brace Shoes
The Ledger Beam Bracket bolts to the ends of equipment.
This shoe can be used This shoe is used to brace “rogue”
DESCRIPTION WEIGHT (kg) ITEM NO. a pair of Z-BEAMs, accepting E-Z DECK Short to brace towers to other legs to E-Z DECK Shore Tower thus
E-Z DECK Short Jack Assembly 8.2 15520 Jacks. It is also used in the Cunningham Hinge structures. This will be helping to create a five-leg tower. In
Beam Assembly. DESCRIPTION WEIGHT (kg) ITEM NO. particularly used for tall towers 80080 many shoring applications, there may
E-Z DECK Long Jack Assembly 13.2 16520 that require mid height bracing. be odd corners or edges where a
E-Z DECK Synthetic Washer Quick Bolt 19 mm x 38 mm w/ E-Nut These pipe brace shoes may single leg is required.
0.1 49520 0.3 75180
92 I.D. x 127 O.D. (RP) (100 per Bucket) also be used to resist slab
DESCRIPTION WEIGHT (kg) ITEM NO. edge forces at the perimeter
E-Z DECK Jack Retainer Clip 0.3 61520 of building.
Ledger Beam Bracket 6.5 90312

65521
62521
Machine Bolt (Sale Only) Universal Tripod
The EFCO Machine Bolt is DESCRIPTION WEIGHT (kg) ITEM NO.
used at the connection of Lightweight steel tripod stabilizes E-Z Clip E-Z DECK Pipe Brace Shoe PBS-6 1.1 65521
end plates when stacking the single shore post assembly.
Attaches E-BEAMS to SUPER STUDS E-Z DECK Pipe Brace Shoe PBS-5 1.1 62521
E-Z DECK posts.
and Z-BEAMS in situations where they E-Z DECK Pipe Brace Shoe PBS-1 2.7 80080
can not be aligned for bolting. Quick Bolt 19 mm x 100 mm w/Nut
0.4 80182
DESCRIPTION WEIGHT (kg) ITEM NO. (100/Bucket)
DESCRIPTION WEIGHT (kg) ITEM NO. EFCO Universal Tripod 9.4 10528
DESCRIPTION WEIGHT (kg) ITEM NO.
Machine Bolt 13 mm x 38 mm w/ Nut Tripod E-Z DECK Hook 1.0 34528
3.2 40180 E-Z Clip (45 per Bucket) 0.3 92474
(Bag of 50)
These two items ship together.

28 29
E-Z DECK Jack Wrench w/ Extension
Provides an easy-to-install
wrench and increased leverage E-Z DECK High Jack
to be applied to the jack wingnut
Lowers tower assemblies for
for load release.
transport and raises tower
assemblies for installation.

DESCRIPTION WEIGHT (kg) ITEM NO. DESCRIPTION WEIGHT (kg) ITEM NO.
E-Z DECK Jack Wrench w/ Extension 10.3 99520 E-Z DECK High Jack 191.6 01524

Crazy Wheel Dolly


Allows user to roll the entire
decking system from one
91542 location to the next.
DESCRIPTION WEIGHT (kg) ITEM NO.
E-Z DECK Crazy Wheel Dolly 26.2 50521
C-Caddy 90542

DESCRIPTION WEIGHT (kg) ITEM NO.


C-Caddy (13kN) 884.5 80542
C-Caddy (13kN) E-BEAM Saddle 3.1 90542
C-Caddy (13kN) Z-BEAM Saddle 3.1 91542
A325 Bolt 25 mm x 75mm w/ Nut
0.6 00936
(16 are required)
Hardened Washer 25 mm
0.1 00787
(16 are required)

30 | 31
 Hands-On Learning
EFCO’s Concrete Construction and Forming Institute is a great learning
experience for you and your team. The Institute features a full-scale
demonstration bay for hands-on learning opportunities, state-of-the-
art classrooms, conference rooms, and a 100-seat auditorium for
presentations or videos. Explore “Formation Hall,” where the history
of concrete comes to life. This educational facility showcases various
concrete applications, highlights important projects from around the
world, shares the story behind EFCO’s 80+ year history, and much more.
Our staff will customize your visit to cater to your interests and needs.

 EFCO Resources
For additional information about EFCO forming systems,
consult the following catalogs.

EFC-717M EFC-1084M
PLATE GIRDER® EFCO POWER SHIELD

EFC-841M EFC-1234M
CONSTRUCTION E-BEAM® &
SUPPORT SYSTEMS SUPER STUD®

EFC-1015M EFC-1040M
EFCO DECK® EFCO GUIDED
RAIL SYSTEM®

 EFCO Online

www.EFCOFORMS.com
Learn More About EFCO Forming & Shoring Solutions.

www.HandsetFormwork.com
An EFCO website dedicated to handset
concrete forming systems.

www.EFCOOnline.com
Contact EFCO Online at EFCOOnline@
efcoforms.com or call toll free 866-915-4662
for more information and sign on today!

The EFCO PLATE GIRDER ® form system is a registered trademark. This product was designed for use with products © EFCO Corp.
manufactured by EFCO and it is recommended that it not be commingled with products of other manufacturer’s forming systems.
TRUART 3M REV. 2/18