DC GTF (Single Capillary)

S.No.
Stages Manpower Stages

1 Flaring 1 1 Soldering
Gauging and ultrasonic
2 Soldering 1
cleaning
3 Tape 1 1 Tape
4 Tape & Bush Insertion 1 Bending (R20)
Foam and Tape pasting
5 Flaring 2 & Ultrasonic Cleaning 1
pasting
6 Bending 2 Bending (R70)
7 Foam Pasting 1 & 2 1 Silver Tape
8 Foam Pasting (60mm)&(60 mm) 1 Bending (R44,R60)
Foam Pasting (60mm) &
9 Tape Pasting 2 1
Tape
FoamPasting
Pasting
10 Tape Pasting 3 1
(60mm)&(60 mm)
11 Tie Wrapping 1 Tape Pasting(2)
12 Keeping Wire wrap & Tie Cut 1 Tie Wrapping
13 Air Flush + Cape (1 sides) 1 Tie wrap
Air Flush + Cape (1
14 Cap Fitting & Gauging 1
sides)
15 Visual Inspection and packing 1 Cap Fitting
Visual Inspection and
16
packing
17
18
19
20
Total 16
GTF (Single Capillary) Dual Capillary

Manpower Stages Manpower

1 Soldering 1
1 Gauging & Ultrasonic cleaning + Tape Remove 1
1 Bending (R20) ,Capp broken & Connector fittting 2
1 Brazing 1
1 Leak Check 2
2 Tape pasting 1
2 Bending (R70) 2
1 Silver Tape 2
1 Bending (R44,R60) 1
1 Foam Pasting (60mm) & Tape Pasting 1
1 Foam Pasting (60mm)&(60 mm) 1
1 Tie Wrapping 1
1 Fixturing & Foam pasting 1
1 tape pasting 1
1 Tie wrap 1
1 Capp. Cap Fitting 1
Air Flush + Cape (1 sides) 1
Cap fitting & Tie cut 1
Visual Inspection and packing 1

18 23