M/s SIPL-SI JV

SUMMARY SHEET FOR MATERIAL CONSUMP


JUNE 2020
Material Consumed
Quantity
SL. NO. Description Coarse Sand (m3) Coarse aggr. (10mm) (m3)
(m3)
1 PCC M10 0.00
2 PCC M15 550.99 166.95 105.79
3 RCC M25 0.00
5 RCC M30 0.00
6 RCC M30 0.00
Total 550.99 166.95 105.79
LIST OF MANDATORY TEST EXECUTED AT SITE:
FREEQU THIRD PARTY LAB
SL. NO. DESCRIPTION NAME OF TEST TESTS REQUIRED
ENCY TESTING
CUBE TESTING 50 Cum 6 -
1 CONCRETE
SLUMP TEST 20 Cum 25 -
Dimensions 10mm 20mm 10mm/20mm
SIEVE ANALYSIS 40Cum 3 4 1
2 AGGREGATE BULK DENSITY 40Cum 7 1
IMPACT VALUE 40Cum 7 1
CRUSHING VALUE 40Cum 7 1
ORGANIC IMPURITIES 40Cum 4 1
SILT TEST 40Cum 4 1
3 COARSE SAND
BULKING OF SAND 40Cum 4 1
SIEVE ANALYSIS 40Cum 4 1

4 CEMENT Physical and Chemical 50 tons 6


Properties of cement nil

Qty rcv. Test Tests To be


Freequen Tests Conducted
(mT) cy per
Conducted
Dia (mT)
8 mm 30.14 25 1 1
Steel /
5 10 mm 48.86 35 1 2
Reinforcement
12 mm 96.04 35 3 3
16 mm 41.28 35 1 1
20 mm 30.29 45 1 1
25 mm 218.72 45 5 5
32 mm 45 0 0
SI JV
ERIAL CONSUMPTION
20
Material Consumed
Coarse aggr. (20mm)
e aggr. (10mm) (m3) Remarks
(m3)

105.79 157.58

105.79 157.58
EXECUTED AT SITE:
THIRD PARTY LAB DEFICEINCY
TOTAL ACTUAL IN SITE
TESTING (IF ANY)
- 6 6 nil
- 25 25 nil
10mm/20mm 10mm/20mm 10mm 20mm 10mm 20mm
1 8 6 6 nil nil
1 8 6 6 nil nil
1 8 8 nil
1 8 8 nil
1 5 5 nil
1 5 6 nil
1 5 6 nil
1 5 6 nil

3 nil
nil

Tests Conducted Pending Remarks

1 0
2 0
3 0
1 0
1 0
5 0
0 0
ISGEC Heavy Engineering Ltd
SUMMARY SHEET FOR CEMENT CONSUMPTION

Upto Jun-20

Present
Co- Total
Description of Grade of Present Cumulative Month
SL. NO. Unit Previous efficient Consump
Item Concrete Month Quantity Consump
(bags) tion
tion

1 PCC (M10) Cum M10

2 PCC (M15) Cum M15 550.99 550.99 4.96 2733 2733

3 RCC (M25) Cum M25

4 RCC (M30) Cum M30

5 RCC (M35) Cum M35

Total 2733

Total Consumption at Site = 2733

Signature:

Name:

QC Engineer
Billing & Qty Engineer Site Incharge
Agency: SUEZ
ISGEC ISGEC
ISGEC
ISGEC Heavy Engineering Ltd
SUMMARY SHEET FOR CEMENT CONSUMPTION
Upto Jul-20

Present
Co-
Description of Grade of Present Cumulative Month
SL.NO. Unit Previous efficient
Item Concrete Month Quantity Consump
(bags)
tion
1 PCC (M10) Cum M10
2 PCC (M15) Cum M15 550.99 732.54 1283.53 4.98 3648
3 RCC (M25) Cum M25
4 RCC (M30) Cum M30
5 RCC (M35) Cum M35
Total

Total Consumption at Site =


ION

Total
Consump
tion

6392

6392

6392
ISGEC Heavy Engineering Ltd
SUMMARY SHEET FOR CEMENT CONSUMPTION

Upto Jul-20

Present
Co- Total
Description of Grade of Present Cumulative Month
SL. NO. Unit Previous efficient Consump
Item Concrete Month Quantity Consump
(bags) tion
tion

1 PCC (M10) Cum M10

2 PCC (M15) Cum M15 550.99 732.54 1283.53 4.96 3633 6366

3 RCC (M25) Cum M25

4 RCC (M30) Cum M30

5 RCC (M35) Cum M35

Total 6366

Total Consumption at Site = 6366

Signature:

Name:

QC Engineer
Billing & Qty Engineer Site Incharge
Agency: SUEZ
ISGEC ISGEC
ISGEC