Time period of the building along X, Tx = 0.069 sec NBC 105:1994 cl. 7.3
Time period of the building along Y, Ty = 0.123 sec NBC 105:1994 cl. 7.3
Out-of-plane compressive
stress S22 in Grid A-A wall