You are on page 1of 1

Gread Beam Top tie Beam Masonary wall layout

1 2
Foting F1
Column C1
5.0
1.4
+2.9
C1/F1 C1/F1
150
4.8 0.3
A 20
1.4

2875
20

4Ø12 L=3025
2.6
0.5
2.8 3.0
Ø14 C /C 180 L=1800
8C/C 200 both way +0.00
0.3
B

2555
C1/F1 C1/F1

4Ø12 L=2705
300
5
1.5
200 4Ø12
200
-1.8
0.3
Beam on Axis A and B 150

150
150
Ø6 c/c 14 L= 900
2Ø12 L 3550
0.3
15 cm RC Slab
2Ø12 L 550
0.8
25 cm Hard core
25 cm Selected material
50cm thick masonary wall
5cm thick lean concrete
B e a m o n A x i s 1 and 2
2Ø12 L=3550
Laska construction and Industrial College
3Ø12 L= 3050 Department of construction
Drawn by Bizuayehu Shibiru

You might also like