Professional Documents
Culture Documents
E.I. G1 - Tiii - I-2024
E.I. G1 - Tiii - I-2024
2.- Fig.P4; L1 = 2,0m; L2 = 2,0m; L3 = 1,0 m; L4 = 4,0 m; P = 15,0t K; W = 4,0 t/m; H1 = 1,4 m; H2 = 1,40 m.
3. - Fig.P7; L1 = 4,0m; L2 = 4,0m; L3 = 2,0m; L4 = 0,5m; L5 = 3,0m; L6 =1,1m; W1 = 3,0 t/m; W2 = 5,0 t/m; W3 = 4,0t/m;
P = 8,0t; = 45,0°; W4 = 2,0 t/m.
4.- Fig.P8; L1 = 4,0m; L2 = 2,0m; L3 = 1,5m; L4 = 3,5m; L5 = 1,2m; W1 = 3,0t/m; W2 = 4,0t/m; P = 15,0t; = 70,0°; W3
= 1.5t/m; f(x)= (curva parabólica)
5.- Fig.P.9; L1 = 1,0m; L2 = L3= L4 = L5 = L6 = L7 = L8 = L9 = 2,5m; L10 = 1,0m; q1 = 3,0t/m; P1 = 27,0t; 1 = 40,0°; q2
= 2,0t/m; q3 = 4,0t/m; q4 = 3,0t/m; P2 = 19,0t.
6.- Fig.P10; L1 = L10 = 1.0m; L2 = L3 = L4 = L5 = L6 = L7= L8 = L9 = 3,0 m; q1 = 5,0t/m; q2 = 1,5t/m; q3 = 3,0t/m; P1
=29,0t; 1 = 48,0°; P2 = 16,0t; 2 = 30,0°; q4 = 5,0t/m.
7. - Fig.P5; P = 17,0t; W = 2,0t/m; L1 = 1,5m; L2 = 1,5m; L3 = 1,2m, L4 = 1,5m; L5 = 1,5m; H1 = 1,4m; H2 = 1,4m
8. - Fig.P6; L1 = 2,1 m; L2 = 1,0 m; H1 = 1,4 m; H2 = 1,4m; W1 = 5,0t/m; W2 = 4,0t/m; W3 = 5,0t/m
9.- Fig.P17; L1 = 2,60 m; L2 = 1,0 m; L3 = 2,60 m; H1 = 1,4 m; H2 = 1,4 m; CH = 17,5 cm; HU = 32,5 cm, W1 =
5,0t/m; W2 = 5,0t/m.
10.- Fig.P18; L1 = 2,0m; L2 = 3,0m; H1 = 1,0m; H2 = 1,5m; H3 = 1,0m; W1 = 7,0t/m; P1 = 27,0t; P2 = 9,0t
14.- Fig.P20; L1 = 1,2m; L2 = 2,0m; L3 = 2,5m; L4 = 2,0m; H1 = 4,0m; W1 = 3,0t/m; P1 = 35,0t; = 80,0° ; W2 = 4,0t/m
(carga parabólica); M1 = 32,0t-m.
17.- Fig.P21; L1 = 3,0 m; L2 = 3,0m; L3 = 2,5m; L4 = 1,5m, H1 = 5,0m; H2 = 3,0m; H3 = 5,0m; W1 = 2,5t/m; W2 =
4,0t/m; (carga tangencial a la curva); W3 = 3,5t/m;(carga parabólica).
19.- Fig.P13; L1 = 3,0m; L2 = 2,0m; L3 = 2,0m; L4 = 2,0m; H1 = 3,0m, H2 = 5,0 m; W1 = 4,5t/m; P = 36,0t; = 30,0°
20. - Fig. P14; L1 = 3,0m; L2 = 2,0m; L3 = 3,0m; L4 = 3,0m; H1 = 3,0m; W1 = 7,0t/m; P = 31,0t.
21.- Fig.P15; L1 = 3,0m; L2 = 4,0m; L3 = 2,0m; H1 = 3,0m; H2 = 4,0m; W1 = 4,0t/m; P = 15,0t; = 35,0°
23.- Fig.III.P17; W1 = 5,0t/m. (f(x) = curva parabolica); P = 30,0t, α = 110,0°, H 1 = 5,0m, H2 = 3,0m, L1 = 5,0m, L2 =
1,5m.
24.- FigIII.P18; W1 = 6,0t/m; (f(x) = carga parabolica); P1 = 18,0t, W2 = 5,0t/m, H1 = 2,0m; H2 = 3,5m, H3 = 2,0m, H4 =
3,0m, L1 = 3,0m; L2 = 2,5 m.
ESTRUCTURAS ISOSTATICAS
PRACTICAS GRUPO G1
TEMAS III
SEMESTRE I-2024