INTRODUCTION.
This is a project cycle was done in kwa babu area. The main focus for the project was dealing
with food crisis which was found out that it was caused by high levels of poverty. We did a
context analysis and represented it on a transect map. The area map was taken from Kwa Babu
area which is a small area with a large population of people who are generally poor.
1.0 IDENTIFICATION
This is the process of project identification.
BACKGROUND
Here we did a context analysis and came up with a map of kwa Babu area. We identified all
features in kwa Babu area and represented it in the map. The map description is as follows
When you enter kwa Babu area you will see a cattle dip as the the first thing, and then when you
walk past the cattle dip, you you will find a junction going to different places 1 road directly to
the market the other directs you to different town Besides the junction there is a forest called
Matamu Forest.
Past the market there is a school called Benedict's School which is opposite Kwa Babu markets.
When you walk past the Benedict's school there is Benedict's hospital and Benedict's Church.
Beside the church there is a main road that runs through khalifa City and the other side of the
road there is river Osugo that runs from the West to the Northeast of a kwa Babu area. On the
same side there is also yakobo bridge and a forest and three hills.
On the Eastern part of kwa Babu area there is a village where people live there are a lot of huts
and small houses people are so squeezed.
Fig1.1
We did a problem identification to ascertain the problem that are faced and also to know which
problem required faster intervention. An overview of the problems faced in Kwa babu are and
the ranking were as follows;
Kwa Babu area faces a lot of challenges including increased poverty, teenage pregnancies and
high levels of crime. Our projects aimed at solving the problem that require faster intervention
and hence we did a ranking of the three problems and after the ranking we found out that poverty
required faster intervention as compared to teenage pregnancy and high crime rates.
After settling on poverty, we did a problem-solving tree to identify its causes and effects.
Problems
1. Increased poverty -A
2. Teenage pregnancies -B
3. High crime rates -C
A B C
A
B
C
Results
Increased poverty -2
Teenage pregnancies -1
Causes and effects. A problem tree was designed to help in knowing the causes and effects
PROBLEM TREE
Increased poverty
levels
We did analysis of the seasonal and daily activities for people in kwa Babu area.
The following seasonal calendar was to identify what activity is done at what time of the year.
We found out they mostly do small-scale farming of food crops and also small-scale fishing from
the river. In January and February they prepare land and also the do small-scale fishing, on
March and April they plant crops and then harvest from August another plantation is down from
November and harvested in December.
1.4.1 Seasonal calendar
Month Activities
This is an overview of the daily activities for people in kwa babu area. Women wake up before
men and start preparation for the family, mostly women do house chores and the cleaning of the
house and cooking and men do other outdoor jobs and providing for the family Both men and
women are free in the afternoon hours from 4 to 6 p.m. and then sleep from around 10 p.m.
Productivity of goods and services Who does the work Frequency of activities
men women
Preparing land yes During season
women men
women men
Once preliminary stake holders’ analysis was done with, the groups concerned agreed on the
following work plan:
Interviewing the community members that is a section of them within a period of 4 days.
Doing research on the causes of poverty in the area within a period of two days.
Consulting bodies which can assist in reducing poverty levels in the society.
Preparation of the work plan.
Here the problem statements (negatives) are turned to objective statements (positives)
Low birthrates
Low population
Reduced poverty
levels
High population
High birthrates
LOGICAL FRAMEWORK.
A logical frame work aimed at reducing the levels of poverty in kwa babu area
PROJECT PROPOSAL
Nature of support.
To curb poverty through curbing high population which leads unemployment and later leading to
poverty. The nature of support is through loans and grants from well wishers, national and
international donors.
Desirable attributes
Community members are involved in active participation and there is input from local
community to ensure the project aligns with their needs and aspirations.
Sustainability aspect
There is human sustainability aiming to maintain and improve human capital in the society.
Different groups have immersed themselves into the community in order to understand the
community members.
The visible impacts include the improved way of life by most community members due to
increase in employment rate, reduced rate of population growth
The project is linked with ongoing activities in the society such as land preparation for farming.
Personnel
Board of directors
Project directors
Project managers
employees
Community members
Its transparency has been achieved by creation of a project management system in which all team
members can access all relevant information about the project easily and efficiently.
The beneficiaries of the project include low-income families in the area and the employed youths
in the area. The stake holders include local government authorities, non-governmental
organizations, community leaders and representatives and private sector businesses.
PROJECT IMPLEMENTATION
Work plan
The project life is estimated to take 5 years and starts on 15th November 2023 to 15th November
2028. The goal of the project is to reduce levels of poverty in kwa Babu area by 2030. The
project plans to offer free training and contraceptive and any other support that can help reduce
levels of poverty. Our estimated budget is 2 million Kenya shillings. The project is expected to
be funded by donors from both national and international agencies. The project is expected to
build new institutions like markets and also social hall for gatherings and trainings, new
hospitals, increase the number of contraceptives
The following is the list of requirements and deliverables and estimated due dates.
Building foundation and constructions to begin by march 2024, supply of contraceptives to begin
from November 2023.
The project CEO overseas the project, the project director is responsible for all communications
to the relevant groups, the project manager is responsible for the performance if the employees
and writing reports and the employees are responsible for hand jobs
Gantt chart
Gantt chart to represent the work plan and time lines. Deliverables are represented by the month
of supply all the way. Other deliverables will be done in phases and which is also represented in
the chart.
GANTT CHART
contraceptives
wood
metal works
cement
stones
0 5 10 15 20 25
Focus
The project is showing impacts on target groups
Responsibility
This can be achieved by the community itself by giving the community a chance to
analyze and identify solutions which in turn strengthens their commitments to the
project.
II. Evaluation
Purpose
Focus
responsibility
since evaluation is led by people external to the project management e.g. funding
bodies there is institutional strengthening
In terms of technical aspects, the project is Up To date. The project has put to account the trading
and price aspect. Being aware of fluctuations in market prices and the project has put to account
that aspect to avoid getting lose. Also, all the project data has been updated in the system for
back up in case of any lose and is protected by passwords.
Financial
The project is worthwhile since the cost for project development is nothing compared to the
benefits. The project will be financed since there are insufficient funds to cover the expenditure
of the project. The project budget will be as per the current market price of product and also give
some allowance In case of fluctuations with market prices. The project will have a good cash
flow to sustain and grow the investments.
Economic
The project will be beneficial to the economy at large in that it will bring revenue to the
government through text collection from different purchase of goods and services. The project
will benefit the society’s economy by creating opportunities for people to earn a living and
develop themselves. The project has put to account factors affecting cash flows, including
depreciation and tax effects, price level changes, and treatment of risk and uncertainty.
The project will benefit all groups of the society at all levels from individuals, household and
community at large. The project will impact women by giving them opportunities to participate
decision making also by empowering women to stand on their own and build themselves through
income generating activities. The project will impact men by creating opportunities for them to
get employment where man power is needed. The project also has social benefits of bringing
people together to work as a team.
Institutional
The project supports the existing institution such as school, businesses and churches also help in
improving the standards of existing institutions and also develop new ones to meet the required
standards of service needed. The project also has permits from the government institutions and
hence operates within the policies of the society.
Environmental
The project has little effects on the environment only when it comes to finding materials for
construction of new institutions. Materials like bricks and wood for construction have to be
extracted from the land and trees cut down. There are measures that have been put in place to
reduce the effects on the environment for example afforestation and reforestation for any tree
cut. Afforestation and reforestation will help in restoring the environment structure and make it
greener.
Political
The project fits national, regional, and sectoral plans and policies since it got approval from
government institutions before commencement. The project has the necessary documents to
prove approval from government institutions.
I confirm that the project is complete, all review have been done and documentations
complete.i believe by 2030 the issue of poverty will no longer be an issue in kwa babu area.